CMU 2889 North Avenue Improvements

Location: Colorado
Posted: Oct 15, 2026
Due: Nov 5, 2026
Agency: Colorado Mesa University
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.

CMU 2889 North Avenue Improvements

Attachment Preview

I. NOTICES
1. For State Public Works C.R.S. 8-17-101 - Colorado labor shall be employed to
perform at least 80% of the work. Colorado labor means any person who is a resident
of the state of Colorado at the time of the Public Works project.
2. All respondents accept the conditions of this RFQ, including but not limited to, the
following:
a. All submittals shall become the property of the State of Colorado and will not
be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all submittals on the basis of being
unresponsive to this RFQ or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the
preparation of submittals and proposals nor in costs related to any element of
the selection and contract negotiation process.
e. Any restriction as to the use of submitted materials must be clearly indicated
as proprietary. The requested limitation or prohibition of use or release shall
be identified in writing on a cover sheet. Blanket claims of proprietary
submittals will not be honored. Fee proposals will be considered proprietary.
f. The respondent has reviewed Appendix B and by responding has agreed that
the terms and conditions of the sample Architect/Engineer/Consultant
Contract are expressly workable without reservation.
3. The respondent has reviewed Appendix B and by responding has agreed that the
terms and conditions of the sample Architect/Engineer/Consultant Contract are
expressly workable without reservation. Any exceptions to the contract must be
communicated formally in writing before the solicitation closes. Bearing in mind any
and all exceptions may be considered non-negotiable.
4. Per C.R.S. 24-92-117, a public construction project in the amount of five hundred
thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act
program requirements. The BCCO Act requires the Office of the State Architect to
establish a maximum acceptable global warming potential (GWP) limit for each
category of eligible materials, which include asphalt and asphalt mixtures, cement
and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel,
and wood structural elements. For any solicitation for a contract for the design of an
eligible project, a State Agency or institution shall require the designer who is
awarded the contract to include in project specifications when final construction
documents are released, a current Environmental Product Declaration (EPD) that
meets the maximum acceptable GWP limits for each eligible material specified for
the project. A contractor that is awarded a contract for an eligible project shall not
RFQ-AE R3
Rev 09/2025

install any eligible materials on the project until the contractor submits an EPD for
each eligible material procured for the project.
5. Preference shall be given to Colorado resident vendors and for Colorado labor, as
provided by law.
II. PROJECT OVERVIEW
Introduction
Colorado Mesa University proposes construction of safety and access improvements at the
intersection of North Avenue and 9th Street at the mid-point of the south boundary of
campus. The improvements may include a new intersection, installation of a signal at 9th
Street, removal of the signal at 10th Street, closure of existing access points, restriction of
intersections utilizing new medians, and associated pedestrian improvements.
The improvements will align with the Colorado Mesa University master plan and the City of
Grand Junction goals for the pedestrian corridor. The relocation of the intersection will
address numerous transportation safety deficiencies and be designed in accordance with
transportation engineering standards of both the Colorado Department of Transportation
(CDOT) and City of Grand Junction.
The Estimated Construction cost for this project is $2,429,016.
Design is projected to begin in December 2026 with final project completion anticipated prior to the
start of the fall semester which begins the first week of August, 2027. The final schedule for the
project will be developed with the AE and teams, in consultation with CMU, CDOT, and the City of
Grand Junction.
Background
The North Avenue Corridor was constructed decades ago and has numerous access points
and City Streets that are known safety hazards according to crash history and a recent
fatality at the intersection of 10th and North Avenue. As CMU develops, eliminating access
points and aligning new access points within CDOT, City of Grand Junction, and the standard
of care for current engineering standards provides a catalyst to improve the safety of the
transportation corridor. In addition, multi-modal access will be enhanced and connected to
the north end of the 9th Street pedestrian improvement project planned by the City of Grand
Junction. This new intersection will be the main south entrance to the future CMU campus
expansion and Formation District.
Considerations for the North Avenue Improvements design should include:
a. Intersection traffic operations analysis
b. Traffic signal progression analysis
c. Installation of a new north south intersection at 9th street.
d. Installation of a traffic signal at 9th street, considering possible relocation of lighting
infrastructure at 10th street.
e. Removal and possible relocation of the 10th street lighting infrastructure.
f. Design of new lighting infrastructure at 9th street.
g. Closure of Cannell Street.
RFQ-AE R3
Rev 09/2025

