| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 28, 2026 |
| Due: | Oct 7, 2026 |
| Agency: | Housing Authority of the City of Pittsburgh |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB#600-28-26 |
| Publication URL: | To access bid details, please log in. |
IFB#600-28-26
OPEN
The Housing Authority of the City of Pittsburgh (hereinafter referred to as “HACP”), is a federally funded public housing agency. The Housing Authority maintains over 2500 units of rental housing. HACP is issuing this Invitation for Bids (“IFB”) for qualified and interested business firms to submit sealed bids for Homewood North Community Center HVAC Replacement, AMP-20 for the following contracts:
General Construction
Mechanical Construction
Electrical Construction
Issue Date:
Sep 8, 2026 08:00 amMeeting Date:
Sep 22, 2026 10:00 amDeadline Date:
Oct 7, 2026 10:00 am
Sep 8, 2026
Sep 8, 2026
PART 4: TECHNICAL SPECIFICATIONS
(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:3)(cid:36)(cid:49)(cid:39)(cid:3)(cid:39)(cid:53)(cid:36)(cid:58)(cid:44)(cid:49)(cid:42)(cid:54)
HomewoodNorthCommunityCenterHVACReplacement,AMP-20.
IFB CONTRACT NO. __ __
600-28-26
| Homewood North - Community Center Fukui Architects Pc 2 0 5 R o s s S t r e e t Pittsburgh, Pennsylvania 15219 HVAC Work Replacement ph 412.281.6001 fx 412.281.6002 (C) 2 0 2 6 F u k u i A r c h i t e c t s , P c Mechanical Unit replacement in existing community center. No changes to PROJECT LOCATION exisitng areas, structure, fire protection or egress. 10 Albertice St., seal Pittsburgh, PA 15208 Contact Schedule Drawing Index Note: Any questions concerning the Construction Documents shall first be directed to the Architect. The Architect will A1 Cover Sheet forward questions as appropriate to the consulting engineers. Drawing Index Project Contact Schedule Building Owner: Architect: Plan Review & Inspection: Code Conformance Information Site Location Map HACP Fukui Architects, PC City of Pittsburgh SITE PLAN A2 Abbreviations And Accessibility Diagrams 412 Boulevard of the Alies 205 Ross Street Departments of Permits, Licenses Abbreviations and Materials Pittsburgh,PA,15219 Pittsburgh, PA 15219 and Inspections A3 Demolition Plan and RCP general notes Demolition Plan Legend ph: 412.281.6001 200 Ross Street Site Location Map First Floor Demolition Plan fx: 412.281.6002 3rd floor, room 320 1 11.. Any conflicts in the drawings or between new and Roof Demolition Plan existing construction shall be referred to the Architect. First Floor Reflected Ceiling Demolition Plan emma@farpc.com Pittsburgh, PA 15205 22.. Contractor shall verify all dimensions and existing A4 Floor Plan and RCP contact: Emma Cline, AIA ph: 412.255.2175 conditions in the field and shall advise Fukui Architects, General Floor Plan Pc of any discrepancies between, additions to, deletions First Floor Reflected Ceiling Plan from, or alterations to any and all conditions prior to Reflected Ceiling Plan Legend proceeding with any phase of work. Do not scale Floor Plan Legend drawings. A5 Specifications LOT INFORMATION OBTAINED 33.. All work shall be installed in accordance with applicable codes and regulations. 10-08 Outline Specifications FROM ALLEGHENY COUNTY GIS A6 Specifications 44.. Contractor shall be responsible for the patching, 10-08 Outline Specifications MAP AND NOT INDEPENDENTLY repairing, and preparations of all existing floor, wall, and M000 Mechanical Notes ceiling surfaces as required to receive scheduled finishes. VERIFIED. ALL WORK AT INTERIOR U.N.O. HACP Homewood_Mechanical Set 55.. All items shown on drawings are finished construction M100 Mechanical Plan assemblies. Contractor shall provide and install all ALBERTICE STREET HACP Homewood_Mechanical Set material required for finished assemblies. M200 Mechanical Details 66.. All reports, plans, specifications, computer files, field data, notices, and other documents and instruments HACP Homewood_Mechanical Set 14.84' prepared by the Architect as instruments of service shall M300 Mechanical Schedules remain the property of the Architect. The Architect shall HACP Homewood_Mechanical Set retain all common law statutory, and other reserved rights, including the copyright thereto. revisions 1 ISSUE FOR CLIENT REVIEW 02.28.2025 2 ISSUE FOR BID AND PERMIT 09.24.2025 3 ISSUE FOR ZDR REVISIONS 01.07.2026 Code Conformance Information 4 IFC & IFB 05.19.2026 ASPHALT Applicable Codes PARKING General: 2021 International Existing Building Code PLAYGROUND LOT M Accessibility: ANSI/ICC A117.1 2009 O Energy: 2021 International Energy Conservation Code H Electrical: 2020 NEC (NFPA 70) L E IMAGE OF EXISTING project title Fire: 2021 International Fire Code R S ROOF EQUIPMENT Fuel Gas: 2021 International Fuel Gas Code T Owner: Mechanical: 2021 International Mechanical Code R E HACP Plumbing: 2022 Allegheny County Health Department Plumbing Code 1 "0-'031 E EXISTING ONE STORY 4 T 412 Boulevard of the Alies Fire Alarm: 2021 NFPA 72 4 BRICK BUILDING ' Pittsburgh,PA,15219 Sprinkler: 2021 NFPA 13 U U General Building / Project Information P P 4'-1" Project Location: Compliance Method: Work Area Homewood North - Community Center Classification of Work: Level 2 Alteration HVAC Work Replacement Occupancy Group: A-3, B, E. (Only A-3 in scope) 10 Albertice St. ADJACENT non-separated occupancies (A-3 most restrictive) Pittsburgh, PA 15208 BUILDING Stories: 1 Story "0-'4 Bulding Height: +/- 25'-0" Building Gross Area: 4,745 SF Work Area: 37.5 SF Construction Type: VB Sprinklers: NFPA 13 drawing title Fire Alarm: NFPA 72 Cover Sheet Drawing Index, Code Conformance Information, Project NOTE: SCOPE OF WORK LIMITED TO REPLACING EXISTING MECHANICAL EQUIPMENT, REMOVAL OF ABANDONED EQUIPMENT, CREATION OF A NEW OPENING IN THE CLG SYSTEM FOR FUTURE RTU SERVICING, AND REMOVAL OF Contact Schedule, Site Location Map, EXISITNG TEMPORARY FURNACE AND ENCLOSURE. TEMPORARY REMOVAL OF EXISTING SMOKE/CARBON MONOXIDE SITE PLAN DETECTORS AND LIGHTING FIXTURES TO CREATE NEW OPENING FOR FUTURE RTU SERVICING. TEMPORARY REMOVAL 74.19' 40' 40' 40' 80' OF EXISTING FIRE ALARM DEVICES AND LIGHTING FIXTURES TO CREATE NEW OPENING FOR FUTURE RTU SERVICING. TEMPORARY RELOCATION OF SPRINKLER HEADS TO REMAIN ACTIVE DURING CONSTRUCTION. REINSTALLATION OF (1) NEW 48"x 49" CONDENSING SUSPENDED GRID CEILING SYSTEM, WTIH NEW ACOUSTIC TILES. UP UNIT TO BE REPLACED IN-KIND. MONTICELLO STREET REMAINING EXISTING IN-USE scale SShheeeett NNoo.. EQUIPMENT TO REMAIN, AND ALL As Noted ABANDONED EQUIPMENT TO BE date REMOVED. 05.19.2026 A1 no. of. N 1 10 SITE PLAN 2 Project #2441 SCALE: 1/16" = 1'-0" | |||
|---|---|---|---|
| scale As Noted | SShheeeett NNoo.. A1 Project #2441 | ||
| date 05.19.2026 | |||
| no. 1 | of. 10 | ||
| LOT INFORMATION OBTAINED FROM ALLEGHENY COUNTY GIS MAP AND NOT INDEPENDENTLY |
|---|
| VERIFIED. ALL WORK AT INTERIOR U.N.O. |
| PLA | YGROUND |
|---|
| EXISTI BRI | |||||||||||||||||||||
| EXISTI BRI | NG ONE STORY CK BUILDING | ||||||||||||||||||||
| 4'-1" | U U P P | ||||||||||||||||||||
| (1) NEW 48"x 49" CONDENSING UNIT TO BE REPLACED IN-KIND. REMAINING EXISTING IN-USE EQUIPMENT TO REMAIN, AND ALL | |||||||||||||||||||||
| ABANDONED EQUIPMENT TO BE REMOVED. |
Contact Schedule
Note: Any questions concerning the Construction Documents shall first be directed to the Architect. The Architect will
A1 Cover Sheet forward questions as appropriate to the consulting engineers.
Drawing Index
Project Contact Schedule
Building Owner: Architect: Plan Review & Inspection:
Code Conformance Information
Site Location Map
HACP Fukui Architects, PC City of Pittsburgh
SITE PLAN
A2 Abbreviations And Accessibility Diagrams 412 Boulevard of the Alies 205 Ross Street Departments of Permits, Licenses
Abbreviations and Materials
Pittsburgh,PA,15219 Pittsburgh, PA 15219 and Inspections
A3 Demolition Plan and RCP
Demolition Plan Legend ph: 412.281.6001 200 Ross Street
First Floor Demolition Plan fx: 412.281.6002 3rd floor, room 320
Roof Demolition Plan
First Floor Reflected Ceiling Demolition Plan emma@farpc.com Pittsburgh, PA 15205
A4 Floor Plan and RCP contact: Emma Cline, AIA ph: 412.255.2175
General Floor Plan
First Floor Reflected Ceiling Plan
Reflected Ceiling Plan Legend
Floor Plan Legend
A5 Specifications
10-08 Outline Specifications
A6 Specifications
10-08 Outline Specifications
M000 Mechanical Notes
HACP Homewood_Mechanical Set
M100 Mechanical Plan
HACP Homewood_Mechanical Set
M200 Mechanical Details
HACP Homewood_Mechanical Set
14.84'
M300 Mechanical Schedules
HACP Homewood_Mechanical Set
Code Conformance Information
Applicable Codes
General: 2021 International Existing Building Code
Accessibility: ANSI/ICC A117.1 2009
Energy: 2021 International Energy Conservation Code
Electrical: 2020 NEC (NFPA 70)
Fire: 2021 International Fire Code
Fuel Gas: 2021 International Fuel Gas Code
Mechanical: 2021 International Mechanical Code
Plumbing: 2022 Allegheny County Health Department Plumbing Code 1
4
Fire Alarm: 2021 NFPA 72 4
'
Sprinkler: 2021 NFPA 13
U U General Building / Project Information P P
Compliance Method: Work Area
Classification of Work: Level 2 Alteration
Occupancy Group: A-3, B, E. (Only A-3 in scope)
non-separated occupancies (A-3 most restrictive)
Stories: 1 Story
Bulding Height: +/- 25'-0"
Building Gross Area: 4,745 SF
Work Area: 37.5 SF
Construction Type: VB
Sprinklers: NFPA 13
Fire Alarm: NFPA 72
74.19'
UP
"0-'031
LOT INFORMATION OBTAINED
FROM ALLEGHENY COUNTY GIS
MAP AND NOT INDEPENDENTLY
VERIFIED. ALL WORK AT INTERIOR U.N.O.
