26118 - RFP - 2027 Water Main Construction Engineering

Location: Illinois
Posted: Oct 15, 2026
Due: Nov 4, 2026
Agency: Wilmette village
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 26118
Publication URL: To access bid details, please log in.
Bid Number: 26118
Bid Title: 26118 - RFP - 2027 Water Main Construction Engineering
Category: Engineering and Public Works
Status: Open
Publication Date/Time:
10/15/2026 2:30 PM
Publication Information:
www.demandstar.com
Closing Date/Time:
11/4/2026 2:00 PM
Submittal Information:
www.demandstar.com
Bid Opening Information:
www.demandstar.com
Related Documents:

Attachment Preview

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
VILLAGE OF WILMETTE
______________________
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge
Construction", adopted January 1, 2022, the "Standard Specifications for Water and Sewer
Construction in Illinois," latest edition (hereinafter referred to as the Water Main Standard
N
Specifications), the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and
Highways", the "Manual of Test Procedures of Materials" in effect on the date of invitation of bids, and
O
the "Supplemental Specifications and Recurring Special Provisions" indicated on the Check Sheet
included herein which apply to and govern construction of the 2027 Water Main Replacement
I
Program, and in case of conflict with any part or parts of said specifications; the saTid Special Provisions
shall take precedence and shall govern.
C
2027 Water Main Replacement Program
U
Village of Wilm ette
RFB No. TXXXXX
R
F
LOCATION OF PROJECT
T
A
This project consists of water main replacement and pavSement patching along Lake Avenue between
Hibbard Road and Illinois Road and wRater main replacement and pavement resurfacing along Locust
Road between the south end of the Village of WilmNette and Wilmette Avenue, Cook County, Illinois.
D
The total length of the project is 5,520 feet (1.05 miles).
O
DESCRIPTION OF PROJECT
C
The proposed work includes installation of ductile iron water main and valves, installation of new fire
hydrants and appurtenances, replacement of existing water services between the new water main and
R
new curb stop, replacement of existing water service lines containing lead or galvanized material from
the new curb stop to the existing water meter, replacement of affected storm and/or sanitary sewers,
O
HMA pavement resurfacing with select curb & gutter, driveway, and sidewalk removal and
replacements including ADA upgrades, restoration, and all incidental and collateral work necessary to
F
complete the project as shown in the plans and as described herein.
PROJECT TIMINGT
O
Construction is scheduled to begin upon the proper execution of the contract documents, which
includes the submission of insurance and bonds, but no earlier than March 1, 2027. All work
N
associated with the 2027 Water Main Replacement Program must be substantially completed on or
before August 13, 2027. This shall include all interim restoration and other ancillary work except sod
placement, punch list items, and any extra work. Sod placement and punch list items shall be
completed by the final completion date of September 24, 2027.
SUBCONTRACTOR APPROVALS
The Contractor shall provide a list of all Subcontractors within the bid package submittal for Village
approval.
SP-1
Page 3
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
All Subcontractors performing paving, concrete, and underground utility work shall be IDOT
Prequalified in the appropriate work category, and their IDOT issued Certificate of Eligibility included
in the bid package submittal. All other Subcontractors must be IDOT Prequalified or Registered
Subcontractor.
The Village reserves the right to reject any Subcontractor based on past performance issues if, in the
judgement of the Village, the best interests of the Village are promoted thereby.
N
The apparent low bidder must submit a Request for Approval of Subcontractor and Affidavit of
O
Availability for major Subcontractor within 24 hours of the bid opening.
I
GEOGRAPHICAL INFORMATION T
C
All digital geographical information used in the performance of the contract is the property of the
Village, including all information obtained, collected, corrected, or created by the Contractor in their
U
completion or pursuit of the contract.
T
R
PRE-CONSTRUCTION MEETING
F
T
The Contractor is required to attend a pre-Aconstruction meeting with representatives from the Village
and other entities prior to the start of work. The ContracStor shall submit a tentative schedule of work,
R
contact list for contractor/subcontractors, and list of material sources to the Village at least five (5)
N
working days prior to the scheduled pre-construction meeting for review and approval.
D
O
CONSTRUCTION NOISE RESTRICTIONS
C
Add the following to Article 107.35 of the Standard Specifications:
"All Work shall be performed betwReen the hours of 7:00 AM and 7:00 PM, Monday through Friday,
and between 9:00 AM and 6:00 PM on Saturday, except in the case of urgent necessity as determined
