NOTICE INVITING BIDS
TICO MUTUAL WATER COMPANY CONSOLIDATION – PHASE II
RFP Number: 2026-04
NOTICE IS HEREBY GIVEN that the VENTURA RIVER WATER DISTRICT (“District”) will
receive sealed bids for the TICO MUTUAL WATER COMPANY CONSOLIDATION – PHASE II
(“Project”) from qualified bidders, no later than 3:00 p.m. on Thursday, January 7, 2027. Bids
will be publicly opened. All bids must conform to the terms in District’s Request for Bids (“RFB”).
It is the vendor's responsibility to ensure it has received all addendums. Late bids will not be
accepted.
The Project consists of installing 6, and 8 inch diameter water main, installation of residential
water meters and associated water services, as well as removal of an existing 6 inch diameter
PVC pipeline, temporary potable water highline, disconnection of a connection to the existing Tico
water system, trench pavement repair and installation of two fire hydrant assemblies in the
unincorporated Ventura County (Oak View). .
Issued for Bid (IFB) documents can be accessed at no cost through the District’s electronic file
repository at:
https://vrwd.ca.gov/doing-business
One Pre-Bid Job Walk will be offered on December 17, 2026 at 1 PM at:
Ventura River Water District
409 Old Baldwin Road,
Ojai, CA 93023
The Pre-Bid Job Walk is optional; however, it is the bidder’s responsibility to thoroughly assess
and account for site conditions before submitting a bid.
Direct all questions to the District’s Project Engineer, Jon Turner, Phoenix Civil Engineering, Inc.,
by email at: jturner@phoenixcivil.com. Bidders must email any questions to Project Engineer no
later than 2:00 p.m. on Wednesday, December 30, 2026. Responses to all questions will be
sent to all bidders no later than 3:00 p.m. on Monday, January 4, 2027.
General contractors who download the RFP documents from the above link should email the
Project Engineer at: jturner@phoenixcivil.com, to be placed on the bidders list for addenda.
All bids shall be accompanied by a cashier’s check or certified check payable to the order of
Ventura River Water District, amounting to (10%) percent of the Bid or by a bond in said amount
and payable to Ventura River Water District signed by the Bidder and a corporate surety, or by
the Bidder and two sureties who shall justify before any officer competent to administer an oath,
in double the amount and over and above all statutory exemptions (“Security”). In the event that
the Bidder fails, within five (5) working days after written notice that the Contract has been
awarded to them; to enter into a Contract with the District, the District may award the Contract to
the second lowest bidder. In such event, the amount of Bidder’s Security shall be applied by the
VRWD to the difference between the Bidder’s Bid and the second lowest Bid, and the surplus of
the Security, if any, shall be returned to the Bidder if cash or check is used, or to the surety on
Bidder’s bond if a bond is used.
The Bids must be on forms obtained as set forth above and must be delivered to the Ventura
River Water District at 409 Old Baldwin Road, Ojai, CA 93023 in a sealed envelope marked “Bid
For TICO MUTUAL WATER COMPANY CONSOLIDATION – Phase II ”, up to but not later
than 3:00 PM, Thursday, January 7, 2027. Bids will be publicly opened, examined and read
aloud at that time, at 409 Old Baldwin Road, Ojai, CA 93023. The District Board of Directors
reserves the right to reject any and all Bids. The successful bidder shall have 75 calendar days
from the date of the Notice to Proceed to complete the work.
At the successful Contractor's option, securities may be substituted for the required retention, in
accordance with the provisions of Section 22300 of the State of California Public Contract Code.
Pursuant to California Civil Code Section 9550, a payment bond is required and must be furnished
for this public works contract, which involves expenditure in excess of twenty-five thousand dollars
($25,000.00). The successful bidder shall also furnish a faithful performance bond and a
maintenance bond as specified in the Contract Documents.
In accordance with the provisions of California Public Contract Code Section 3300, the District
has determined that the Contractor shall possess, as a minimum, a valid Class A License. In
accordance with the provisions of the California Business and Professions Code Section 7028.15,
a bid submitted to the District by a Contractor who is not licensed in accordance with Chapter 9
of the California Business and Professions Code shall be considered non-responsive and shall
be rejected by the District.
No bidder may withdraw its bid for a period of ninety (90) days after the date set for the opening
thereof.
BID PROTEST: Any Bid protest must be submitted in writing to the Project Manager at the District
Office located at 409 Old Baldwin Road, Ojai, CA before 4:30 PM of the fifth Business Day
following transmission and posting of the District’s Notice of Intent to Award. The notice will be
posted at the District Office. The District will use reasonable efforts to deliver by facsimile and/or
e-mail a copy of the Notice of Intent to Award to all Bidders who submitted Bids no later than the
Business Day after issuance, although any delay or failure to do so will not extend the Bid protest
deadline described above.
This is a public works project subject to the payment of prevailing wage and all related
requirements. Pursuant to SB854, No contractor or subcontractor may be listed on a bid proposal
for a public works project unless registered with the Department of Industrial Relations pursuant
to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement
by the Department of Industrial Relations pursuant to Labor Code section 1771.4.
Alma Quezada, P.G., General Manager
Ventura River Water District