| Location: | North Carolina |
|---|---|
| Posted: | Mar 20, 2025 |
| Due: | Apr 3, 2025 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-ITBCON-21 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of demolition and disposal of existing Primary Clarifier No. 5 mechanism and ancillary components; installation of new circular clarifier mechanism purchased via a separate Procurement Contract; replacement of all exposed piping and valves inside the sludge and scum vaults; replacement of concrete topper inside Primary Clarifier No. 5; repairs of structural elements within the basin; modification of existing chemical feed dosing locations in the effluent flow vault; replacement of seals, actuators, and stems on existing slide and sluice gates.

With GovernmentContracts, you can:
...Back Flow Devices Event: 12382-0 Reference: Water Resources Type: INFORMAL BID Open Date: ...
City of Greensboro
Bid Due: 6/25/2026
...of the WTP; with Lagoon 2 receiving the vast majority of this flow. ...
City of Durham
Bid Due: 6/12/2026
...surface flow and unnamed tributaries to Stirrup Iron Creek, which has a NC ...
State Government of North Carolina
Bid Due: 6/25/2026