ALBERTICE STREET
ASPHALT
PARKING
PLAYGROUND
LOT
M
O
H
L
E
R
S
T
R
E
E
T
4'-1"
ADJACENT
BUILDING
40' 40' 40' 80'
MONTICELLO STREET
"0-'4
Homewood North - Community Center
Fukui Architects Pc
2 0 5 R o s s S t r e e t
Pittsburgh, Pennsylvania 15219
HVAC Work Replacement
ph 412.281.6001 fx 412.281.6002
(C) 2 0 2 6 F u k u i A r c h i t e c t s , P c
Mechanical Unit replacement in existing community center. No changes to
PROJECT LOCATION
exisitng areas, structure, fire protection or egress.
10 Albertice St.,
seal
Pittsburgh, PA 15208
Drawing Index
general notes
Site Location Map
1 11.. Any conflicts in the drawings or between new and
existing construction shall be referred to the Architect.
22.. Contractor shall verify all dimensions and existing
conditions in the field and shall advise Fukui Architects,
Pc of any discrepancies between, additions to, deletions
from, or alterations to any and all conditions prior to
proceeding with any phase of work. Do not scale
drawings.
33.. All work shall be installed in accordance with applicable
codes and regulations.
44.. Contractor shall be responsible for the patching,
repairing, and preparations of all existing floor, wall, and
ceiling surfaces as required to receive scheduled finishes.
55.. All items shown on drawings are finished construction
assemblies. Contractor shall provide and install all
material required for finished assemblies.
66.. All reports, plans, specifications, computer files, field
data, notices, and other documents and instruments
prepared by the Architect as instruments of service shall
remain the property of the Architect. The Architect shall
retain all common law statutory, and other reserved
rights, including the copyright thereto.
revisions
1 ISSUE FOR CLIENT REVIEW 02.28.2025
2 ISSUE FOR BID AND PERMIT 09.24.2025
3 ISSUE FOR ZDR REVISIONS 01.07.2026
4 IFC & IFB 05.19.2026
IMAGE OF EXISTING project title
ROOF EQUIPMENT
Owner:
HACP
EXISTING ONE STORY
412 Boulevard of the Alies
BRICK BUILDING
Pittsburgh,PA,15219
Project Location:
Homewood North - Community Center
HVAC Work Replacement
10 Albertice St.
Pittsburgh, PA 15208
drawing title
Cover Sheet Drawing Index, Code
Conformance Information, Project
NOTE: SCOPE OF WORK LIMITED TO REPLACING EXISTING MECHANICAL EQUIPMENT, REMOVAL OF ABANDONED
EQUIPMENT, CREATION OF A NEW OPENING IN THE CLG SYSTEM FOR FUTURE RTU SERVICING, AND REMOVAL OF Contact Schedule, Site Location Map,
EXISITNG TEMPORARY FURNACE AND ENCLOSURE. TEMPORARY REMOVAL OF EXISTING SMOKE/CARBON MONOXIDE SITE PLAN
DETECTORS AND LIGHTING FIXTURES TO CREATE NEW OPENING FOR FUTURE RTU SERVICING. TEMPORARY REMOVAL
OF EXISTING FIRE ALARM DEVICES AND LIGHTING FIXTURES TO CREATE NEW OPENING FOR FUTURE RTU SERVICING.
TEMPORARY RELOCATION OF SPRINKLER HEADS TO REMAIN ACTIVE DURING CONSTRUCTION. REINSTALLATION OF
(1) NEW 48"x 49" CONDENSING
SUSPENDED GRID CEILING SYSTEM, WTIH NEW ACOUSTIC TILES.
UNIT TO BE REPLACED IN-KIND.
REMAINING EXISTING IN-USE
scale
SShheeeett NNoo..
EQUIPMENT TO REMAIN, AND ALL As Noted
ABANDONED EQUIPMENT TO BE
date
REMOVED.
05.19.2026
A1
no. of.