by the Director of EngineeriOng and Public Works. The Contractor shall notify the Village at least 48
hours in advance of Saturday work. All work on Saturdays must be pre-approved by the Village. No
work shall be performed on Sundays or legal holidays."
F
T
O
N
SP-2
Page 4
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
AVAILABILITY OF REPORTS
(cid:31) No project specific reports were prepared.
When applicable, the following checked reports and record information is available for
Bidders' reference upon request:
(cid:31) Record Structural Plans N
(cid:31) Preliminary Site Investigation (PSI)
(cid:31) Preliminary Environmental Site Assessment (PESA) O
X Soils / Geotechnical Report
X Boring Logs I
X Pavement Cores T
(cid:31) Location Drainage Study (LDS)
C
(cid:31) Hydraulic Report
(cid:31) Noise Analysis
U
(cid:31) Other:
T
R
Reports are available for download at https://www.wilmette.gov/bids.aspx OR
F
www.demandstar.com.
T
A
TYPICAL CONSTRUCTION SEQUENCE S
R
N
Below is the anticipated sequence of work. Work must be completed within the specified completion
D
dates:
O
1. Conduct pre-construction video documentation.
2. Conduct tree root and canopy pruning as directed by the Village.
C
3. Place all traffic control devices, inlet filters, and tree protection necessary for the work and
as directed by the Village.
4. Complete water main installation and testing, water service replacements, utility point
R
repairs, and structure replacements.
5. Construct concrete work (including the removal and replacement of curb & gutter,
O
sidewalk, and concrete driveway aprons, front-filling, and backfilling) within ten (10)
working days from the start of removal, or five (5) working days per each side of the
F
street. Concrete work shall occur on only one side of the street at a time, unless
otherwise d irected by the Village. The Contractor must start concrete work on the fire
hydrantT side of the street first. The Contractor shall remove the forms at least one (1) day
after pouring new concrete. The Contractor shall backfill the edges of new concrete prior
O
to returning access to a sidewalk or driveway. The Contractor shall front-fill the edges
adjacent to pavement with concrete prior to milling the pavement or allowing street
N
parking. All disturbed driveways must have access restored within five (5) working days
from removal.
6. Remove structure frames in the pavement (except Water structures) and grind the existing
pavement surface. Full width pavement grinding shall not begin until all water main
and utility improvements are complete.
7. Proof-roll the street and construct any pavement patches and/or aggregate base/subgrade
repairs to resolve pavement section defects.
8. Pave the HMA binder course within five (5) calendar days after removing the existing
pavement surface.
SP-3
Page 5
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
9. Construct all HMA and Brick driveway replacements and repair any remaining or damaged
concrete sections.
10. Return and set structure frames in the pavement area to final grade.
11. Remove tree protection materials and restore disturbed parkways with topsoil and seed or
sod, as directed by the Village.
12. Pave the HMA surface course within ten (10) working days of the HMA binder course
installation.
13. Conduct pavement markings and work site clean-up within five (5) working days from
N
paving the HMA surface course.
14. Address any punch list items and sod restoration as directed by the Village.
O
JOB SITE DAILY CLEANUP
I
T
The Contractor shall maintain a clean work area daily. All materials not needed for the construction
C
process shall be removed from the job site at the end of each day. This includes, but is not limited to,
old vaults, piping, old cables, removed pavement, wood scrapes, old curb & gutter, paint cans, litter,
U
broken tree branches, etc. The Contractor shall maintai n clean water, sewer, and drainage structures
T
throughout the work. Failure to maintain a clean work area at the end of each day and to the
R
satisfaction of the Village will result in a penalty of $500.00 per incident.
F
T
This provision includes all work covered unAder the "Maintenance of Roadways" special provision.
S
DIRT ON PAVEMENT OR STRUCTURRES
N
D
Add the following to Article 107.15 of the Standard Specifications:
O
"Excess spoils and construction debris shall be removed by the end of each day. All slurry that results
C
from saw cutting work shall be immediately washed away, using water, to prevent tracking by vehicles
or pedestrians to the satisfaction of the Village. The Village may require the Contractor, at no additional
expense, to utilize a mechanical street sweeper and/or a watering truck to clean the pavement
R
surfaces affected by Contractor's operations and limit dust emitted into the air by vehicular traffic. The
street sweeper shall be a full-sized municipal-type sweeper having dust collection and street washing
O
capabilities."
F
EQUIPMENT AND MATERIAL STAGING
T
Add the following to Article 107.16 of the Standard Specifications:
