Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Mar 25, 2026 05:52 am EDT
-
Original Date Offers Due: Apr 24, 2026 04:30 pm EDT
-
Inactive Policy: 15 days after date offers due
-
Original Inactive Date:
May 09, 2026
-
Initiative:
Classification
-
Original Set Aside:
-
Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
-
NAICS Code:
-
336611 - Ship Building and Repairing
-
Place of Performance:
Description
CONTACT INFORMATION|4|N741.3|GDS|717.605.1309|alison.n.bruker.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|MIL-I-45208|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
QUALIFICATION REQUIREMENTS (DEV 2026-O0042)(FEB 2026)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF).
This solicitation is for the following PROCUREMENT:
1. CLIN 0001; TILE, NSN: 2090 012244913 ST; Quantity 653.
2.The resultant award of this solicitation will be issued bilaterally,requiringthe contractor's written acceptance prior to execution.
3. All contractual documents (i.e. contracts, purchase orders,taskorders,delivery orders, and modifications) related to the instantprocurement are considered to be ""issued"" by the Government when copies areeither deposited in the mail, transmitted by facsimile,
or sent by otherelectronic commerce methods such as email. The Government's acceptance of thecontractor's proposal constitutes bilateral agreement to ""issue"" contractualdocuments as detailed herein.
4.If requirement will be packaged at alocation different from theofferor's address, the offeror shall provide the name, street address, and CAGEof the facility.
5.Any contract awarded as a result of this solicitation will be DO certifiedfor national defense under the Defense Priorities and Allocations System(DPAS).Provision 52.211-14, Notice of Priority Rating for NationalDefense,Emergency Preparedness, and Energy Program
Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order.
6.If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.govwebsite. After requesting access, send an email to the POC listed on thesolicitation.
7. THIS REQUIREMENT REQUIRES HIGHER LEVEL INSPECTION CODE: MIL-I-45208
8. FAR 52.209-1 is hereby incorporated into this solicitation.
9. A DD254 applies to this requirement. Offerors must have a valid U.S.security clearance of classified or higher in order to respond to this RFPbecause the RFP includes an annex (information) classified at the confidentiallevel which will be released only to
offerors possessing the appropriateclearance. All classified material must be handled in accordance with theNational Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M)and Industrial Security Regulation (DoD 5220.22-R).
10. Offerors whose company size is greater than the size standard fortheapplicable NAICS in FAR 52.204-8 herein(1250 employees) shall submit aSmall Business Subcontracting Plan with their proposal, in accordance withFAR52.219-9.
Government source inspection is required.
Unit Price:__________ FIRM
Total Price:__________ FIRM
Procurement Turnaround Time (PTAT) :_________
Awardee CAGE: __________
Inspection & Acceptance CAGE, if not at source:__________"
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the TILE , part of the ;Special Hull Treatment (SHT) Program. This specification covers one class of SHT Tiles, identified as Type AA-18; .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.1.2 The "Document Changes" section provides supersessions/changes to referenced documents.
2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,
however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
2.3 ;Certian documents pertaining to this item are classified. The seller must be cleared to receive these classified documents. A DD form 254 is required. Vendors require access to Confidential National Security Information. Drawings (53711) 5808343 and
5808349 are classified. Classification is Confidential.;
2.4 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;DR# 5808343 & 5808349
Confidential ;
DRAWING DATA=5808277 |53711| G| |D| | | |
DRAWING DATA=5808343 |53711| E| |D| | | |
DRAWING DATA=5808349 |53711| C| |D| | | |
DOCUMENT REF DATA=MIL-STD-105 | | |E |950227|A| | |
DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03|
DOCUMENT REF DATA=MIL-STD-147 | | |D |960325|A| | |
DOCUMENT REF DATA=MIL-STD-177 | | |A |880531|A| | |
DOCUMENT REF DATA=FED-STD-313 | | |D |000321|A| |01|
DOCUMENT REF DATA=MIL-STD-407 | | | |910321|A| | |
DOCUMENT REF DATA=MIL-STD-973 | | | |920417|A| | |
DOCUMENT REF DATA=MIL-STD-2073 |0001| |D |020510|A| |01|
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=S6360-AD-HBK-10 | | | |940930|E| | |
DOCUMENT REF DATA=ASTM-D1974 | | |92 |940301|A| | |
DOCUMENT REF DATA=ASTM-D2240 | | | |920622|A| | |
DOCUMENT REF DATA=ASTM-D297 | | | |930915|A| | |
DOCUMENT REF DATA=ASTM-D3767 | | | |920417|A| | |
DOCUMENT REF DATA=ASTM-D3951 | | | |901221|A| | |
DOCUMENT REF DATA=ASTM-D412 | | | |921115|A| | |
DOCUMENT REF DATA=ASTM-D471 | | | |980911|A| | |
DOCUMENT REF DATA=ASTM-D5118/D5118M | | |90 |940301|A| | |
DOCUMENT REF DATA=ASTM-D573 | | | |880527|A| | |
DOCUMENT REF DATA=ASTM-D635 | | | |910715|A| | |
DOCUMENT REF DATA=ISO9001 | | | |010417|A| | |
DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03|
DOCUMENT CHANGE DATA=DI-E-2121 |DI-MISC-80678
DOCUMENT CHANGE DATA=DI-T-2072 |DI-NDTI-80809
DOCUMENT CHANGE DATA=DI-T-4902 |DI-MISC-80678
DOCUMENT CHANGE DATA=MIL-P-116 |MIL-STD-2073-1
DOCUMENT CHANGE DATA=PP-B-636 |ASTM-D5118 & ASTM-D1974
3. REQUIREMENTS
3.1 ;This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition
of the part from the approver source(s).The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part.
An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction
over the part in the intended application.
Contractors are cautioned that award of this contract/purchase order will not be delayed solely for the purpose of approving additional sources.
Contractors desiring to qualify under the Engineering Source Approval Qualification (ESAQ) program are urged to contact the Government design control activity to arrange for test and, if approved, added to the (ESAQ) list of approved sources for subsequent
procurements.;
3.2 Manufacturing and Design - The TILE furnished under this contract/purchase order shall meet the material and physical requirements as specified ;on 53711 drawing 5808277, CONFIDENTIAL 53711 DRAWING 5808349, and CONFIDENTIAL 53711 drawing 5808343 except as
amplified or modified herein.; .
3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,
Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original
and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until
another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,
the date of the granting of the authorization, and the name of the granting authority.
Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.
The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.
Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.
3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material
will be cause for rejection.
If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The
contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting
Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of
contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are
located so as not to constitute a contamination hazard.
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a
polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the
requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.
Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:
Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a
component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface
ship atmosphere.
3.5 Security Clearance Required - This contract/purchase order requires the Contractor to have a Government Security Clearance in accordance with the attached Contract Security Classification Specification (DD Form 254).
3.6 ;Security - The contractor is responsible to provide security safeguards for all CONFIDENTIAL data, molds, tiles and the controlled area as specified in paragraph 6.8 of 53711 Drawing 5808277.;
3.7 ;MOLDS - The contractor is responsible for designing molds to produce the tiles as specified in paragraph 6.3 of 53711 Drawing 5808277.
The contractor shall certify that all molds are equivalant in critical dimensions and allowable tolerances.The government reserves the right to examine mold drawings or molds and to accept or reject plan tolerances.
The molds are UNCLASSIFIED but shall be afforded maximum protection to ensure minimum visibility and prevent access by unauthorized personnel in accordance with paragraph 6.3 and 6.8.1 of 53711 Drawing 5808277.;
3.8 ;Material Safety Data Sheets (MSDS) - Material Safety Data Sheets shall be in accordance with paragraph 3.6 of 53711 Drawing 5808277.;
3.9 ;Responsibility for Inspection - The contractor is responsible for the performance and certification of all inspection requirements as specified in paragraph 4.1 of 53711 Drawaing 5808277.;
3.10 ;Adhesion of Tiles to Steel - "SHT" Epoxy Paint Hull Preservation DTNSRDC - 2844-1109 (NNVSEA Drawing 53711, 5808333) and Epoxy Adhesive DTNSRDC 2844-1102 (NAVSEA Drawing 53711, 5808332) will be the only paint and adhesive to be used for "SHT" material
"Adhesion of Tiles to Steel" testing.;
3.11 Marking - This item shall be physically identified in accordance
with ;the requirements of MIL-STD-129 and paragraph 3.2.1 of 53711 Drawing 5808277; .