N
1 10
SITE PLAN
2 Project #2441
SCALE: 1/16" = 1'-0"
| Materials Legend Abbreviations Symbols NOT ALL SYMBOLS USED Fukui Architects Pc NOT ALL MATERIALS USED A.F.F. Above Finish Floor EQUIP. Equipment MISC. Miscellaneous T.O. FINISH FLOOR ELEVATION HEIGHT 2 0 5 R o s s S t r e e t A.P. Access Panel E.F. Exhaust Fan ELEV: 0'-0" EARTH ACOUST. Acoustical EXIST. Existing N.I.C. Not In Contract Pittsburgh, Pennsylvania 15219 A.C.T. Acoustical Ceiling Tile EXP. Expansion N.T.S. Not To Scale PLAN ADH. Adhesive E.J. Expansion Joint COMPACTED STONE FILL ADJUST. Adjustable ESH Exterior Sheathing O.C. On Center NORTH ph 412.281.6001 fx 412.281.6002 A/C Air Conditioning EXIST. Existing OPP. Opposite NORTH ARROW ALT. Alteration EXP. Exposed O.H. Overhead CONCRETE ALTN. Alternate EXT. Exterior ALUM. Aluminum E.I.F.S. Exterior Insulation & Finish System PR. Pair 0 4' 8' 16' (C) 2 0 2 6 F u k u i A r c h i t e c t s , P c GRAPHIC SCALE A.O.R. Area of Refuge PLAS. Plaster STEEL APPROX. Approximate F.R.P. Fiberglass Reinforced Polyester PLAM Plastic Laminate ARCH. Architectural F.F. Finish Floor P.C. Plumbing Contractor ASB. Asbestos FIN.FLR. Finish Floor PLYWD. Plywood F.A.C.P. Fire Alarm Control Panel POLY. Polyethylene RIGID INSULATION ASPH. Asphalt 1 AUTO. Automatic F.E. Fire Extinguisher P.V.C. Polyvinyl Chloride A-000 BUILDING/ WALL SECTION MARKER AVG. Average FLR. Floor PRE-FAB. Prefabricated F.D. Floor Drain BLOCKING BLK. Block FTG. Footing RE. Refer To 1 ELEVATION MARKER BD. Board REF. Refrigerator A1 BOT Bottom GA. Gauge R.C.P. Reinforced Concrete Pipe 1 BATT INSULATION BLDG Building G.C. General Contractor REINF. Reinforcement INTERIOR ELEVATION MARKER G.F.I. Ground Fault Interrupter RD. Roof Drain 4 A-000 2 C.I.P. Cast In Place GYP. Gypsum RM. Room GYPSUM WALL BOARD C.B. Catch Basin G.W.B. Gypsum Wall Board 3 CEM. Cement GSH Gypsum Sheathing S.A.T. Suspended Acoustical Tile seal CER. Ceramic SCHED. Schedule WOOD CG Corner Guard H/C Handicap SHT. Sheet C.M.T. Ceramic Mosaic Tile H.V.A.C. Heating, Ventilation & SIM. Similar DETAIL REFERENCE 1 C.W.T. Ceramic Wall Tile HT Height S.C. Solid Core A1 PLYWOOD SHEATHING C.O. Cleanout HC Hollow Core SPECS. Specifications C L Center Line H.M. Hollow Metal SQ. Square HORIZ. Horizontal S.F. Square Foot CLO. Closet HR. Hour S.S. Stainless Steel SPRAY FOAM INSULATION C.W. Cold Water H.W. Hot Water STL. Steel XXX-X FINISH MATERIAL DESIGNATOR CLG. Ceiling H/S Horn/Strobes STOR. Storage COL. Column STRUCT. Structural CONC. Concrete C.M.U. Concrete Masonry Unit IN. Inch TEL. Telephone CONT. Continuous I.M. Insulated Metal THK. Thick CORR. Corridor INSUL. Insulation or Insulated T.B.D. To Be Determined C.M.P. Corrigated Metal Pipe INT. Interior T&G Tongue & Groove CRS. Courses INV. Invert T.O. Top Of ISO. Isolation T.G. Top Of Grade DIA. Diameter DET Detail JAN. Janitor's Closet T.O.S. Top Of Steel general notes DGL Dens Glass Gold J.T. Joint TYP. Typical DR. Door UNFIN. Unfinished 11.. Any conflicts in the drawings or between new and DN. Down LAM. Laminate U.N.O. Unless Noted Otherwise existing construction shall be referred to the Architect. D.S. Downspout LAV. Lavatory 22.. Contractor shall verify all dimensions and existing DWG. Drawing LG. Long V.B. Vapor Barrier conditions in the field and shall advise Fukui Architects, D.F. Drinking Fountain L.F. Light Fixtures VERT. Vertical Pc of any discrepancies between, additions to, deletions VEST. Vestibule D.I.P. Ductile Iron Pipe from, or alterations to any and all conditions prior to M.D.F. Medium Density Fiberboard V.C.T. Vinyl Composition Tile proceeding with any phase of work. Do not scale M.D.H. Magnetic Door Holder EA. Each W.H. Water Heater drawings. M.H. Manhole E.W. Each Way W.W.F. Welded Wire Fabric 33.. All work shall be installed in accordance with applicable MFGR. Manufacturer ELEC. Electrical WIN. Window codes and regulations. MAX. Maximum E.C. Electrical Contractor W/ With MECH. Mechanical 44.. Contractor shall be responsible for the patching, EL. Elevation W/O Without MET. Metal repairing, and preparations of all existing floor, wall, and ELEV. Elevation WD. Wood MIN. Minimum ceiling surfaces as required to receive scheduled finishes. 55.. All items shown on drawings are finished construction assemblies. Contractor shall provide and install all material required for finished assemblies. 