VGLZ199555 Repair Fire Station Foundation Bldg. 859
| Location: |
Federal |
| Posted: |
Apr 15, 2025 |
| Due: |
Jun 24, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
W50S8525BA006 |
| Publication URL: |
To access bid details, please log in. |
VGLZ199555 Repair Fire Station Foundation Bldg. 859
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
NATIONAL GUARD BUREAU
Office
W7NF USPFO ACTIVITY MIANG 127
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Presolicitation (Updated)
-
Updated Published Date: Apr 15, 2025 01:59 pm EDT
-
Original Published Date: Apr 15, 2025 01:42 pm EDT
-
Updated Response Date: Jun 24, 2025 12:00 pm EDT
-
Original Response Date: Jun 24, 2025 12:00 pm EDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Apr 15, 2026
-
Original Inactive Date:
Apr 15, 2026
-
Initiative:
Classification View Changes
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
-
Product Service Code: Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
-
236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Description
The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in non-load-bearing walls at their junctions with load-bearing masonry walls; out of alignment and cracking of restroom area tiles; and miscellaneous cracking of drywall partitions. The scope of this project is the repair of the existing system architectural, plumbing, and structural systems and replacement of permanently damaged materials. The south portion of the building, which contains the firefighting apparatus, has not been compromised and will not be included in any repair designs. Finishes will match existing/original finish and material selections in the affected areas, and design or selection of a new color/material palette is not part of the scope.
Attachments/Links
Contact Information
Contracting Office Address
-
KO FOR MIANG DO NOT DELETE 43200 MAPLE ST BLDG 105
-
SELFRIDGE ANGB , MI 48045-5213
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
..., or will it need to be opened through drywall? VA Response: The ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/19/2026
...existing circuitry. The drywall areas adjacent are to be repainted as noted in ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/09/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.