3.12 ;Special Marking - Special Marking shall be in accordance with paragraph 5.2.3 and 5.2.3.1 of 53711 Drawing 5808277.
In addition, all outside containers are to be marked with black letters a minimum of one (1) inch high in non - fading, water resistant ink, with the designation " SHT ".;
3.13 ;Production Lot Test/Quality Conformance Inspection Approval (Government Testing) - Production Lot Test (PLT)/Quality Conformance Inspection (QCI) and approval is required.;
3.13.1 ;Material submitted for Production Lot Test/Quality Conformance Inspection shall be certified to have the same composition, construction and manufacturing process as the material supplied for the First Article Test/ Engineering Source Approval
Qualification (ESAQ) Testing.;
3.13.2 ;Production Lot Test/Quality Conformance Inspection - The Test/Inspections to be performed for Production Lot/Quility Conformance Inspection shall be as specified in Table III of 53711 Drawing 5808277.;
NOTE: LOT - A lot shall consist of all tiles produced in one plant under essentially the same conditions and offered for inspection at one time. In each case, the nunber of tiles offered for inspection constitute the lot size.
TILE AND FAIRING STRIP TEST COSTS & TILES REQUIRED:
Lot Size Tiles Required
51 - 90 3
91 - 150 5
151 - 280 8
281 - 500 8
501 - 1200 13
1201 - 3200 20
3101 - 10000 32
3.13.3 ;Sampling and Rating for Production Lot Test/Quality Conformance Inspection - Sampling for Production Lot Test/Quality Conformance Inspection (Non Destructive and Destructive) shall be in accordance with the requirements of paragraph 4.3.3.3 and Table
IV of 53711 Drawing 5808277.
Sampling for Production Lot Test/Quality Conformance Inspection (Performance Test) shall be in accordance with the requirements of paragraph 4.3.3.4 of 53711 Drawing 5808277.;
3.14 ;Manufacturing Accountability and Control - The contractor shall develop auditable records to account for all tiles molded in accordance with paragraph 6.8.4 of 53711 Drawing 5808277.;
3.15 ;Disposition of Non - Conforming, Excess, or Scrap Material - Disposal of non - conforming or scrap material shall be in accordance with the requirements of paragraph 6.5 of 53711 Drawing 5808277.;
3.16 ;Cleaning Procedure - See section 6 (NOTES) of this specification for Cleaning Procedure.;
3.17 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.
3.18 Production Lot Approval (Government Testing) - Production Lot Test and approval is required.
3.19 ;The supplier shall provide a Certificate of Conformance (COC) or Certificate of Acceptance (COA) with each SHT material. Package one COC/COA per item. See CDRL A0001 for more information. ;
4. QUALITY ASSURANCE
ANY REFERENCE TO FIRST ARTICLE TEST INFORMATION (GOVERNMENT - DESTRUCTIVE) IS HEREBY WAIVED FOR THIS ITEM
ANY REFERENCE TO FIRST ARTICLE TEST INFORMATION (GOVERNMENT - NON-DESTRUCTIVE) IS HEREBY WAIVED FOR THIS ITEM
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,
the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers
certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.
4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any
inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance
does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during
the performance of the contract and for a period of four years after final delivery of supplies.
4.5 ;Certification/Data Report (MOLDS) - The contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423).;
4.6 ;Material Safety Data Sheet (MSDS) - The contractor shall prepare and submit material safety data sheets in accordance with the contract data requirements list (DD Form 1423).
The MSDS is form OSHA-20 and is found as part of FED-STD-313.;
4.7 ;Responsibility for Inspection - The contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423).;
4.7.1 Units that undergo destructive testing are rendered unusable and shall not be considered in the quantity listed for the "SHIP TO" on the schedule page of this contract/purchase order. The number of units that will be destroyed under the destructive
testing shall be inaddition to the quantity required on the schedule page.
