| Location: | California |
|---|---|
| Posted: | Jan 28, 2025 |
| Due: | Feb 5, 2025 |
| Agency: | City of Thousand Oaks |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CI 5427 HCTP Stormwater Diversion Project
Addenda: 3
Release Date: 12/6/2024
Due Date: 2/5/2025
The work to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, labor, supplies, and manufactured articles for the Project, as shown on Drawing Number 20-22A Sheets 1-14, Specifications, and Contract Documents. The general items of work include installation of a 30-inch diameter reinforced concrete storm drainage pipe, construction of a retaining wall and open channel and associated outlet structure, installation of an above grade 30-inch diameter pipeline, modification/abandonment of an existing storm drainage pump station, environmental compliance and modification to an existing 30-inch diameter storm drain pipeline.

With GovernmentContracts, you can:
...the District's potable water system for reducing high inlet pressure to a lower ...
Las Virgenes Municipal Water District
Bid Due: 6/05/2026