h. Access restriction design at north existing commercial properties.
i. Design of accompanying multi model facilities.
j. Concept design level drawings for permit submittal.
k. Coordination with Traffic Engineering Consultant currently conducting Traffic Impact
Study. Traffic Impact Study will be excluded from this scope of services.
l. Relocation of utilities.
m. Level B utilities, Level C utilities, and level D utilities location.
n. Possible subsurface utility engineering (SUE) if the design impacts trigger this Colorado
statutory requirement.
o. Site survey including topography, physical features, right-of-way locations and survey of
(m.)
p. Coordination with geotechnical engineer for subgrade conditions for possible light pole
foundations, geotechnical engineering excluded from this scope.
The preferred design excludes (n), however, this scope may be required and will be
determined during the concept planning phase.
Colorado Mesa University anticipates using a Design Bid Build (D/B/B) approach to project
delivery. The Architect/Engineer is expected to provide Basic Services as described in the
sample Architect / Engineer / Consultant Agreement unless otherwise noted. It is preferred
that selected firm provides all services in-house with the exception of (m.) and (o.).
The process to be used in the selection of the Architect/Engineer/Consultant is comprised of
two steps. In STEP I submittals will be screened and scored as described in detail in Section
X. STEP II is the Oral Interview as described in detail in Section XI. A Jury Panel of
individuals who will be involved in the project and/or understand the required services
associated with the project will evaluate responses to this request. Upon completion of the
evaluation of the Submittals, a limited number of firms will be invited to the oral
interviews.
III. MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all
minimum requirements to be considered for this project. Interested parties should be
prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings
contract or procurement.
2. The consultant must have been in the same business under the same name for the
last two (2) years.
3. Demonstrated design experience in projects of similar scope and complexity for at
least two (2) projects each in excess of $1,000,000 (hard costs), utilizing the
expertise present in their Colorado Office; and
4. The Acknowledgment and Attestation Form, Appendix C is a mandatory requirement
for a respondent to be considered responsive to this RFQ Prequalification Submittal.
RFQ-AE R3
Rev 09/2025

a. Qualifications made by a respondent in executing this form may render a
submittal non-responsive as determined by the State.
5. For a respondent to be considered responsive to this RFQ, the submittal of
qualifications must be posted on Bidnet/Rocky Mountain E-Purchasing System (RMEPS)
website, https://www.rockymountainbidsystem.com.
IV. NON MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR
To ensure sufficient information is available to firms preparing submittals, a non-mandatory
pre-submittal conference has been scheduled. The intent of this conference is to tour the
site and to have Colorado Mesa University staff able to discuss the project.
A non-mandatory Pre-Submission Meeting will be held at:
Building Address: University Center (1455 N. 12th Street, 81501)
Room: UC 222
Date/Time October 28 / 1:00 p.m. MDT
V. SCHEDULE
The following is a tentative schedule of events for the Submittal process and an outline of
the schedule for the balance of the project. All dates are subject to change and changes in
the schedule will be issued via addendum.
Request for Qualifications Issued October 15, 2026
Non-Mandatory Pre-Submittal Conference October 28, 2026 at 1pm
Request for Clarifications Due October 30,2026 at 1pm
Final Addendum Issued (anticipated) November 2, 2026
Submittals Due (Prequalification: Step I) November 5, 2026 by 1pm
Short List Announced November 6, 2026
Oral Interviews November 17, 2026
Selection Announced November 19, 2026
Negotiation of Contract November 20, 2026
Anticipated Design Start December 1, 2026
Anticipated Construction Start/Finish May 15, 2026 / August 1, 2027
The above schedule is tentative. Responding firms shall be notified of revisions in a timely
manner by postings on the Rocky Mountain E-Purchasing System (RMEPS) website,
https://www.rockymountainbidsystem.com. Respondents may elect to verify times and
dates by email, but no earlier than 36 hours before the scheduled date and time.
VI. QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this RFQ will be issued under numerically sequenced addenda on
Bidnet/Rocky Mountain E-Purchasing System (RMEPS),
https://www.rockymountainbidsystem.com.
Questions and requests for clarification regarding this project shall be submitted before the
deadline listed in the above schedule on Bidnet/Rocky Mountain E-Purchasing System
(RMEPS), https://www.rockymountainbidsystem.com..
Communication regarding the project during the procurement, outside of this submission
process or scheduled procurement milestones is not permitted.
RFQ-AE R3
Rev 09/2025

