| Location: | Washington |
|---|---|
| Posted: | Nov 12, 2025 |
| Due: | Nov 24, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 11/24/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 10,000 linear feet of HMA shared use path (12,000 square yards of 3-inch thick HMA and 4-inch thick CSTC), 2700 cubic yards of excavation and embankment, 200 linear feet of storm sewer, 4 drainage structures, 1 20-ft long contractor designed buried structure, 350 linear feet of absorption trench, 400 linear feet of gravity block wall (2.5-4.0 feet tall), 1 pedestrian hybrid beacon system, 100 linear feet of sidewalk, 400 linear feet of cement concrete curb, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...Bid Number: CON-2025-39 Bid Title: Francis Street Sewer Trestle Repair Category: Public Works... ...
City of Port Angeles
Bid Due: 8/18/2026
...construction of a new wet well, electrical building including SCADA, gravity sewer, sedimentary ...
City of Vancouver
Bid Due: 8/25/2026
...comprehensive utility rate studies for the City's Water, Sewer and Stormwater Enterprise Funds. ...
City of Vancouver
Bid Due: 8/05/2026
...and Sewer Line and Related Structures Construction Place of Performance: Mossyrock , WA ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/18/2026