4.8 ;Production Lot Test/Quality Conformance Inspection (LOT ACCEPTANCE TEST) (Government) - The Contractor shall deliver test samples to the Government Test Facility for Production Lot/Quality Conformance Inspection in accordance with the requirements
specified in paragraph 4.3 of 53711 Drawing 5808277. The Test/Inspection shall consist of all the requirements of 53711 Drawing 5808277, paragraph 4.3.1, Batch Acceptance, paragraph 4.3.2 Tile Assembly Inspection and paragraph 4.3.3, Lot Acceptance Test.;
4.9 ;Tile Assembly Inspection - The Contractor shall preform Tile Assembly Inspection as specified in paragraph 4.3.2 of 53711 Drawing 5808277.;
4.10 ;Certification Data Report (Material For Production Lot Test/Quality Conformance Inspection) - The Contractor Shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423).;
4.11 ;Production Lot Test/Quality Conformane Inspection - The Test/Inspections to be performed for Production Lot Test/Quality Conformance Inspection (Lot Acceptance) shall be as specified in Table III of 53711 Drawing 5808277.
Sampling for Lot Acceptance Test shall be in accordance with the requirements of paragraph 4.3.3.3, Table IV and paragraph 4.3.3.4 of 53711 Drawing 5808277.;
4.12 ;NOTE
Production Lot Test/Quality Conformance Inspection - Lot; A lot shall consist of all tiles produced in one plant under essentially the same conditions and offered for inspection at one time. In each case, the number of tiles offered for inspection constitute
the lot size.;
4.13 ;Production Lot Test/Quality Conformance Inspection - Sampling for Lot Acceptance Performance Test shall be in accordance with the requirements of paragraph 4.3.3.4 of 53711 Drawing 5808277.
NOTE: Sub-lots shall be generated which consist of a maximum of 450 tiles. Nine (9) tiles shall be selected at random from each sub-lot and submitted to the designated Government Testing Facility for Lot Acceptance performance Test.;
4.13.1 ;Production Lot/Quality Conformance Inspection Test Samples for Lot Acceptance Test shall be shipped to:
COMMANDER
NAVAL SURFACE WARFARE CENTER, CARDEROCK DIVISION 5001 SOUTH BROAD STREET ATTN CODE 617 LISA WEISER 215-897-1612 PHILADELPHIA PA 19112;
4.14 Production Lot Test Approval - Production Lot Test approval is required prior to shipment of the Production Lot.
4.15 ;Manufacturing Accountability and Control - The contractor shall prepare and submit a report in accordance with the Contract Data Requirements List
(DD Form 1423).;
4.16 ;A Certificate of Conformance (COC) or Certificate of Acceptance (COA) shall accompany each SHT material, as stated within PNS ltr 9110 Ser 250/009 of 1 Mar 23. Package one COC/COA per item. SUPPLIER FORMAT IS ACCEPTABLE. As indicated in CDRL A0001.;
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 ;Note: All Special Hull Treatment operations previously requiring 1,1,1-Trichloroethane shall use BUTYL ACETATE as a direct replacement. BUTYL ACETATE shall conform to the requirements of ASTM D 4615.;
SHT Tile Cleaning for the Tile Manufacturing Process
MATERIAL REQUIREMENTS
a.Butyl Acetate (ASTM D 4615)
b.Clean, White Cotton Rags
WARNING
Consult the MSDS for Butyl Acetate prior to initiating the cleaning process to determine the proper PPE and environmental controls required by your site. Additionally, be sure that use of this solvent does not violate, state, or federal environmental
regulations.
NOTE
This procedure shall be used before and after the etching process. Before etching, only the molded side shall be cleaned. After etching, both sides of the tile shall be cleaned with this procedure.
PROCEDURE:
1. Place tile on a clean surface.
2. Scrub surface of the tile with a rag moistened with Butyl Acetate.
NOTE
Butyl Acetate shall be poured onto the rag to prevent contamination of the cleaning solvent-DO NOT DIP RAG INTO SOLVENT. Change rags frequently.