VII. POINT OF CONTACT/CLARIFICATION
Name: Breanne Meier, Director of Campus Procurement
Agency: Colorado Mesa University
Email Address: bmeier@coloradomesa.edu
Phone: 970-248-1417
VIII. SUBMITTALS OF QUALIFICATIONS
1. This RFQ document, it's appendices, and any written addenda issued prior to the
closing of the solicitation, and written clarifications shall serve as the only basis for
the submittal.
2. All submittals must comply with the following items, a through g. The State retains
the right to waive any minor irregularity, or requirement should it be judged to be in
the best interest of the State.
a. Qualifications shall be formatted and tabbed in the exact form and numeric
sequence of the Evaluation Form (1 through 6) in Appendix A. A single-page
cover letter addressed to Breanne Meier, Director of Campus Procurement,
Colorado Mesa University, outlining the firm(s) qualifications is required at the
front of the submittal. (Not counting the cover letter and required
Acknowledgement and Attestation form, the entire submittal is to be no more
than 30 pages, single sided, on 8 12' x 11" sized paper in portrait format, with
least 12 font. No physical submittals.
b. Qualifications shall be evaluated in accordance with criteria as indicated in
PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding
Evaluation Form in Appendix A.
c. Response to all items shall be complete.
d. All references shall be current and relevant.
e. Complete and execute the Appendix C: Acknowledgment and Attestation Form
and submit at the back of the Qualification Submittal.
f. An electronic copy of the qualification package, submitted via Bidnet/Rocky
Mountain E-Purchasing System (RMEPS),
https://www.rockymountainbidsystem.com is due November 5, 2026 and shall
be received no later than 1:00 PM (MDT).
g. Late submittals or any other submittals not posted to Bidnet/Rocky Mountain E-
Purchasing System will be rejected without consideration. The State of
Colorado assumes no responsibility for costs related to the preparation of
submittals.
IX. METHOD OF SELECTION AND AWARD
A. Short List
1. From the submittals received, a short list of qualified respondents shall be
identified using the scoring indicated on the enclosed Evaluation Form,
Appendix A.
RFQ-AE R3
Rev 09/2025

2. Firms failing to meet the minimum required qualifications will not receive
further consideration.
B. Oral Interview
1. Mandatory oral interviews shall be conducted for the short-listed firm(s)
only. Interview times and location will be arranged Colorado Mesa
University and all short-listed firms will be notified in advance. At the
option of the State, a visit to the short-listed firm(s) managing home office
and/or representative field office may be required.
C. Method of Selection and Award
1. Submittals will be evaluated by a panel of individuals selected in
accordance with state policies. The panel will review and score the
submittals. Firms ranked the highest will be invited to an oral interview. It
is anticipated no fewer than three (3) or no more than four (4) will be
interviewed.
X. EVALUATION OF QUALIFICATIONS
A. PREQUALIFICATION SUBMITTAL CRITERIA
Firms will be judged not only on their past experience for the type of work involved, but
also on their ability to address issues critical to the success of the project requirements
outlined in this RFQ document. The primary focus of the prequalification evaluation will
be the firm(s) capability.
1. PROJECT TEAM
Identify the project principal, the project manager, key staff and subconsultants.
Present a brief discussion regarding how the team's qualifications and experience
relate to the specific project.
* Qualifications and relevant individual experience.
* Unique knowledge of key team members relating to the project.
* Experience on projects as a team.
* Key staff involvement in project management and on-site presence.
* Time commitment of key staff.
* Qualifications and relevant subconsultant experience.
2. FIRM/TEAM CAPABILITIES
Organization charts and graphs depicting your capacity may be included.
* Are the lines of authority and coordination clearly identified?
* Are essential management functions identified?
* Are the functions effectively integrated? (e.g., subconsultants' role
delineated)?
* Current and projected work load.
3. PRIOR EXPERIENCE
Include the name and current telephone number of the owner's project manager
for every project listed.
RFQ-AE R3
Rev 09/2025

* Experience of the key staff and firm with projects of similar scope and
complexity.
* Demonstrated success on past projects of similar scope and complexity.
* References.
4. PROJECT APPROACH
For the project and services outlined in the RFQ document, describe how you plan
to accomplish the following project control and management issues:
* Budget Methodology / Cost Control
a. Establish and maintain estimates of probable cost within owner's
established budget.
b. Control consultant contract costs
c. Coordinate value engineering activities
d. Budget Considerations
* Quality Control Methodology
a. Insure State procedures are followed
b. Improve energy efficiency through the use of an integrated design
process, life cycle costing, the use of an energy standard (current OSA
energy code) and the specification of energy efficient materials,
systems, and equipment
c. Reduce embodied carbon emissions by utilizing and submitting
Environmental Product Declarations (EPDs) that meet the OSA's
maximum acceptable global warming potential (GWP) limits
d. Insure the project is designed for durability and maintainability
* Schedule
a. Manage the required work to meet the established schedule
5. EQUITY, DIVERSITY AND INCLUSION
a. Describe how your firm is incentivized to hire and promote diverse
individuals
b. Describe how your team attempts to partner with Service-Disabled
Veteran Owned Small Businesses or historically disadvantaged businesses
6. WORK LOCATION
Describe where the prime and subconsultants will do the key work elements of
this project.
RFQ-AE R3
Rev 09/2025

a. Proximity of firms office as it may affect coordination with the State's
project manager and the potential project location.
b. Firm's familiarity with the project area.
c. Knowledge of the local labor and material markets.
XI. ORAL INTERVIEWS EVALUATION CRITERIA
(Note that the primary focus of the Oral Interview will be the proposed project management
team members' capabilities).
It is anticipated that oral interviews will be conducted on November 5, 2026. Interviews will
be conducted at the University Center. Room number and address will be communicated in
correspondence with short-listed firms. The time for interviews is to be determined. Key
personnel from the firm and major consultants who will be directly involved with the
project should attend the interview. The interview panel will, in particular, be interested in
knowing about the specific project approach proposed and in meeting the individuals who
will act as the primary contacts with Colorado Mesa University.
1. PROJECT TEAM
2. TEAM CAPABILITIES
3. PRIOR EXPERIENCE
4. PROJECT APPROACH
5. EQUITY, DIVERSITY, AND INCLUSION
6. WORK LOCATION
RFQ-AE R3
Rev 09/2025

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Description Opening Date/Time Closing Date/Time IFB 2027 Water & Wastewater Chemical Bid October

City of Craig

Bid Due: 12/15/2026

Bid Number: RFI-SN-2026-31 Bid Title: Deputy Municipal Judge Category: 2026 Bid's & RFP'S

Steamboat Springs

Bid Due: 11/24/2026

Follow Wideband and Narrowband Global SATCOM Sustainment (WNGSS) IDIQ Contract Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 11/17/2026

Project ID: 26-067 (EW2601) Title: Concrete Improvements - Elmwood Golf Course Cart Paths

City of pueblo

Bid Due: 11/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.