| Location: | Georgia |
|---|---|
| Posted: | Jun 3, 2025 |
| Due: | Jul 3, 2025 |
| Agency: | Forsyth County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-84-1514 |
| Publication URL: | To access bid details, please log in. |
Project Description: Providing all material, equipment, and all labor for the proposed reconstruction of Clayburn Road and intersection improvements for 3 intersections in Forsyth County. The proposed design includes 0.12 miles reconstruction along Clayburn Road and new cul-de-sac. The 3 intersections are:
• Young Deer at Pilgrim Mill Road
• Sunrise Lane at Pilgrim Mill Road
• Clayburn Road at Sunrise Lane
The typical section for Clayburn Road is a paved 18-foot roadway. The project also includes the installation of drainage structures, storm drainpipes, asphalt, signing and marking, erosion, sedimentation and pollution control measures, relocation waterlines and other associated work.

With GovernmentContracts, you can:
...2026-21: Newton Drive Storm Drainage Improvements Project Bids are due by 10:00 AM ...
City of Covington
Bid Due: 10/13/2026
...Storm Drainage & Street Improvements to Serve S. Flowers Drive Blakely, City Of ...
State Government of Georgia
Bid Due: 9/10/2026
...City of Blakely - Flowers Drive Storm Drainage & Street Improvements Advertisement for ...
Still Waters Consulting Engineering
Bid Due: 9/10/2026
...2026-21 Newton Drive Storm Drainage Improvements Project Covington, City Of Aug 24, 2026 ...
State Government of Georgia
Bid Due: 10/13/2026