| Location: | Washington |
|---|---|
| Posted: | Oct 4, 2025 |
| Due: | Oct 20, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 10/20/25 1:00pm |
Spokane, WA
This project consists of the installation of approximately 7500 LF of cure-in-place pipe (CIPP) in the following approximate quantities: 3000 LF of 8” dia., 1700 LF of 10” - 24” dia. and 2800 LF of 30” - 36” dia. Also included are reinstatements of side sewer reconnections, CCTV and cleaning, bypass pumping, traffic control and other related items.

With GovernmentContracts, you can:
...control devices (e.g., signals, roundabouts, crosswalk devices) 7. Installation of multimodal facilities.... Installation ...
Moses Lake city
Bid Due: 11/25/2026
...control, planting, traffic control and other work. Involves 65 items and 60 working ...
State Government of Washington
Bid Due: 11/18/2026
...curbs and gutters, drainage pond and ditches, erosion control, illumination system, permanent signing..., ...
State Government of Washington
Bid Due: 11/18/2026
...Terminal Access Request Form" at the following location: http://www.wsdot.wa.gov/publications... at the terminal, traffic ...
State Government of Washington
Bid Due: 12/02/2026