3. Repeat the cleaning of the tile surface 2 to 3 times as necessary to eliminate contamination on the tile.
NOTE
The white cotten rag will be blackened somewhat by the cleaning process. Continue the scrubbing the tile surface until the rag does not get any lighter with successive washes.
4. Allow the solvent to flash off (evapporate) for at least one half hour prior to stacking or packaging the tile.
NOTE
Do not recontaminate the tile after the cleaning by placing it in contact with unclean surfaces.
6.2 ;Initial (First Time) testing (First Article Test/ESAQ and Production Lot Test/Quality Conformance Inspection) for each lot or sub lot shall be at the expense of the Government. Second time testing or retesting will be at the expense of the Contractor.;
6.3 ;Shelf Life - SHT Tiles shall have a five (5) year uninstalled shelf life from date of manufacture.;
6.4 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)
(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.
A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.
B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.
C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410P, 101 Strauss Avenue
Indian Head, MD 20640-5035
D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for
certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.
E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:
Contracting Officer
NAVICP-MECH
Code 87321
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:
Commanding Officer
NAVICP-MECH
Code 009
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.
6.5 Information regarding abbreviations, symbols and codes appearing on DD Form 1423 - The following information is provided to assist in understanding the intent of the requirement to provide a deliverable item to the government. The explanation of
abbreviation, symbols and codes found in a block follows the block number as they appear on the DD Form 1423.
Block A: Is the actual contract line item no.
Block B: Is the actual collective physical list of the deliverable item(s)
which are part of the total requirement of the contract/purchase
order.
Block C: Is the category of data required, TDP is defined
in MIL-T-31000. TM is defined in Part 1X, Section B
of DODI 5000.2. NAVICP has reasoned that most DD Form 1423's
included in our solicitations meet the requirement of TDP as
NAVICP does not regularly purchase only Technical Manuals without
purchasing hardware and related TDP software. Therefore,
most NAVICP DD Form 1423 category code will be TDP.
Block D: Is the name of the parent system, next higher assembly, or the item
being purchased.
Block E: Is the purchase request number, request for proposal number,
invitation for bid number or another number for tracking and
monitoring purposes.
Block F: Is the successful offerors name and or cage code.
Block G: Is the name of the individual and or the code/activity of the
individual who prepared the DD Form 1423 and included the
requirement in the Technical Data Package (TDP).
Block H: Self explanatory.
Block I: Is the name and signature of the individual who approved the content
and the need for inclusion of the DD Form 1423 in the TDP.
Block J: Self explanatory.
Block 1: Is the Exhibit Line Item Number (ELIN).
Block 2: Is the title of the data item cited in Block 4.
Block 3: Is the subtitle of the data item cited in Block 4 and is used if
the title requires clarification.
Block 4: Is the actual Data Item Description (DID) number or the actual
Technical Manual Contract Requirements Number. In the event
the DD Form 1423 is requiring a technical manual the numbered
TMCR will be an attachment to the contract/purchase order.
Block 5: Is the section and paragraph area, where the requirement
statement for the DD Form 1423 will be found.
Block 6: Is the activity that will inform the contractor of approval,
conditional approval or disapproval of the deliverable item.
Block 7: Is a code which designates authority for inspection and
acceptance of the deliverable item. The definition of the
codes is as follows:
DD Form 250 Code Inspection Acceptance
SS (1) (2)
DD (3) (4)
SD (1) (4)
DS (3) (5)
LT (6) (7)
NO (8) (8)
XX (9) (9)
(1) Inspection at source.
(2) Acceptance at source.
(3) No inspection performed at source. Final inspection
performance at destination.
(4) Acceptance at destination.
(5) Acceptance at source. Acceptance based on written
approval from the Contract Officer.
(6) Letter of transmittal only. LT should not be used when
inspection is required. The data is sent by the
contractor directly to the personnel listed in Block 14
of the DD Form 1423. LT is used when the contracting
agency does not desire to have a DD Form 250 for each
and every piece of data developed by the contractor.
The only other authorized use of LT is the special
case where the contracting agency does not desire to
have separate DD Forms 250 but desires to have a
Government quality assurance representative perform
inspection. The Government quality assurance
representative shall be listed on the distribution
in Block 14 and requested to provide comments via
the quality assurance letter of inspection.
