| Location: | Missouri |
|---|---|
| Posted: | Jan 14, 2026 |
| Due: | Jan 21, 2026 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C25526Q0154 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
2. SPECIFICATIONS
. Minimum of three low temperature sterilizers shall have a minimum individual dimensions of
Cabinet (DD): 33 x 40-15/16 x 72” (838 x 1040 x 1829 mm) with Recessed/Cabinet (SD): 33 x 38-
5/16 x 72” (838 x 973 x 1829 mm).
o Mounting single door, cabinet
o System installation requires no plumbing, ventilation or air
o supply – only a dedicated electrical connection is needed. A power cord is supplied for
this connection
o The facility space in which the vehicle can occupy is approx. 35’ x 110’.
. Vaporized hydrogen peroxide sterilization processes are particularly suited for sterilizing heatsensitive
materials because temperatures within the load currently do not exceed 55ºC (131ºF)
and sterilization occurs in a low-moisture environment. Heat tolerant devices and materials can
also be indicated for vaporized hydrogen peroxide sterilization processes. FDA-cleared vaporized
hydrogen peroxide sterilizers, either with or without plasma, are currently available in the
United States.
. Per ANSI/AAMI ST58:2013 or subsequent, the sterilizer shall be installed and operated in an area
with a ventilation system capable of at least 10 air exchanges per hour.
. VPRO MaX2 must support utility requirements:
o Current 16 AMP
o Minimum Circuit Breaker 20 AMPS
o Use NEMA L15-20R Plug
o Provide grouped or ganged circuit protection and disconnect for phase 3 power as
required by NEC and local codes.
o Individual power shutoffs near each machine for servicing.

With GovernmentContracts, you can: