SSE ID#: 0000365032
TITLE: RFP #6401 D/B Services for LIRR West Side Yard Flood
Mitigation Measures
PROPOSAL DUE DATE: November 30, 2023, at 2:00pm
DOCUMENT AVAILABILITY: September 29, 2023
Proposals will only be accepted from those Developers pre-qualified by MTA C&D
under Step 1, which are listed below in alphabetical order:
• Posillico Civil, Inc.
• Lead Contractor: Posillico Civil, Inc.
• Lead Designer: Dewberry Engineers Inc.
• Skanska USA Civil Northeast Inc.
• Lead Contractor: Skanska USA Civil Northeast Inc.
• Lead Designer: Thorton Tomasetti, Inc.
• Gramercy-Scalamandre A Joint Venture
• Lead Contractor: Gramercy-Scalamandre A Joint Venture
• Lead Designer: Stantec Consulting Services Inc.
• Michels Corporation
• Lead Contractor: Michels Corporation
• Lead Designer: Urban Engineers of New York, D.P.C.
Interested subcontractors are encouraged to contact the pre-qualified Developers for
subcontracting opportunities. Project Site Tours and Pre-Proposal Conference will be held as
follows:
Pre-Proposal Conference:
• See Instructions to Proposers for Date and Location
Site Tours (Multiple Dates)
• See Instructions to Proposers for Dates and Locations
Those who wish to attend the Pre-Proposal Conference/Site Tour should contact
Everett Mclndoe at everett.mcindoe@mtacd.org to confirm attendance.
Interested subcontractors are encouraged to contact the pre-qualified Developers for
subcontracting opportunities. For applicable Developer contact information, return to
the previous page, and select the link for the projects Plan Holders List.