| Location: | California |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Jul 28, 2026 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 944674.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | SOD A0-121 Clinic Remodel (opens in new tab, PDF) |
| Project Number | 944674.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work:
The Department of Orthodontics at the School of Dentistry (SOD) proposes to renovate and reconfigure Offices A0-121, A0-121A, A0-121B, and A2-122; Storage Rooms A0-117B and A2-122A; Restrooms A0-119A, A0-119B, and A0-119C; Vestibule A2-130; Atrium A0-119UE; Corridor A0-119 and a portion of Corridor A0-115, all located on Level A of the SOD building, to meet current operational needs. The renovation area, totaling approximately 2,505 gsf (1,223 asf), would accommodate a new dental clinic, including a reception area, open clinic space, calming and quiet treatment rooms, a sterilization room, storage, and a mechanical support room for dental equipment. A new all-gender restroom would also be provided. The SOD is a 210,189 gsf (122,243 asf) eight-story building, plus two basement levels, constructed in 1966. The project scope includes the interior demolition of existing partitions, ceilings, and floorings; installation of new partitions, ceilings, and flooring; new interior finishes; installation and anchorage of equipment; upgrades and modifications to the exterior atrium landscaping; and upgrades and modifications to the mechanical, electrical, plumbing, lighting, fire sprinkler, and fire alarm systems to support the new program. New dental equipment will be furnished by the University and installed by the dental manufacturer's installer. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $2,394,420.00 |

With GovernmentContracts, you can:
...Solicitor Posting Type 07/23/2026 10285386 Construction Inspection Servic... Construction Management...
City of Glendora
Bid Due: 8/20/2026
...Follow 127EAW26Q0050 - Ash Creek Helispot Construction Active Contract Opportunity Notice ID...) Product ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/13/2026
...Follow 127EAW26Q0050 - Ash Creek Helispot Construction Active Contract Opportunity Notice ID... Aside: ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/13/2026
...Follow 127EAW26Q0050 - Ash Creek Helispot Construction Active Contract Opportunity Notice ID... Aside: ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/13/2026