| Location: | Texas |
|---|---|
| Posted: | Dec 10, 2024 |
| Due: | Dec 23, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA301625Q0017 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Please Review all attachments:
The contractor shall provide all personnel, equipment, supplies, tools, materials, and all non-personal services necessary for purchase and to install one industrial ceiling fan in support of the 344th Training Squadron (TRS), at Lackland bldg. 10904 as defined in this Statement of Work (SOW) Offerors shall inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.
SPECIFIC REQUIREMENTS:
1.3.1. The industrial ceiling fan shall be mounted to structural beams and shall have safety cables.
1.3.2. The contractor shall hang the industrial ceiling fan with mount from the manufacturer and installed in accordance with manufacturer specifications.
1.3.3. The contractors shall make electrical connections from the industrial ceiling fan to the power panel.
1.3.4. Structural Grade 8.8 bolts shall be used for mounting.
1.3.5. Wiring shall be in electrical conduit (no exposed wires.)
1.3.6. The contractor shall insure that all possible deflection, vibration, torque, and other such detrimental forces are considered, controlled, and eliminated as necessary.
1.3.7. The contractor shall provide and install all metal conduit, fittings, boxes wire, and switches necessary to establish full and necessary electrical circuits and ensure a perfectly working and code compliant ceiling fan system.
1.3.8. Industrial ceiling fan shall have a minimum drop from support beam of 12”.
1.3.9. Contractor shall install the Fan (bldg. 10904) on main structural ceiling beam 35’ 8” from South wall and 75’ from the East wall. Fan shall be centered between vertical beams.
1.3.10. Contractor shall install a ceiling fan control box 44’ from the east wall next to the current light switch at the south entrance/exit door.
| Dec 20, 2024 | [Solicitation (Updated)] Warehouse Fan Bldg. 10904 |
| Jan 7, 2025 | [Solicitation (Updated)] Warehouse Fan Bldg. 10904 |
| Jan 8, 2025 | [Solicitation (Updated)] Warehouse Fan Bldg. 10904 |

With GovernmentContracts, you can:
Follow North Texas Hospital Patient Porters Active Contract Opportunity Notice ID 36C25726Q0551 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/15/2026
Follow Retamal Dam Building and Generator Active Contract Opportunity Notice ID 191BWC26R0005 Related
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/21/2026
Solicitation Details eResponse Instructions Subscribe Print PDF Type: Invitation For Bids (IFB) Status:
City of Austin
Bid Due: 6/30/2026
Bid Information Type Request for Proposal Status Issued Number 9061 (Fence Installation and
City of Denton
Bid Due: 7/01/2026