66.. All reports, plans, specifications, computer files, field data, notices, and other documents and instruments prepared by the Architect as instruments of service shall remain the property of the Architect. The Architect shall retain all common law statutory, and other reserved rights, including the copyright thereto. revisions 1 ISSUE FOR CLIENT REVIEW 02.28.2025 2 ISSUE FOR BID AND PERMIT 09.24.2025 3 ISSUE FOR ZDR REVISIONS 01.07.2026 4 IFC & IFB 05.19.2026 project title Owner: HACP 412 Boulevard of the Alies Pittsburgh,PA,15219 Project Location: Homewood North - Community Center HVAC Work Replacement 10 Albertice St. Pittsburgh, PA 15208 drawing title Abbreviations And Accessibility Diagrams Abbreviations and Materials scale SShheeeett NNoo.. As Noted date 05.19.2026 A2 no. of. 2 10 Project #2441 | |||
|---|---|---|---|
| scale As Noted | SShheeeett NNoo.. A2 Project #2441 | ||
| date 05.19.2026 | |||
| no. 2 | of. 10 | ||
| Abbreviations | ||
|---|---|---|
| A.F.F. Above Finish Floor A.P. Access Panel ACOUST. Acoustical A.C.T. Acoustical Ceiling Tile ADH. Adhesive ADJUST. Adjustable A/C Air Conditioning ALT. Alteration ALTN. Alternate ALUM. Aluminum A.O.R. Area of Refuge APPROX. Approximate ARCH. Architectural ASB. Asbestos ASPH. Asphalt AUTO. Automatic AVG. Average BLK. Block BD. Board BOT Bottom BLDG Building C.I.P. Cast In Place C.B. Catch Basin CEM. Cement CER. Ceramic CG Corner Guard C.M.T. Ceramic Mosaic Tile C.W.T. Ceramic Wall Tile C.O. Cleanout C L Center Line CLO. Closet C.W. Cold Water CLG. Ceiling COL. Column CONC. Concrete C.M.U. Concrete Masonry Unit CONT. Continuous CORR. Corridor C.M.P. Corrigated Metal Pipe CRS. Courses DIA. Diameter DET Detail DGL Dens Glass Gold DR. Door DN. Down D.S. Downspout DWG. Drawing D.F. Drinking Fountain D.I.P. Ductile Iron Pipe EA. Each E.W. Each Way ELEC. Electrical E.C. Electrical Contractor EL. Elevation ELEV. Elevation | EQUIP. Equipment E.F. Exhaust Fan EXIST. Existing EXP. Expansion E.J. Expansion Joint ESH Exterior Sheathing EXIST. Existing EXP. Exposed EXT. Exterior E.I.F.S. Exterior Insulation & Finish System F.R.P. Fiberglass Reinforced Polyester F.F. Finish Floor FIN.FLR. Finish Floor F.A.C.P. Fire Alarm Control Panel F.E. Fire Extinguisher FLR. Floor F.D. Floor Drain FTG. Footing GA. Gauge G.C. General Contractor G.F.I. Ground Fault Interrupter GYP. Gypsum G.W.B. Gypsum Wall Board GSH Gypsum Sheathing H/C Handicap H.V.A.C. Heating, Ventilation & HT Height HC Hollow Core H.M. Hollow Metal HORIZ. Horizontal HR. Hour H.W. Hot Water H/S Horn/Strobes IN. Inch I.M. Insulated Metal INSUL. Insulation or Insulated INT. Interior INV. Invert ISO. Isolation JAN. Janitor's Closet J.T. Joint LAM. Laminate LAV. Lavatory LG. Long L.F. Light Fixtures M.D.F. Medium Density Fiberboard M.D.H. Magnetic Door Holder M.H. Manhole MFGR. Manufacturer MAX. Maximum MECH. Mechanical MET. Metal MIN. Minimum | MISC. Miscellaneous N.I.C. Not In Contract N.T.S. Not To Scale O.C. On Center OPP. Opposite O.H. Overhead PR. Pair PLAS. Plaster PLAM Plastic Laminate P.C. Plumbing Contractor PLYWD. Plywood POLY. Polyethylene P.V.C. Polyvinyl Chloride PRE-FAB. Prefabricated RE. Refer To REF. Refrigerator R.C.P. Reinforced Concrete Pipe REINF. Reinforcement RD. Roof Drain RM. Room S.A.T. Suspended Acoustical Tile SCHED. Schedule SHT. Sheet SIM. Similar S.C. Solid Core SPECS. Specifications SQ. Square S.F. Square Foot S.S. Stainless Steel STL. Steel STOR. Storage STRUCT. Structural TEL. Telephone THK. Thick T.B.D. To Be Determined T&G Tongue & Groove T.O. Top Of T.G. Top Of Grade T.O.S. Top Of Steel TYP. Typical UNFIN. Unfinished U.N.O. Unless Noted Otherwise V.B. Vapor Barrier VERT. Vertical VEST. Vestibule V.C.T. Vinyl Composition Tile W.H. Water Heater W.W.F. Welded Wire Fabric WIN. Window W/ With W/O Without WD. Wood |
Materials Legend Abbreviations Symbols NOT ALL SYMBOLS USED Fukui Architects Pc
NOT ALL MATERIALS USED
A.F.F. Above Finish Floor EQUIP. Equipment MISC. Miscellaneous T.O. FINISH FLOOR ELEVATION HEIGHT 2 0 5 R o s s S t r e e t
A.P. Access Panel E.F. Exhaust Fan
ELEV: 0'-0"
EARTH ACOUST. Acoustical EXIST. Existing N.I.C. Not In Contract
Pittsburgh, Pennsylvania 15219
A.C.T. Acoustical Ceiling Tile EXP. Expansion N.T.S. Not To Scale
PLAN
ADH. Adhesive E.J. Expansion Joint
COMPACTED STONE FILL ADJUST. Adjustable ESH Exterior Sheathing O.C. On Center NORTH ph 412.281.6001 fx 412.281.6002
A/C Air Conditioning EXIST. Existing OPP. Opposite
NORTH ARROW