O
"The Contractor shall not place any equipment or materials on the job site without prior approval from
the Village. All staging locations for equipment and materials must be pre-approved by the Village."
N
CONCRETE WASHOUT FACILITY
Description. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes,
reservoirs, and wetlands with fuels, oils, bitumen, calcium chloride, or other harmful materials
according to Article 107.23 of the Standard Specifications and as noted herein.
Construction Requirements. To prevent pollution by residual concrete and/or the by-product of
washing out the concrete trucks, concrete washout facilities shall be constructed and maintained at
SP-4
Page 6
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
any location which includes cast-in-place concrete items. The concrete washout shall be constructed,
maintained, and removed according to this Special Provision.
The concrete washout facility shall be constructed on the job site in accordance with Illinois Urban
Manual practice standard for Temporary Concrete Washout Facility (Code 954). The Contractor may
elect to use a prefabricated portable concrete washout structure. The Contractor shall submit a plan
for the concrete washout facility to the Village for approval a minimum of three (3) working days before
the first concrete pour.
N
The working concrete washout facility shall be in place before any delivery of concrete to the site. The
Contractor shall ensure that all concrete washout activities are limited to the designated area.
O
The concrete washout facility shall be located no closer than 50 feet from any environmentally
I
sensitive areas, such as water bodies, wetlands, and/or other areas indicated onT the plans. Adequate
signage shall be placed at the washout facility and elsewhere as necessary to clearly indicate the
C
location of the concrete washout facility to the operators of concrete trucks.
U
The concrete washout facility shall be adequately sized to fully contain the concrete washout needs
of the project. The contents of the concrete wasThout facility shall not exceed 75% of the facility
R
capacity. Once the 75% capacity is reached, concrete placement shall be discontinued until the facility
F
is cleaned out. Hardened concrete shall be removed and properly disposed of outside the Right-of-
T
Way. Slurry shall be allowed to evaporateA or shall be removed and properly disposed of outside the
Right-of-Way. S
R
The Contractor shall immediately replace damagedN basin liners or other washout facility components
to prevent leakage of concrete Dwaste from the washout facility. Concrete washout facilities shall be
inspected by the Contractor after each use. AOll spills shall be reported to the Village and cleaned up
immediately. The Contractor shall remove the concrete washout facility when it is no longer needed.
C
Method of Measurement and Basis of Payment. This work will not be paid for separately but shall be
included in the cost of concrete items.
R
FAILURE TO COMPLETE THE WORK ON TIME
O
Revise Article 108.09 of the Standard Specifications to read:
F
"Should the Contracto r fail to complete the work on or before the completion date as specified in the
Special ProvisionT, or within such extended time as may have been permitted by the Village, the
Contractor shall be liable to the Village in the amount of $2,000, not as a penalty but as liquidated
O
damages, for each work day or a portion thereof overrun in the contract time or such extended time
as may have been allowed.
N
In fixing the damages as set out herein, the desire is to establish a certain mode of calculation for the
work since the Village's actual loss, in the event of delay, cannot be predetermined, would be difficult
of ascertainment, and a matter of argument and unprofitable litigation. This said mode is an equitable
rule for measurement of the Village's actual loss and fairly considers the loss of use of the roadway if
the project is delayed in completion. The Village shall not be required to provide any actual loss to
recover these liquidated damages provided herein, as said damages are very difficult to ascertain.
Furthermore, no provision of this clause shall be construed as a penalty, as such is not the intention
of the parties.
SP-5
Page 7
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
A calendar day is every day shown on the calendar and starts at 12:00 midnight and ends at the
following 12:00 midnight, twenty-four (24) hours later."
AGGREGATE SURFACE COURSE FOR TEMPORARY ACCESS
Description. This work shall consist of furnishing, placing, and removing aggregate surface course for
temporary access at the locations identified on the plans and as directed by the Village. TNhis work
shall be in accordance with Section 402.10 of the Standard Specifications except as noted herein.
O
Construction Requirements. Revise Article 402.10 of the Standard Specifications to read:
I
"402.10 For Temporary Access. The contractor shall construct and Tmaintain aggregate
surface course for temporary access to private entrances, commercial entrances, and roads according
