PROJECT Nos: #622 – New Sewer Connections #623- Abandon (4) 2" galvanized lines #624-New 4" PVC

Location: Florida
Posted: Jun 2, 2025
Due: Jun 24, 2025
Agency: City of Flagler Beach
Type of Government: State & Local
Category:
  • D - Automatic Data Processing and Telecommunication Services
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: FB-25-0602
Publication URL: To access bid details, please log in.
Bid Number: FB-25-0602
Bid Title: PROJECT Nos: #622 – New Sewer Connections #623- Abandon (4) 2" galvanized lines #624-New 4" PVC
Category: Invitation to Bid
Status: Open
Description:

1.02 Summary of Work

1.02.1 Project #622: Sewer Connections & Laterals – Oak Street [Sheet A-1]

1.02.1.1 Install approximately 375 LF of 3” PVC sewer pipe. Cap the north end and terminate into manhole at the west terminus of Pine Tree Street.

1.02.1.2 Install three 1-1/2” laterals as shown on sheet A-1. Terminate each lateral in a valve box with a shut-off valve.

1.02.1.3 Restore all disturbed areas back to the pre-construction condition or better.

1.02.2 Project #623: Isolate four 2” Galvanized pipes by installing line stop valves at both ends – between S. Central Ave. and S. Daytona Ave. from S. 13th St. to 16th St. [Sheet A-2]

1.02.2.1 Install six 2” line stops on four existing 2” galvanized pipes. Terminate these lines from the mains using 2” valves.  There are two existing valves that need to be shut off (these are located at the east ends of S. 15th and S. 16th Streets). If these valves cannot be closed completely, then install line stops and new valves similar to the other six.

1.02.2.2 Restore all disturbed areas back to the pre-construction condition or better.

1.02.3 Project #624: Install new PVC Pipe – S. 13th to S. 14th Streets Alleyway between A1A & S. Central Avenue.

1.02.3.1 Install approximately 900 LF of 4” PVC pipe as shown on Sheet A-3 in drawings. Do two wet taps from the water main along S. Central Ave., and install 4” isolation valved at 13th and 14th Streets as shown on the drawings.

1.02.3.2 Install 2” line stop and valve on the existing 2” galvanized pipe coming from the water main at 13th St.  Install a minimum of 12” from the main.  This line will remain abandoned.

1.02.3.3 Inspect the valve on the existing PVC pipe near 14th St. in the alley (this valve will be located by the Public Works Dept. upon request).  If the valve is operable, close valve completely and the line will be abandoned in place.  If the valve will not close, install a line stop (match size to the PVC pipe) and valve on the south side of the valve.

1.02.3.4 Disconnect all existing laterals to each meter on the east side of the alleyway from the water supply box and remove completely (from the box to the abandoned pipes described above).

1.02.3.5 Add new PVC laterals from the newly installed 4” PVC pipe to each property on the east side of the alleyway. The laterals sizes should match the existing lateral pipes that were removed. Connect the new laterals to the respective meters.

1.02.3.6 Restore all disturbed areas back to the pre-construction condition or better.

Publication Date/Time:
6/2/2025 6:00 am
Publication Information:
Palm Coast Observer
Closing Date/Time:
6/24/2025 2:00 pm
Submittal Information:
Penny Overstreet, City Clerk 105 S. 2nd Street Flagler Beach, Florida 32136
Bid Opening Information:
2:00 p.m. June 24, 2025
Pre-bid Meeting:
June 09, 2025 at 11:00a.m.
Contact Person:
Penny Overstreet, City Clerk
poverstreet@cityofflaglerbeach.com
Download Available:
yes
Fee:
N/A
Plan & Spec Available:
yes
Business Hours:
Monday-Friday 8:00 to 5:00
Miscellaneous:
Downloads available under related documents tab.
Related Documents:
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization.... ...

DEPT OF DEFENSE

Bid Due: 6/23/2026

..., other data furnished in SOW, and information covered during a pre-construction/criteria review ...

DEPT OF DEFENSE

Bid Due: 6/12/2026

...of agreement and forfeiture of bid security. A pre-construction meeting will be held ...

City of Atlantic Beach

Bid Due: 7/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.