Use of the symbol LT is not authorized for data comprising
final delivery of Technical Data Package of for Technical
Manuals. (LT may, however, be used for delivery of
preliminary TDP's or TM's).
(7) As specified in Block 8 of the DD Form 1423.
(8) No inspection or acceptance required. No DD Form 250 or
letter of transmittal required.
Use of the symbol NO is not authorized for data comprising
Technical Data Packages or for Technical Manuals.
(9) Inspection and acceptance requirements specified elsewhere
in the contract.
Block 8: Is the approval code - Items of critical data requiring
specific advanced written approval prior to distribution of
the final data item will be identified by placing an "A"
in this field. This data item requires submission of a
preliminary draft prior to publication of a final document.
When a preliminary draft is required, Block 16 of the DD
Form 1423 will show length of time required for Government
approval/disapproval and subsequent turn-around time for the
contractor to resubmit the data after Government
approval/disapproval has been issued. Block 16 will also
indicate the extent of the approval requirements, e.g.,
approval of technical content and/or format.
Block 9: Is the distribution statement code which explains how the
Government can circulate the deliverable item. The definition
of codes A, B, C, D, E, F or X is as follows:
A. Distribution of the item is unrestricted.
B. Distribution of the item is limited to agencies only.
C. Distribution of the item is limited to contractors with
a cage code and have a DD Form 2345 on file with the
Defense Logistics Service Center (DLSC) Battle Creek,
Mich. or Government activities.
D. Distribution of the item is limited to DOD activities
and DOD contractors only.
E. Distribution of the item is limited to DOD components
only.
F. Distribution of the item is restricted from Foreign
Nations and Forign Nationals.
Block 10: Is the frequency which the deliverable item is expected to
be delivered to the Government. The abbreviations and
their meaning.
ANNLY Annually
ASGEN As generated
ASREQ As required
BI-MO Every two months
BI-WE Every two weeks
DAILY Daily
DFDEL Deferred Delivery
MTHLY Monthly
ONE/R One time with revisions
QRTLY Quarterly
SEMIA Every six months
WEKLY Weekly
XTIME Number of times to be submitted
(1time, 2times...9times)
Use of these codes requires further explanation in Block 16
to provide the contractor with guidance necessary to accurately
price the deliverable data item.
Other abbreviations not appearing on the above list may on
occasion be used in Block 10 of the DD Form 1423. When other
abbreviations are used they will be fully explained in Block 16
of the DD Form 1423.
Block 11: Is the last calendar date, expressed in year/month/day
format, the deliverable item is to be received by the
requiring office cited in Block 6 of the DD Form 1423
for an item with a Block 10 entry indication a single
delivery. If the item is to be submitted multiple
times, the number stated is the number of calendar days
after the frequency cited in Block 10 the item is to be
received by the requiring office cited in Block 6 of the
DD Form 1423. On occasion the deliverable item will be
required to be submitted prior to the end of the frequency
cited in Block 6. In that event the requirement will be
fully explained in Block 16 of the DD Form 1423.
Block 12: Is the date of first submission of the deliverable item to
the requiring office (Block 4) expressed in
year/month/day format. The abbreviations and their
meaning are as follows:
ASGEN As generated
ASREQ As required
DAC Days after contract date
DFDEL Deferred Delivery
EOC End of contract
EOM End of month
EOQ End of quarter
Specific instructions for these requirements will be provided in
Block 16. If the deliverable item is constrained by a specific
event or milestone the constraint will be fully explained in Block 16
of the DD Form 1423. "As generated", "As required", and "Deferred
Delivery" will always be fully explained in Block 16.
Block 13: Is the date of subsequent submission of the deliverable item, after
the initial submission. Subsequent submission is only used to
indicate the specific time period. The data is required when
Block 10 of the DD Form 1423 indicates multiple delivery is
required. This does not apply to resubmission of a deliverable
item that has been reviewed by the requiring office and determined
to be only conditionally acceptable or unacceptable.
Block 14a: Will contain the activity name(s) where the deliverable item is to
be sent. If the activity is other than DCMC or NSPCC the full
name, address (including code) will be specified. That specific
information will be located in Block 16 of the DD Form 1423.
