Title: UCC Generator Replacement Project
Addenda: 4
Release Date: 4/2/2025
Due Date: 6/30/2025
Remove and replace generator system, associated infrastructure, (fuel tank, mat slab, stairs, power feed) 800-amp triple with enclosure, and lighting at exterior mechanical area. Install 600-amp automatic transfer switch and 200-amp panel at the electrical room. Add lighting at mechanical room.

With GovernmentContracts, you can:
...modifications on Level 3; an Automatic Transfer Switch (ATS) on Level P1; and ...
UCLA Capital Programs
Bid Due: 11/05/2026
..., generator and automatic transfer switch (ATS) troubleshooting, temporary power connections, and emergency..., ...
San Benito County