ALT. Alteration EXP. Exposed O.H. Overhead
CONCRETE ALTN. Alternate EXT. Exterior
ALUM. Aluminum E.I.F.S. Exterior Insulation & Finish System PR. Pair 0 4' 8' 16' (C) 2 0 2 6 F u k u i A r c h i t e c t s , P c
GRAPHIC SCALE
A.O.R. Area of Refuge PLAS. Plaster
STEEL APPROX. Approximate F.R.P. Fiberglass Reinforced Polyester PLAM Plastic Laminate
ARCH. Architectural F.F. Finish Floor P.C. Plumbing Contractor
ASB. Asbestos FIN.FLR. Finish Floor PLYWD. Plywood
F.A.C.P. Fire Alarm Control Panel POLY. Polyethylene
RIGID INSULATION ASPH. Asphalt 1
AUTO. Automatic F.E. Fire Extinguisher P.V.C. Polyvinyl Chloride A-000 BUILDING/ WALL SECTION MARKER
AVG. Average FLR. Floor PRE-FAB. Prefabricated
F.D. Floor Drain
BLOCKING
BLK. Block FTG. Footing RE. Refer To 1 ELEVATION MARKER
BD. Board REF. Refrigerator A1
BOT Bottom GA. Gauge R.C.P. Reinforced Concrete Pipe 1
BATT INSULATION
BLDG Building G.C. General Contractor REINF. Reinforcement
INTERIOR ELEVATION MARKER
G.F.I. Ground Fault Interrupter RD. Roof Drain 4 A-000 2
C.I.P. Cast In Place GYP. Gypsum RM. Room
GYPSUM WALL BOARD C.B. Catch Basin G.W.B. Gypsum Wall Board 3
CEM. Cement GSH Gypsum Sheathing S.A.T. Suspended Acoustical Tile seal
CER. Ceramic SCHED. Schedule
WOOD CG Corner Guard H/C Handicap SHT. Sheet
C.M.T. Ceramic Mosaic Tile H.V.A.C. Heating, Ventilation & SIM. Similar DETAIL REFERENCE
1
C.W.T. Ceramic Wall Tile HT Height S.C. Solid Core A1
PLYWOOD SHEATHING C.O. Cleanout HC Hollow Core SPECS. Specifications
C L Center Line H.M. Hollow Metal SQ. Square
HORIZ. Horizontal S.F. Square Foot
CLO. Closet
HR. Hour S.S. Stainless Steel
SPRAY FOAM INSULATION C.W. Cold Water H.W. Hot Water STL. Steel XXX-X FINISH MATERIAL DESIGNATOR
CLG. Ceiling
H/S Horn/Strobes STOR. Storage
COL. Column
STRUCT. Structural
CONC. Concrete
C.M.U. Concrete Masonry Unit IN. Inch TEL. Telephone
CONT. Continuous I.M. Insulated Metal THK. Thick
CORR. Corridor INSUL. Insulation or Insulated
T.B.D. To Be Determined
C.M.P. Corrigated Metal Pipe INT. Interior
T&G Tongue & Groove
CRS. Courses INV. Invert
T.O. Top Of
ISO. Isolation
T.G. Top Of Grade
DIA. Diameter
DET Detail JAN. Janitor's Closet T.O.S. Top Of Steel general notes
DGL Dens Glass Gold J.T. Joint TYP. Typical
DR. Door UNFIN. Unfinished 11.. Any conflicts in the drawings or between new and
DN. Down LAM. Laminate U.N.O. Unless Noted Otherwise existing construction shall be referred to the Architect.
D.S. Downspout LAV. Lavatory 22.. Contractor shall verify all dimensions and existing
DWG. Drawing LG. Long V.B. Vapor Barrier conditions in the field and shall advise Fukui Architects,
D.F. Drinking Fountain L.F. Light Fixtures VERT. Vertical Pc of any discrepancies between, additions to, deletions
VEST. Vestibule
D.I.P. Ductile Iron Pipe from, or alterations to any and all conditions prior to
M.D.F. Medium Density Fiberboard V.C.T. Vinyl Composition Tile proceeding with any phase of work. Do not scale
M.D.H. Magnetic Door Holder
EA. Each W.H. Water Heater drawings.
M.H. Manhole
E.W. Each Way W.W.F. Welded Wire Fabric 33.. All work shall be installed in accordance with applicable
MFGR. Manufacturer
ELEC. Electrical WIN. Window codes and regulations.
MAX. Maximum
E.C. Electrical Contractor W/ With
MECH. Mechanical 44.. Contractor shall be responsible for the patching,
EL. Elevation W/O Without
MET. Metal repairing, and preparations of all existing floor, wall, and
ELEV. Elevation WD. Wood
MIN. Minimum ceiling surfaces as required to receive scheduled finishes.
55.. All items shown on drawings are finished construction
assemblies. Contractor shall provide and install all
material required for finished assemblies.
66.. All reports, plans, specifications, computer files, field
data, notices, and other documents and instruments
prepared by the Architect as instruments of service shall
remain the property of the Architect. The Architect shall
retain all common law statutory, and other reserved
rights, including the copyright thereto.
revisions
1 ISSUE FOR CLIENT REVIEW 02.28.2025
2 ISSUE FOR BID AND PERMIT 09.24.2025
3 ISSUE FOR ZDR REVISIONS 01.07.2026
4 IFC & IFB 05.19.2026
project title
Owner:
HACP
412 Boulevard of the Alies
Pittsburgh,PA,15219
Project Location:
Homewood North - Community Center
HVAC Work Replacement
10 Albertice St.
Pittsburgh, PA 15208
drawing title
Abbreviations And Accessibility
Diagrams Abbreviations and Materials
scale
SShheeeett NNoo..
As Noted
date
05.19.2026
A2
no. of.