Block 14b: Is the number of copies of draft and or final copies to
be submitted. When final "Repro" copies ar to be submitted
Block 16 will clarify the type of Repro copies required.
(e.g., vellum, negative, etc.)
Block 15: Is the total of each type of copies to be submitted as required
by Block 14.
Block 16: Is the block used to provide additional or clarifying information
Blocks 1 through 15. This block is also the only area used to
tailor the document listed in Block 4. Only deletions to the
minimum requirements stated in the document in Block 4 are
allowed. Block 16 may also be used to specify the medium for
delivery of the data.
Block 17: Is the block where the bidder or offerer is to enter the
appropriate price group. The price group are defines as follows:
A. Group I - Data which the contractor prepares to satisfy the Government's requirements. The contractor does not need this
type of data to perform the rest of the contract. Price
would be based on identifiable direct costs, overhead, General
and Administrative (G&A) and profit.
B. Group II - Data essential to contract performance which must be
reworked or amended to conform to Government requirements.
The price for data in this group would be based on the direct
cost to convert the original data to meet Government needs and
to deliver it, plus allocable overhead, G&A and profit.
C. Group III - Data which the contractor must develop for his own
use and which requires no substantial change to conform to
Government requirements regarding depth of content, format,
frequency of submittal, preparation, and quality of data. Only
the costs of reproducing, handling and delivery, plus overhead,
G&A and profit, are considered inpricing data in this group.
D. Group IV - Data which the contractor has developed as part
of his commercial business. Not much of this data is required
and the cost is insignificant. The item should normally
becoded "no charge." An example is a brochure or brief manual
developed for commercial application which will be acquired
in small quantities, and the added cost is too small to justify
the expense of computing the charge that otherwise would go
with the acquisition.
Block 18: Enter the total estimated price equal to that portion of the total
price which is estimated to be attributable to the production
or development for the government of that ITEM OF DATA. THE
ENTRY "N/C" FOR "NO CHARGE" is acceptable.
6.6 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information
contained on those documents and drawings.
There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:
A... approved for public release; distribution is unlimited.
B... distribution authorized to US Governments agencies only.
C... distribution authorized to US Government agencies and their contractors.
D... distribution authorized to DoD and DoD contractors only.
E... distribution authorized to DoD Components only.
F... further distribution only as directed by Commander, Naval Sea
Systems Command, code 09T.
X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical
data in accordance with OPNAVINST 5510.161.
6.7 NOTE TO GOVERNMENT TESTING FACILITY - Upon completion of the Government tests cited under Section 4, Quality Assurance, a letter stating approval/disapproval of the testing performed shall be mailed within 5 days to the Naval Inventory Control Point,
Attention: Procurement Contracting Officer, identified in this contract/purchase order, 5450 Carlisle Pike, P.O. Box 2020, Mechanicsburg, Pa. 17055-0788.
6.8 ;Production Lot Test/Quality Conformance Inspection - Samples submitted to the Govertment Testing Facility for Test/Inspection that are consumed or destroyed in testing will not be returned to the Contractor.;
6.9 ;ISEA POC:Commander, Naval Surface Warfare Center; 5001 Broad Street Philadelphia, PA 19112 ; Attn: Lisa Weiser, 215-897-1612, Code 617;
6.10 ;"250.009 CUI REQUEST FOR NAVAL SEA SYSTEMS COMMAND CONSIDERATION FOR REDUCTION IN RECEIPT INSPECTION REQUIREMENTS FOR SUBMARINE SPECIAL HULL TREATMENT MATERIAL" & "9690 ltr ser 05u7_039 - SHT reciept inspection reduction Distro (004).pdf are available
upon request. Documents cover noise reduction and whether or not PLT can be waived in lieu of a COC/COA.;
P/N: 5808277 Tile, Type AA-18
Attachments/Links
Contact Information
Contracting Office Address
-
P O BOX 2020 5450 CARLISLE PIKE
-
MECHANICSBURG , PA 17050-0788
-
USA
Secondary Point of Contact
History
-
Mar 25, 2026 05:52 am EDTSolicitation (Original)