C
to Article 402.07 and as directed by the Village.
U
The aggregate surface course shall be constru cted to the dimensions and grades specified
T
below, except as modified by the plans or as directed by the Village.
R
(a) Private Entrance. The minimum width shall be 12 ft (3.6 m). The minimum thickness after
F
compaction shall be 6 in. (150 mm). The maximum grade shall be eight percent, except as
T
required to match the existing gArade.
(b) Commercial Entrance. The minimum width shSall be 24 ft (7.2 m). The minimum compacted
thickness shall be 9 in. (2R30 mm). The maximum grade shall be six percent, except as
required to match the existing grade. N
D
(c) Road. The minimum width shall be 24 ft (7.2 m). The minimum compacted thickness shall
O
be 9 in. (230 mm). The grade and elevation shall be the same as the removed pavement,
except as required to meet the grade of any new pavement constructed.
C
Maintaining the temporary access shall include relocating and/or regrading the aggregate
surface for any operation that may di sturb or remove the temporary access. The same type and
R
gradation of material used to construct the temporary access shall be used to maintain it.
O
When use of the temporary access is discontinued, the aggregate shall be removed and
utilized in the permanent construction or disposed of according to Article 202.03."
F
Method of Measureme nt and Basis of Payment. This work will not be paid for separately but shall be
included in the coTst of the concrete and driveway work items.
O
PARKING
N
Add the following to Article 701.18(j) (1) of the Standard Specifications:
"Where on-street parking exists within the work zone, the Contractor shall notify the Village and place
'No Parking' signs a minimum of two (2) calendar days prior to the start of construction operations.
The Village will furnish 'No Parking' signs at no cost to the Contractor. All 'No Parking' signs shall
indicate the start date of enforcement and must be affixed and displayed to the satisfaction of the
Village. The Contractor shall remove 'No Parking' signs and reopen on-street parking within three (3)
calendar days after the construction task is complete. The Contractor shall repost the signs as required
herein when work is scheduled to resume."
SP-6
Page 8
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
DRIVEWAY ACCESS
The Contractor must notify the Village at least one (1) working day in advance of any anticipated
driveway closures. The Village will notify the affected parties by distributing notices and/or posting
signs.
All driveways disturbed by construction must be repaired, or have access restored, withinN five (5)
working days from the date of removal. Failure to return access will result in a penalty of $100.00 per
calendar day for each disturbed driveway. O
PRECONSTRUCTION VIDEO INSPECTION OF ROADWAY I
T
Description: The Contractor shall prepare pre-construction audio-video documentation of all above-
C
ground physical features in the area affected by construction.
U
Construction Requirements: All video cameras, recorde rs, tapes, accessories, and related equipment
T
shall be of high resolution, color, and digital format. Each street shall be submitted to the Village
R
individually in MP4 format. Each video shall bFegin with the current date, project name, and Owner,
followed by descriptions of the general location, street names, addresses, and data that describes
T
location and subject of viewing. The pertinAent features within the construction zone of influence shall
be shown, including but not limited to, pavementsS, curbs, driveways, sidewalks, buildings,
R
landscaping, trees, shrubbery, fences, light posts, equipment, etc.
N
D
A rudimentary view orientation shall be included in the audio commentary of each video segment to
O
help clarify what is being viewed. The Contractor shall create the pre-construction audio-video
documentation and submit copies to the Village via USB flash drive prior to commencing any
C
construction activity.
Method of Measurement and Basis of Payment: This work will not be paid for separately but shall be
R
included in the cost of MOBILIZATION.
O
TEMPORARY TOILETS
F
The Contractor shall provide a temporary toilet facility for the use of all contractors' personnel
employed on the work site and shall maintain same in proper sanitary condition. At completion, the
T
facilities shall be removed and the premises left clean. The Village shall approve the location of the
temporary toilet. The cost of this work shall be included in the cost of the contract.
O
PROTECTION AND RESTORATION OF PROPERTY
N
The Contractor shall protect and restore property according to Article 107.20 of the Standard
Specifications and the following:
The Contractor shall adhere to limits of restoration shown, including concrete truck washout facilities.
Areas outside these limits that are damaged or disturbed by the Contractor, shall be restored by the
Contractor at his expense and no additional compensation will be allowed.
SP-7
Page 9
Village of Wilmette

