| Location: | Texas |
|---|---|
| Posted: | Jun 3, 2025 |
| Due: | Jul 8, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-041 |
| Publication URL: | To access bid details, please log in. |
Project Description: The City of Waco has issued this solicitation for the Speegleville Regional Detention Improvements. The project shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place an approximately 37,000 cubic yard regional detention pond and outfall weir structure, approximately 3,100 linear feet of drainage channel, approximately 600 linear feet of culverts and storm drain pipe, 2,000 linear feet of gravity wastewater line, 13 new manholes of various size and material, temporary by-pass system, abandonment of existing
wastewater lines, approximately 1,000 linear feet of water line, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein.

With GovernmentContracts, you can:
...Laboratory Testing of Wastewater Solicitation ID: 26-082 Due Date: 6/24/2026 Due Time: 3:00 ...
State Government of Texas
Bid Due: 6/24/2026
...Water and Wastewater Treatment Plant Chemicals Solicitation ID: RFB2026-10-01Chemicals Due Date: 7...
State Government of Texas
Bid Due: 7/09/2026
...Wainwright - Construct Wastewater Treatment Plant Solicitation ID: 696-FD-26-P007 Due Date: 6/24...
State Government of Texas
Bid Due: 6/24/2026
...for Wastewater Treatment Plants 06/11/2026 07/13/2026 City of Pasadena Request for Proposals RFP... ...
City of Pasadena
Bid Due: 7/13/2026