CHARLOTTE M. MOSES, MAYOR
HAROLD L. DOUCET, SR.,
MAYOR PRO TEM
COUNCIL MEMBERS:
WILLIE BAE LEWIS, JR.
TIFFANY L. HAMILTON EVERFIELD
DONEANE BECKCOM
THOMAS KINLAW, III
DONALD FRANK, SR.
RONALD BURTON, CPM
CITY MANAGER
SHERRI BELLARD, TRMC
CITY SECRETARY
ROXANN PAIS COTRONEO
CITY ATTORNEY
January 12, 2026
REQUEST FOR PROPOSAL
WATER/SEWER LEAK REPAIRS FOR UTILITY OPERATIONS
DEADLINE: Sealed proposal submittals must be received and time stamped by 3:00p.m., Central
Standard Time, Wednesday, January 14, 2026 (The clock located in the City Secretary’s office
will be the official time.) All proposals received will be read aloud at 3:15 p.m. on Wednesday,
January 14, 2026 in the City Council Chambers, City Hall, 5th Floor, Port Arthur, TX. Proposals
will be opened in a manner to avoid public disclosure of contents; however, only the names of
proposers will be read aloud.
MARK ENVELOPE: P26-010
DELIVERY ADDRESS: Please submit one (1) original and three (3) exact duplicate copies and
USB of your RFP to:
CITY OF PORT ARTHUR
CITY SECRETARY
or
P.O. BOX 1089
PORT ARTHUR, TEXAS 77641
CITY OF PORT ARTHUR
CITY SECRETARY
444 4TH STREET, 4th Floor
PORT ARTHUR, TEXAS 77640
POINTS OF CONTACT:
Questions concerning the Request for Proposal should be directed in writing to:
City of Port Arthur, TX
Clifton Williams, Purchasing Manager
P.O. Box 1089
Port Arthur, TX 77641
clifton.williams@portarthurtx.gov
Purchasing Division/Finance Department | Purchasing Manager, Clifton Williams
P.O. Box 1089|444 4th Street| Port Arthur, Texas 77641| 409.983.8160 |Fax 409.983.8291
The enclosed REQUEST FOR PROPOSAL (RFP) and accompanying General Instructions are for
your convenience in submitting proposals for the enclosed referenced services for the City of Port
Arthur.
Proposals must be signed by a person having authority to bind the firm in a contract. Proposals shall
be placed in a sealed envelope, with the Vendor’s name and address in the upper left-hand corner
of the envelope.
ALL PROPOSALS MUST BE RECEIVED IN THE CITY SECRETARY’S OFFICE BEFORE
OPENING DATE AND TIME. It is the sole responsibility of the firm to ensure that the sealed RFP
submittal arrives at the above location by specified deadline regardless of delivery method chosen
by the firm. Faxed or electronically transmitted RFP submittals will not be accepted.
Clifton Williams
Purchasing Manager
Page 2 of 24
REQUESTS FOR PROPOSALS
WATER/SEWER LEAK REPAIRS FOR UTILITY OPERATIONS
(To be Completed ONLY IF YOU DO NOT BID.)
FAILURE TO RESPOND TO BID SOLICITATIONS FOR TWO (2) BID PERIODS MAY
RESULT IN REMOVAL FROM THE VENDOR’S LIST. However, if you are removed you will
be reinstated upon request.
In the event you desire not to submit a bid, we would appreciate your response regarding the
reason(s). Your assistance in completing and returning this form in an envelope marked with
the enclosed bid would be appreciated.
NO BID is submitted: ____ this time only
____ not this commodity/service only
Yes
No
Does your company provide this product or services?
Were the specifications clear?
Were the specifications too restrictive?
Does the City pay its bills on time?
Do you desire to remain on the bid list for this product or service?
Does your present work load permit additional work?
Comments/Other Suggestions:
Company Name:
Person Completing Form:
Mailing Address:
City, State, Zip Code:
Telephone:
Email:
Date:
Page 3 of 24
REQUEST FOR PROPOSALS
WATER/SEWER LEAK REPAIRS FOR UTILITY OPERATIONS
SCOPE OF WORK
The City of Port Arthur Water Utilities Department maintains about 800 miles of water main and
450 sewer lines ranging from 48” to 2” and needs over 10,000 tap services annually.
The City of Port Arthur is seeking a qualified contractor that provides on-demand responses to the
Request for Proposals (RFP) to furnish all labor/equipment to repair water/sewer leaks or install
water/sewer taps, pipes, manholes, and appurtenances for the City of Port Arthur Water Utility
department. This service consists of repair, maintenance, installation, and refurbishment of various
taps, pipes, valves, and manholes, within the City of Port Arthur operated by the Water Utilities
Department.
All materials for the repair (clamps, fittings, couplings, pipe, manhole, valve, etc.) will be made
available at the Service Center Warehouse, located at 111 H.O. Mills Blvd, Port Arthur, Texas.
The City is responsible for ordering and maintaining repair materials. The Contractor’s Supervisor
will be responsible for communicating the material needs of each job to the Utility Operation
Manager or designee before obtaining the items from the Warehouse. Items will be signed out and
accounted for by Warehouse Personnel, with the approval of the Utility Operation Manager or the
designee.
1. The work will be unscheduled, intermittent, and on an “as needed” basis. The contractor will be
expected to have personnel and equipment available for repairs when required.
2. Contractor shall maintain an emergency “on-call” number, or answering service to answer all
calls placed after normal working hours seven (7) days per week and during holidays. A response
for emergency repair will be within 2-hours.
3. Utility locates will be coordinated by the Contractor.
4. The Contractor is expected to perform all work competently and professionally. Any damage to
a City building or facility, either direct or indirect, resulting from the Contractor or his employees,
must be repaired fully and completely at the Contractor’s cost, including work, materials, and any
litigation fees that may be incurred to recover the cost of such damages not repaired in a
workmanlike manner.
5. The City will issue a work order and scope of work for each job. Each job shall be billed
separately including required replacement material invoices. Each invoice shall have detailed
hours worked and equipment used, which shall bear the City’s contract number and related work
order/Purchase Order (PO) number. No invoice will be paid without an authorized Work
Order/PO and Contract numbers identified on the invoice.
6. The contractor shall provide a written estimate of job cost and construction time prior to the
commencement of work.
Page 4 of 24
7. After the PO is issued to the contractor, the project should start within a week.
8. During the progress of the work, if it becomes evident that the actual cost of the job will exceed
the estimate by ten percent (10%) or more, the vendor shall immediately notify the originator of
the work, making them aware of the situation and request further instructions.
9. All travel costs are to be included in the hourly rate.
10. The City of Port Arthur or its authorized agent shall have the right to inspect the work at all
times and upon completion thereof. The Contractor may not assign all or part of this contract
without prior consent in writing by the City. An Insurance Certificate must also be provided prior
to the performance of work by any Subcontractor showing coverage either under the Contractor’s
policies or as separate policies held by the Subcontractor. The City, through its authorized agents,
shall have the right to refuse payment for work not performed to specifications if such work was
represented by the Contractor as completed and within compliance.
11. The contractor will only perform the work when called by an authorized City representative.
12. The City reserves the right to utilize any Contractor to repair any system component or
equipment and is not limited in any way to the sole use of this contract for repairs.
13. No minimum or maximum quantities of work are guaranteed.
Page 5 of 24
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.