| Location: | Texas |
|---|---|
| Posted: | Sep 11, 2025 |
| Due: | Sep 22, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
.... Without proper water treatment, these traits cause scale, corrosion, and biofouling that ...
El Paso Independent School District
Bid Due: 7/01/2026
...Water and Wastewater Treatment Plant Chemicals Solicitation ID: RFB2026-10-01Chemicals Due Date: 7...
State Government of Texas
Bid Due: 7/09/2026
...for HVAC Water Treatment Services, Water Treatment Equipment Repairs, and Cooling Tower Cleaning...
Tarrant County
Bid Due: 7/06/2026
...Project: Purchase of WATER SUPPLY, GROUNDWATER, SEWAGE TREATMENT, AND RELATED EQU - *218149 ...
City of Dallas
Bid Due: 6/17/2026