| Location: | Florida |
|---|---|
| Posted: | Dec 15, 2025 |
| Due: | Jan 29, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-26-002 |
| Publication URL: | To access bid details, please log in. |
Project Description: The existing Southwest Water Treatment Plant (WTP) has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, and Ground Storage Tank (GST) for storage. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions WATER/WASTEWATER TREATMENT PLANT.... POSTING OF INTEND ...
State Government of Florida
Bid Due: 10/11/2040
...Agency Decisions WATER/WASTEWATER TREATMENT PLANT Advertisement Number: ITB-DOT-10/11-4018TB-AWARD... WATER/WASTEWATER TREATMENT PLANT. Please direct ...
State Government of Florida
Bid Due: 10/11/2040
...services on water treatment plants, wastewater treatment plants, and groundwater wells for Correctional... ...
State Government of Florida
Bid Due: 8/30/2027
...Project: WATER TREATMENT PLANT NO. 3 EXPANSION Ref. #: ITB-UT-26-12 Type: ITB Status: ...
City of Palm Coast
Bid Due: 10/20/2026