| Location: | South Carolina |
|---|---|
| Posted: | Nov 25, 2025 |
| Due: | Jan 6, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 44449-01-25/26 |
| Publication URL: | To access bid details, please log in. |
Site development and turn-key addition (approximately 800 sq. ft.) to an existing single-story Senior Center. The existing building is 7,649 sf and Type V-B, non-sprinklered; non-separated uses with A-3 as primary occupancy. The structural system includes a slab on grade, metal stud exterior walls, and wood roof trusses.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29303 Project Delivery Method: Design-Bid-Build Construction Cost Range: $425,000.00 - $525,000.00... Description: Roof ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/10/2026
...Location: 1000 Blossom Street, Columbia, Sc 29208 Project Delivery Method: Design-Bid-Build Construction...@mailbox.sc.edu Telephone: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...: Printed: 5 Electronic: 1 ANTICIPATED PROJECT DELIVERY METHOD: Design-Bid-Build CM-R N/A AGENCY...: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/08/2026