This Justification and Authorization Memorandum (J&A) is for replacement of transformers USS #1, #2, #3. The current transformers were commissioned over 30 years ago and are at risk of critical failure due to its age and increased usage. Due to increased mission activities, additional manpower was assigned to the building which has increased the usage of electricity. The NAVFAC team has replacement of these vulnerabilities planned by slowly phasing-out the outdated electrical components starting from Main Switch Gears (MSG). During a routine testing of the newly installed MSG #1 utilizing USS #1, an unexpected internal malfunction resulted the failure of USS #1. To mitigate, USS #2 and #3 is now operating at increased capacity in conjunction with MSG #2 and #3. Without the functioning of USS #1, MSG #1 can’t be tested for certification and cannot be put into operation. This failure has delayed replacement of MSG #2 which is a requirement of the Contract. Delay in the replacement of USS #1 will result in delay of contractor’s ability to fulfill schedule of current contract completion date.

With GovernmentContracts, you can:
...Follow T--NHOTIC AV SYSTEM REPLACEMENT Active Contract Opportunity Notice ID 140L4326Q0126 Related...: 238210 ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 11/13/2026
...Follow TENKILLER 15KV SWITCHGEAR AND STATION SERVICE REPLACEMENT Active Contract Opportunity... (FAR 19.5) ...
DEPT OF DEFENSE
Bid Due: 12/03/2026
.../replacement. The vessel haul-out facility is currently inoperable due to sedimentation and requires... ...
DEPT OF DEFENSE
Bid Due: 11/15/2026
...waterway areas. Dock structures are failing and require repair/replacement. The vessel haul-out facility... ...