Village of Wilmette
20R2F7P WNoa. 2te61r 1M8ain Replacement Program
RFB No. XXXXX
CLEARING AND REMOVALS
The Contractor shall pay special attention to article 201.01(a) of the Standard Specifications. Removal
of all obstructions in the right-of-way, which are not included in a specific removal item, shall be
considered clearing and will not be measured for payment. This shall include, but not limited to walls,
foundations, buildings, accumulations of rubbish of whatever nature, old barricades, old pipe, rubber
tires, concrete blocks, utility anchors, metal parts, abandoned wooden power poles, gates, and all
vegetation, trees, shrubs, etc. less than 6" in diameter. N
All items scheduled for removal will be examined by the Village to determine if the itemO is suitable for
salvage. Items designated for salvage shall be carefully removed and stored at the location and in the
manner designated by Village. Any material having salvage value which is damaged bIy the Contractor
shall be replaced by the Contractor, at his/her own expense, with new items oTf the same kind and
size. The cost of storing salvaged items shall be included in the cost of the contract.
C
DISPOSAL OF EXCAVATED MATERIAL
U
T
This work shall consist of meeting IEPA requirements for the disposal of excavated material including,
R
but not limited to, clean construction or demFolition debris (CCDD), uncontaminated soil, and/or
contaminated soil. Excavated materials must be removed from the site by the end of each day.
T
A
The Contractor will be responsible to provide CCDD Sand soil fill site operators with all testing
R
information and fees as required by the IEPA and fill site operators. The Village will provide the
N
Contractor IEPA LPC documentation prior to the start of construction. The Contractor should be
D
advised that, even with the submittal of properly executed LPC Form(s), the fill operators retain the
O
right to reject any or all loads from a particular construction site based on their own determination of
the suitability of material from that site.
C
Excavated material identified by the Village during the course of construction as not conforming to
CCDD requirements shall be sampled, analyzed, and screened for disposal site acceptance by the
R
Contractor in accordance with Section 669 of the Standard Specifications. This work will be paid for
according to Article 109.04. This section only applies to work within IDOT Right of Way along Glenview
O
Road. Any additional testing within all other project areas will not be paid for separately.
F
SAW CUTTING
T
Description. The Contractor shall cut existing curb, sidewalk, or pavement with a wet saw prior to the
start of curb, sidewalk, utility, pavement removal or patching work.
O
Construction Requirements. The wet concrete saw shall be equipped with a diamond blade of
N
sufficient size to saw pavements full-depth and be capable of accurately maintaining cutting depth. All
saw cuts shall be parallel or perpendicular to the curb & gutter, edge of sidewalk, or the edge of
pavement, with vertical straight, clean edges, to the satisfaction of the Village. It is Contractor's
responsibility to determine the thickness of the existing pavement and whether it contains
reinforcement. Any damage caused by the Contractor to infrastructure outside the limits of work shall
be repaired or replaced at the Contractor's expense.
Any slurry resulting from the saw cutting work shall be immediately washed away using water to
prevent staining and tracking by vehicles or pedestrians. Failure to clean the slurry to the satisfaction
SP-8
Page 10
Village of Wilmette

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Solicitation # 27-422DNR-REALT-B-54809 Bid Solicitation # 27-422DNR-REALT-B-54809 Organization Name DNR - Natural

State Government of Illinois

Bid Due: 11/24/2026

Bid Solicitation # 27-422DNR-REALT-B-54809 Bid Solicitation # 27-422DNR-REALT-B-54809 Organization Name DNR - Natural

State Government of Illinois

Bid Due: 11/24/2026

Follow Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON) Active Contract Opportunity Notice ID

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 11/18/2026

12/10/26 10:30am CST RR-26-2069 - Systemwide Pavement Repairs Illinois Tollway

Illinois Tollway

Bid Due: 12/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.