| Location: | Illinois |
|---|---|
| Posted: | Jan 17, 2025 |
| Due: | Feb 24, 2025 |
| Agency: | Gurnee village |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Sealed bids for the 2025 Water Main Improvements – Stoney Island Region project in Village of Gurnee, Illinois, will be received until 10:30 AM on February 24th, 2025 at the office of the Civil Engineer of the Village of Gurnee, 325 N. O’Plaine Road Gurnee, IL 60031, at which time the bids will be publicly opened.
The project consists of installing approximately 3800 LF - 8” PVC C900 WM, 1325 LF - 6” PVC C900 WM, 13 EACH - Fire Hydrants, 1 EACH – Fire Hydrant Relocation, 11 Each – 8” Gate Valve in 4’ Vault, 1 EACH – 6” Gate Valve in 4’ Valve Vault, 71 -1.5” water service connection, 225 FT – Remove and Replace Culvert, 335 FT – 12” Water Main Quality Storm Sewer, 63 FT – 8” Water Main Quality Storm Sewer, 3 EACH – 4’ Diameter, Type A, Manhole, Type 8 Grate, 5,500 SY - Topsoil Furnish and Place, and all other work necessary to complete the improvements.

With GovernmentContracts, you can:
...Project ID: Bid #2027-01 Title: Potable Water Distribution System Improvements - Contract C... ...
City of Bloomington
Bid Due: 7/08/2026