2 10
Project #2441
| DEMOLITION PLAN LEGEND GENERAL DEMOLITION NOTES Fukui Architects Pc 1. CONTRACTORS SHALL MAINTAIN EXISTING BUILDING IN A EXISTING WALL TO BE DEMOLISHED WEATHERTIGHT CONDITION. FOR ALL AREAS TO REMAIN 2 0 5 R o s s S t r e e t OUTSIDE OF WORK AREA: TAKE CARE TO PROTECT FROM EXISTING WALL TO REMAIN DUST, DIRT, AND DAMAGE. PROVIDE CARPET COVERINGS AND Pittsburgh, Pennsylvania 15219 WALK OFF MATS; DO NOT DISTURB ELECTRICAL, PLUMBING, AND HVAC SERVING THESE AREAS UNLESS REQUIRED TO DEMOLISH EXISTING FLOORING OR CEILING PERFORM CONTRACTED WORK. THE GC IS TO COORDINATE ph 412.281.6001 fx 412.281.6002 ANY NECESSARY SHUT DOWNS WITH OWNER. IN HATCHED AREA. 2. DEMOLITION WASTE TO BE REMOVED FROM SITE BY DEMOLITION CONTRACTOR AND DISPOSED OF PROPERLY. (C) 2 0 2 6 F u k u i A r c h i t e c t s , P c 3. REPAIR OR REPLACE ANY ITEMS TO REMAIN THAT ARE DAMAGED DURING CONSTRUCTION TO APPEAR AS NEW. 4. COORDINATE MEPFP REMOVALS WITH MEPFP DRAWINGS. 5. ITEMS NOT LABLED OR KEYED FOR REMOVAL / DEMOLITION ARE EXISTING AND INTENDED TO REMAIN. PROTECT THESE ITEMS FROM DAMAGE. 6. PROTECT EXISTING HVAC UNITS AND DUCTWORK FROM DUST GC TO TAKE CARE TO AVOID THE DAYCARE DURING CONSTRUCTION. AFFECTING THE EXISTING FIRE 101 ALARM SYSTEM. IF NOT POSSIBLE, 7. COORDINATE WITH OWNER ON EXACT DEMOLITION INTENT GC TO CUT, CAP, AND KEEP ACTIVE BEFORE DEMOLITION. .O OFFICE ANY EXISTING TO REMAIN L 102 ELECTRICAL FIRE ALARM SYSTEMS C TO BE TEMPORARILY REMOVED. seal OFFICE WOMEN'S 105 UNISEX UNISEX MEN'S 107 101B 101A 106 RECREATION ROOM HALLWAY 109 100 1'-3 3/4" OFFICE CLO. CLO. general notes 6'-0" 103 OFFICE 11.. Any conflicts in the drawings or between new and 104 existing construction shall be referred to the Architect. "0 22.. Contractor shall verify all dimensions and existing -'6 conditions in the field and shall advise Fukui Architects, Pc of any discrepancies between, additions to, deletions from, or alterations to any and all conditions prior to .O proceeding with any phase of work. Do not scale NOTE: REFER TO MECHANICAL L C drawings. DRAWINGS FOR MORE INFORMATION. "2 33.. All work shall be installed in accordance with applicable /1 codes and regulations. KITCHEN 8 108 -'0 1 44.. Contractor shall be responsible for the patching, repairing, and preparations of all existing floor, wall, and ceiling surfaces as required to receive scheduled finishes. REMOVE EXISTING ACOUSTIC 55.. All items shown on drawings are finished construction CEILING TILE IN RECREATION ROOM assemblies. Contractor shall provide and install all 109. TEMPORARILY REMOVE LIGHTS, material required for finished assemblies. DEMOLISH 6X6 (36SF) OF GYP. BELOW HVAC VENTS, SMOKE/CARBON STRUCTURE, PLYWOOD CEILING MONOXIDE DETECTORS AND 66.. All reports, plans, specifications, computer files, field SUBSTRATE AND FRAMING PER ROOF SUSPENDED CEILING GRID IN AREA data, notices, and other documents and instruments DEMOLITION PLAN. GC TO TAKE CARE HIGHLIGHTED. KEEP CEILING GRID prepared by the Architect as instruments of service shall NOT TO ALTER EXISTING STRUCTURE, TEMPORARILY RE- SYSTEM ON SITE AND IN GOOD remain the property of the Architect. The Architect shall OR OTHER MEP ELEMENTS. PIPE FIRE CONDITION. RE-INSTALLATION OF retain all common law statutory, and other reserved PLYWOOD REMOVAL IS TO PROVIDE SPRINKLER LINE EXISTING CEILING GRID, LIGHTS, rights, including the copyright thereto. SPACE TO REMOVE EXISTING HVAC TO KEEP HEAD VENTS AND SMOKE/CARBON revisions UNIT IN ATTIC AND INSTALL NEW. ACTIVE IN CUT, CAP AND MONOXOIDE DETECTORS TO BE BRACE AND SHORE CUT FRAMING AS RECREATION KEEP EXISTING TO COMPLETED AFTER CONSTRUCTION 1 ISSUE FOR CLIENT REVIEW 02.28.2025 NECESSARY FOR NEW FRAMING PER ROOM TO CREATE REMAIN COMPLETION. INSTALLATION OF NEW PLANS. GC TO VERIFY FINAL NEW OPENING FOR ELECTRICAL AND ACOUSTIC CEILING TILE TO BE 2 ISSUE FOR BID AND PERMIT 09.24.2025 LOCATION OF OPENING WITH OWNER FUTURE RTU FIRE ALARM COMPLETED AFTER CONSTRUCTION AND ARCHITECT. INSTALLATION. SYSTEMS ACTIVE COMPLETION. 1,250 SF TOTAL. 