| Location: | Oklahoma |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Jul 28, 2026 |
| Agency: | City of Broken Arrow |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10227208 |
| Publication URL: | To access bid details, please log in. |
| Post Date | 07/07/2026 |
| Quest Number | 10227208 |
| Category Code | ADA Curb Ramps,Aggregate,Asphalt Overlay, Rehab. and/or Maint.,Bituminous Patching/Coating/Surfacing,Concrete Walkway,Concrete/Formed/Flatwork/Foundation,Construction,Curbs,Drainage,Erosion Control - Temporary,Erosion Control/Slope, Bank Stabilization,Excavation,Grade and Surface,Grubbing & Clearing,Pavement - Marking,Pavement Removal,Pavement Resurface and Rehabilitation,Paving (Asphalt or Concrete),Paving (Highway, Road or Street),Pedestrian Improvements,Roadway Pavement Markings,Safety Improvements,Sewer and Water Construction,Sidewalks/Curbs/Gutters,Signage,Storm Drain and Paving,Stormwater Improvements,Street/Road Asphalt Milling,Street/Road Asphalt Resurfacing and Milling,Street/Road Pavement Marking,Street/Road Repairs,Street/Road Widening,Street/Road Widening (Major),Street/Roadway Reconstruction ,Traffic Control,Traffic Control Devices (Signals, Signing, etc.),Walkway/Passage/Corridor,Water Infrastructure (Water Meters),Water Utilities,Water/Wastewater Infrastructure |
| Bid/Request Name | ST2031 - Aspen Avenue Improvements from Jasper Street to Tucson Street (Phase 3) |
| Bid Closing Date | 07/28/2026 01:45 PM CDT |
| City | Broken Arrow |
| County | Tulsa |
| State | OK |
| Owner | Broken Arrow, City of |
| Soliciator | Broken Arrow, City of |
| Posting Type | Construction Project |
| Site Address: | Aspen Ave between Jasper and Tucson | |
| City: | Broken Arrow | |
| County: | Tulsa | |
| State/Province: | OK | |
| Site Directions: | Project includes Aspen Avenue Widening Improvements between Jasper Street and Tucson Street in Broken Arrow, OK. |
|
Online Bidding:
|
Available | |
| Closing Date: | Tue, 07/28/2026 01:45 PM CDT | |
| Project Bid Received By & Opening Information: | FOR THIS PROJECT, BIDS WILL ONLY BE RECEIVED AND ACCEPTED VIA THE ONLINE ELECTRONIC BID SERVICE THROUGH QUESTCDN.COM. All required affidavits and Proposal Guarantees MUST be submitted through QuestCDN.com with bid documents. Only bids submitted as required above by 1:45 p.m. on the date of the bid opening will be considered. BIDS WILL BE OPENED publicly at 2:00 p.m. on July 28th, 2026, at City of Broken Arrow "Virtual Bid Openings" or by “control clicking” on the following link: Virtual bid openings | Broken Arrow, OK . The bid opening will be live-streamed and recorded. |
| Project Category Code: | Safety Improvements, Pavement - Marking, Construction, Sidewalks/Curbs/Gutters, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Pavement Removal, Excavation, Erosion Control - Temporary, Paving (Asphalt or Concrete), Traffic Control Devices (Signals, Signing, etc.), Storm Drain and Paving, Street/Roadway Reconstruction , Asphalt Overlay, Rehab. and/or Maint., Sewer and Water Construction, Street/Road Widening, Street/Road Repairs, Street/Road Widening (Major), Grubbing & Clearing, Signage, Water Infrastructure (Water Meters), Paving (Highway, Road or Street), Water Utilities, Aggregate, Bituminous Patching/Coating/Surfacing, Concrete/Formed/Flatwork/Foundation, Street/Road Asphalt Resurfacing and Milling, Concrete Walkway, Street/Road Asphalt Milling, Traffic Control, Grade and Surface, Pavement Resurface and Rehabilitation, Stormwater Improvements, Walkway/Passage/Corridor, Roadway Pavement Markings, Drainage, Pedestrian Improvements, Street/Road Pavement Marking, Curbs, Water/Wastewater Infrastructure | |
| Description: | This project consists of street widening improvements to expand Aspen Avenue to 5 lanes including two-through lanes in each direction and a center left-turn lane in each direction. This arterial street segment will have new sidewalks and ADA-compliant curb ramps on both sides of the street. New pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with new asphalt pavement on Aspen Avenue. The project includes asphalt pavement surface, new sidewalks, storm sewers, waterline, pavement markings and signage. The total contract time for this project shall three hundred and (300) days. |
| Owner Name: | Broken Arrow, City of | |
| Address: | 220 S. First Street, Broken Arrow, OK - 74012 | |
| Phone: | 5393571693 | |
| Contact: | Brent Stout | |
| Email: | engineering.construction@brokenarrowok.gov |
| Solicitor Name: | Broken Arrow, City of | |
| Design Discipline: | Civil Engineer | |
| Address: | 220 S. First Street, Broken Arrow, OK - 74012 | |
| Phone: | 918-259-7000 x7412 | |
| Contact: | Brent Stout | |
| Email: | BStout@brokenarrowok.gov |
| Document Information: | Complete digital project documents are available at Broken Arrow, City of - Bidding Information" by "control clicking" on the above link: and/or QuestCDN.com . A contractor may view the project documents at no cost prior to becoming a Planholder. Input the QuestCDN project number eBidDoc# 10227208 on the website's projects search page to download the digital project documents for $22. Contact QuestCDN Customer Support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading digital project information and vBid online bid submittal questions. Project bid documents must be downloaded from QuestCDN which will add your company to the Planholder List and allow access to vBid online bidding for the submittal of your bid (which is required for this project). Bidders will be charged a fee of $42 to submit a bid electronically. | |
| Quest eBidDoc™ Delivery Info: |
Download delivery fee is $22.00 , file size is 44 MB .
Preview
Download
Fee for bidding online is $42.00 |

With GovernmentContracts, you can: