| Location: | Federal |
|---|---|
| Posted: | Jul 9, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FMP-NNL-0047 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS A REQUEST FOR INFORMATION ONLY. THIS IS NOT A SOLICITATION.
This notice is issued solely for informational and planning purposes. This notice does not constitute a solicitation. The Naval Nuclear Laboratory (NNL), operated by Fluor Marine Propulsion (FMP), is utilizing this request for information for market research to determine what organizations have the capability to fulfill this requirement. NNL will not be responsible for any costs incurred by interested parties in responding to this request for information.
Responses shall not exceed five (5) pages in length.
Scope:
When performing maintenance on a pure water fluid system, valves are commonly used for work area isolation. Valves that have been in-service can leak past their seats. In this case, the worker may still be protected from hazardous energy on the other side of the valve but work such as welding might not be possible if water is being continually introduced to the work area. In this case, more valves can be used if available in the system design, but if not, freeze seals are commonly used to eliminate leakage. Freeze seals can consume significant work and resources to set, so alternate means to mitigate water leakage past valves is desired.
A method to mitigate valve leak-by for the hours or days a system is open for maintenance or the time to perform a weld is desired which will not affect pure water chemistry or stainless-steel corrosion or cracking performance. The method must not introduce devices or materials that require removal from the system after repair is completed. Solutions must either be external to the system, completely dissolve into known and consistent constituents at room temperature, or otherwise non-intrusive.

With GovernmentContracts, you can:
...Follow 17--JACK,AIRCRAFT LANDI Active Contract Opportunity Notice ID N0038326RPA69 Related Notice... SUPPORT Looking ...
Federal Agency
Bid Due: 10/30/2026
...Follow ELECTRODE,WELDING Active Contract Opportunity Notice ID N0010425QFA38 Related Notice... MECH Looking for ...
DEPT OF DEFENSE
Bid Due: 10/06/2026
...Follow 59--TRANSFORMER,POWER Active Contract Opportunity Notice ID SPE7M126U6668 Related Notice... Sub Command DLA ...
DEPT OF DEFENSE
Bid Due: 10/06/2026
...Follow BRAZING ALLOY,SILVE Active Contract Opportunity Notice ID N0010426QFF23 Related Notice... MECH Looking ...
DEPT OF DEFENSE
Bid Due: 9/25/2026