Town of Grottoes WWTP Lagoon Sludge Removal, Dewat...
| Location: |
Virginia |
| Posted: |
Nov 15, 2024 |
| Due: |
Dec 6, 2024 |
| Agency: |
State Government of Virginia |
| Type of Government: |
State & Local |
| Category: |
- F - Natural Resources and Conservation Services
|
| Solicitation No: |
IFB 81712-1 |
| Publication URL: |
To access bid details, please log in. |
IFB-81712
-
Town of Grottoes WWTP Lagoon Sludge Removal, Dewatering and Disposal Project
i
-
-
Round:1
-
Status:
Open
-
Time Left:20 days
-
Closing:12/6/24 12:00 PM
-
Issued:11/13/24 4:30 PM
-
Last Updated:11/14/24
-
Buyer:Jennifer Whetzel
-
jwhetzel@ci.grottoes.va.us
-
540-249-5896
IFB-81712
-
Town of Grottoes WWTP Lagoon Sludge Removal, Dewatering and Disposal Project
i
-
-
Round:1
-
Status:
Open
-
Time Left:20 days
-
Closing:12/6/24 12:00 PM
-
Issued:11/13/24 4:30 PM
-
Last Updated:11/14/24
-
Buyer:Jennifer Whetzel
-
jwhetzel@ci.grottoes.va.us
-
540-249-5896
-
Issued By:Town of Grottoes
-
Opportunity Type:Invitation for Bids (IFB)
-
Category:Professional Services
-
Work Location:TOWN OF GROTTOES, VA WWTP
-
Website:https://www.townofgrottoes.com/news-public-notices
-
Pre-Bid Conference:See solicitation documents for mandatory prebid/proposal conference/site visit.
-
Open Responses:See solicitation documents Public Opening information.
-
Summary:The Project includes the following Work:
Contractor to furnish all necessary equipment, materials and labor to remove settled material from the identified Lagoon Cell utilizing a method that does not come into contact with nor impact the integrity of the Lagoon liner. The removed material shall be conveyed to an onsite dewatering system furnished and operated by Contractor. The dewatered material shall be contained on site in a water tight container at all times and routinely taken off site by Contractor for disposal. The unit price submitted for the bid shall include all equipment, material, labor, hauling, disposal fees, tipping fees etc. for removing the material from the lagoon, dewatering the material, all material handling, transporting and disposal costs.
Owner shall be responsible for providing only the following to the Contractor at no cost to the Contractor:
Access to the plant, M-F 7 AM to 5 PM beginning in the Spring of 2025.
Provide required power for Contractors onsite dewatering system.
Provide backflow prevented potable water for the Contractors onsite dewatering system.
The Project has an expected duration of 60 days.
-
Round Information:Provide correct email address in the document
Grid 1 - Response
-
I1_1. The Project includes the following Work: Contractor to furnish all necessary equipment, materials and labor to remove settled material from the identified Lagoon Cell utilizing a method that does not come into contact with nor impact the integrity of the Lagoon liner. The removed material shall be conveyed to an onsite dewatering system furnished and operated by Contractor. The dewatered material shall be contained on site in a water tight container at all times and routinely taken off site by Contractor for disposal. The unit price submitted for the bid shall include all equipment, material, labor, hauling, disposal fees, tipping fees etc. for removing the material from the lagoon, dewatering the material, all material handling, transporting and disposal costs. Owner shall be responsible for providing only the following to the Contractor at no cost to the Contractor: Access to the plant, M-F 7 AM to 5 PM beginning in the Spring of 2025. Provide required power for Contractors onsite dewatering system. Provide backflow prevented potable water for the Contractors onsite dewatering system. The Project has an expected duration of 60 days.
-
NIGP Code:
-
Quantity: 1.00000
-
Delivery Date:
B2B Follow
×
Enter Email Address:
CloseSubmit
B2B Unfollow
×
Enter Email Address:
CloseSubmit
Add B2B Posting
×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Message:
CloseSubmit
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...of anaerobically digested sludge at the Moores Creek Advanced Water Resource Recovery Facility. ...
State Government of Virginia
Bid Due: 7/30/2026
...of anaerobically digested sludge at the Moores Creek Advanced Water Resource Recovery Facility. ...
State Government of Virginia
Bid Due: 7/30/2026
...and equipment to provide equipment replacement services for sludge belt conveyors #1-3 to ...
State Government of Virginia
Bid Due: 6/15/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.