| Location: | South Carolina |
|---|---|
| Posted: | Jan 14, 2026 |
| Due: | Feb 17, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | W-25-83 |
| Publication URL: | To access bid details, please log in. |
Installation of approximately 120 LF 8 water main, 260 LF 6" water main, complete in place pipe bridge and related appurtenances to replace an old dilapidated main that is attached to the existing SCDOT bridge structure crossing Middle Fork Twelve Mill Creek.
Project funded by a grant from ARPA and the SC RIA, all Bidders must comply with all applicable state and federal requirements. SAM.GOV registratin will be used to verify debarment status as required.

With GovernmentContracts, you can:
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... Engineer ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...to the regional design guidelines. Project Details: http://www.bcdcog.com Print Ad ... Telephone: n/a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/30/2026
...Project Location: Kirkwood Park, 192 Stowers Road, Camden, SC Project Delivery Method: Design-Build... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/16/2026
...project consists of ACM removal in accordance to project design. Documents May Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/06/2026