| Location: | Nebraska |
|---|---|
| Posted: | Feb 6, 2025 |
| Due: | Feb 28, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA460025Q0019 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
1. This requirement is to install 3 combination Icemaker and Hot/Cold water dispensers in 3 different locations throughout B301D facility for the 97th Intelligence Squadron on Offutt Air Force Base (AFB), NE.
2. The provided installed items shall meet the following requirements:
-A Combination Ice Maker and Hot/ Cold Water Dispenser Shall utilize 115-120V outlets.
-The condensate pump shall utilize the current 115V-120V outlets.
-The unit must be sized to fit in a space with the dimensions of 29” wide by 60” High By 23” Deep.
3. The unit must have a filtration process that includes a 3-stage system at a minimum. This includes a Dual Reverse Osmosis, Pre-Carbon, Mineral Carbon and Sediment. This filtration system must be enclosed inside the unit. The unit must dispense Hot water from a minimum .6-gallon reservoir and cold water from a 2-gallon reservoir with a 1-gallon flow rate per minute. The unit must produce 30lbs to 40lbs of ice per day. The unit must have touchless operation system.
4. Contractor shall be responsible for the installation of 115V/120V outlets, drain, and water supply to support the installation of Combination Ice Maker and Hot/ Cold Water Dispenser and condensate pump.
5. Contractor shall be responsible for the installation of Combination Ice Maker and Hot/ Cold Water Dispenser and condensate pump. Contractor shall be responsible for providing all the tools, equipment, and parts necessary to install the machines. Contractor shall be responsible for all cleanup and the disposal of any waste generated during the installation.
A site visit will be held on: 11 February 2025 at 2:30 PM CST
Technical questions will be due by: 13 February 2025 at 12:00 PM CST
Technical question answers will be attached to this solicitation as an amendment by: 17 February 2025 at 12:00 PM CST
Quotes will be due by: 28 February 2025 at 10:00 PM CST
Offer acceptance period must be valid for 60 days after close of this solicitation.
*** If you intend on attending the site vist please fill out the attached VENDOR NCIC SCREENING & PASS REQUEST SPREADSHEET attached and return to ryan.devincent@us.af.mil by 07 February 2025.
| Feb 3, 2025 | [Solicitation (Original)] Purchase and install 3 water fountains |
| Feb 7, 2025 | [Solicitation (Updated)] Purchase and install 3 water fountains |
| Feb 13, 2025 | [Solicitation (Updated)] Purchase and install 3 water fountains |
| Feb 25, 2025 | [Solicitation (Updated)] Purchase and install 3 combination Icemaker and Hot/Cold water dispensers |

With GovernmentContracts, you can:
NOTICE OF TAKING BIDS FOR THE CONSTRUCTION OF THE LORRAINE AVENUE RESURFACING PROJECT
City of Sioux City
Bid Due: 8/21/2026
NDERFP260303 - Grants Management System PLEASE NOTE: THE BELOW SOLICITATION IS THE RESPONSIBILITY
State Government of Nebraska
Bid Due: 6/17/2026
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Omaha County
Bid Due: 6/24/2026
REQUEST FOR PROPOSAL 6245 S3740 ITP EXPANSION STEEL SUPPORTS Contact - Tony Autry
Omaha Public Power District
Bid Due: 6/30/2026