| Location: | Georgia |
|---|---|
| Posted: | Jun 3, 2025 |
| Due: | Jul 3, 2025 |
| Agency: | Forsyth County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-84-1514 |
| Publication URL: | To access bid details, please log in. |
Project Description: Providing all material, equipment, and all labor for the proposed reconstruction of Clayburn Road and intersection improvements for 3 intersections in Forsyth County. The proposed design includes 0.12 miles reconstruction along Clayburn Road and new cul-de-sac. The 3 intersections are:
• Young Deer at Pilgrim Mill Road
• Sunrise Lane at Pilgrim Mill Road
• Clayburn Road at Sunrise Lane
The typical section for Clayburn Road is a paved 18-foot roadway. The project also includes the installation of drainage structures, storm drainpipes, asphalt, signing and marking, erosion, sedimentation and pollution control measures, relocation waterlines and other associated work.

With GovernmentContracts, you can:
...qualified contractors to provide roadway milling, asphalt resurfacing, deep patching, pavement marking... labor, ...
State Government of Georgia
Bid Due: 10/14/2026
...consists of furnishing all materials, equipment and labor for the construction of improvements... ...
State Government of Georgia
Bid Due: 10/22/2026
...Bid Number: P27-4200-07 Bid Title: Road Asphalt Resurfacing LMIG/SAP 2026 Category: Public Works... ...
Camden County, GA
Bid Due: 10/15/2026
...: 2027 Description The work to be done consists of furnishing all materials, ...
State Government of Georgia
Bid Due: 9/29/2026