| Location: | Georgia |
|---|---|
| Posted: | Jun 3, 2025 |
| Due: | Jul 3, 2025 |
| Agency: | Forsyth County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-84-1514 |
| Publication URL: | To access bid details, please log in. |
Project Description: Providing all material, equipment, and all labor for the proposed reconstruction of Clayburn Road and intersection improvements for 3 intersections in Forsyth County. The proposed design includes 0.12 miles reconstruction along Clayburn Road and new cul-de-sac. The 3 intersections are:
• Young Deer at Pilgrim Mill Road
• Sunrise Lane at Pilgrim Mill Road
• Clayburn Road at Sunrise Lane
The typical section for Clayburn Road is a paved 18-foot roadway. The project also includes the installation of drainage structures, storm drainpipes, asphalt, signing and marking, erosion, sedimentation and pollution control measures, relocation waterlines and other associated work.

With GovernmentContracts, you can:
...-foot wide sidewalks. The project also includes the installation of drainage structures, storm... ...
Forsyth County
Bid Due: 10/15/2026
..., installation of storm drainage piping and appurtenances, erosion and sediment control measures..., ...
State Government of Georgia
Bid Due: 10/01/2026
..., and information systems distribution), lighting, storm drainage, and other site improvements. Furnishings... ...
DEPT OF DEFENSE
Bid Due: 10/02/2026