3 ISSUE FOR ZDR REVISIONS 01.07.2026 4 IFC & IFB 05.19.2026 First Floor Reflected Ceiling Demolition Plan 3 SCALE: 1/8" = 1'-0" EXISTING ROOF RAFTERS AND STRUCTURAL BEAMS AND COLUMNS TO REMAIN. LENNOX CBH17 AIR HANDLER project title AND ALL ASSOCIATED DAMAGED DUCTWORK TO BE REMOVED. Owner: HACP DAYCARE 412 Boulevard of the Alies 101 Pittsburgh,PA,15219 .O OFFICE L 102 C Project Location: Homewood North - Community Center HVAC Work Replacement 10 Albertice St. Pittsburgh, PA 15208 OFFICE WOMEN'S 105 UNISEX UNISEX MEN'S 107 101B 101A 106 RECREATION ROOM drawing title HALLWAY 109 100 Demolition Plan and RCP Demolition Plan Legend, First Floor Demolition NOTE: REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. OFFICE CLO. CLO. Plan, Roof Demolition Plan, First 103 OFFICE Floor Reflected Ceiling Demolition 104 Plan EXISTING FURNACE AND ENCLOSURE TO BE REMOVED. REMOVE ANY ABANDONED UTILITIES BACK .O TO SOURCE AND FINISH L WALLS AND FLOOR AS 6'X6' OPENING IN PLYWOOD. GC TO NOTE: C NECESSARY. DETERMINE FINAL OPENING PLACEMENT TO REFER TO MECHANICAL DRAWINGS DISTRUB NO STRUCTURAL ELEMENTS. GC scale TO CUT INTO CEILING FRAMING BELOW AND FOR MORE INFORMATION. KITCHEN As Noted SShheeeett NNoo.. BRACE AND SHORE ACCORDINGLY TO 108 CREATE NEW ACCESS HATCH. PREFER TO ROOF PLAN FOR MORE DETAILS. date NOTE: WD F 05.19.2026 REMOVE ANY ABANDONED UTILITIES A3 BACK TO SOURCE. no. of. PLAN 3 10 NORTH Roof Demolition Plan First Floor Demolition Plan Project #2441 2 1 SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0" | |||
|---|---|---|---|
| scale As Noted | SShheeeett NNoo.. A3 Project #2441 | ||
| date 05.19.2026 no. of. | |||
| 3 | 10 | ||
| .O L C | OFFICE 102 | ||||||||||||||||||||||||||||||
| OFFICE 105 | |||||||||||||||||||||||||||||||
| UNISEX 101B | UNISEX 101A | ||||||||||||||||||||||||||||||
| OFFICE 103 | REC | RE | ATIO | N ROOM | |||||||||||||||||||||||||||
| 109 | |||||||||||||||||||||||||||||||
| 1'-3 3/4 CLO. CLO. 6'- | " | ||||||||||||||||||||||||||||||
| 0" | |||||||||||||||||||||||||||||||
| "0 -'6 | |||||||||||||||||||||||||||||||
| .O L C | |||||||||||||||||||||||||||||||
| KITC 1 | HEN 08 | "2 /1 8 -'0 | |||||||||||||||||||||||||||||
| 1 | |||||||||||||||||||||||||||||||
| WOMEN'S 107 | ||
|---|---|---|
| CLO. |
|---|
| UNISEX UNISEX 101B 101A | ||
| RECREATION ROOM 109 . EXISTING FURNACE AND ENCLOSURE TO BE REMOVED. REMOVE ANY ABANDONED UTILITIES BACK TO SOURCE AND FINISH WALLS AND FLOOR AS NECESSARY. F | ||||||||
|---|---|---|---|---|---|---|---|---|
| OFFICE 105 | ||||||||
| CLO. CLO | ||||||||
| .O L C KITCHEN 108 WD | ||||||||
| WD | ||||||||
DEMOLITION PLAN LEGEND GENERAL DEMOLITION NOTES
Fukui Architects Pc
1. CONTRACTORS SHALL MAINTAIN EXISTING BUILDING IN A
EXISTING WALL TO BE DEMOLISHED WEATHERTIGHT CONDITION. FOR ALL AREAS TO REMAIN
2 0 5 R o s s S t r e e t
OUTSIDE OF WORK AREA: TAKE CARE TO PROTECT FROM
EXISTING WALL TO REMAIN DUST, DIRT, AND DAMAGE. PROVIDE CARPET COVERINGS AND
Pittsburgh, Pennsylvania 15219
WALK OFF MATS; DO NOT DISTURB ELECTRICAL, PLUMBING,
AND HVAC SERVING THESE AREAS UNLESS REQUIRED TO
DEMOLISH EXISTING FLOORING OR CEILING PERFORM CONTRACTED WORK. THE GC IS TO COORDINATE ph 412.281.6001 fx 412.281.6002
ANY NECESSARY SHUT DOWNS WITH OWNER.
IN HATCHED AREA.
2. DEMOLITION WASTE TO BE REMOVED FROM SITE BY
DEMOLITION CONTRACTOR AND DISPOSED OF PROPERLY.
(C) 2 0 2 6 F u k u i A r c h i t e c t s , P c
3. REPAIR OR REPLACE ANY ITEMS TO REMAIN THAT ARE
DAMAGED DURING CONSTRUCTION TO APPEAR AS NEW.
4. COORDINATE MEPFP REMOVALS WITH MEPFP DRAWINGS.
5. ITEMS NOT LABLED OR KEYED FOR REMOVAL / DEMOLITION
ARE EXISTING AND INTENDED TO REMAIN. PROTECT THESE
ITEMS FROM DAMAGE.
6. PROTECT EXISTING HVAC UNITS AND DUCTWORK FROM DUST GC TO TAKE CARE TO AVOID THE
DAYCARE
DURING CONSTRUCTION. AFFECTING THE EXISTING FIRE
101
ALARM SYSTEM. IF NOT POSSIBLE,
7. COORDINATE WITH OWNER ON EXACT DEMOLITION INTENT GC TO CUT, CAP, AND KEEP ACTIVE
BEFORE DEMOLITION. .O OFFICE ANY EXISTING TO REMAIN
L 102 ELECTRICAL FIRE ALARM SYSTEMS
C
TO BE TEMPORARILY REMOVED.
seal
OFFICE
WOMEN'S 105
UNISEX UNISEX MEN'S
107
101B 101A 106
RECREATION ROOM
HALLWAY 109
100
1'-3 3/4"
OFFICE CLO. CLO. general notes
6'-0"
103
OFFICE 11.. Any conflicts in the drawings or between new and
104 existing construction shall be referred to the Architect.
"0 22.. Contractor shall verify all dimensions and existing
-'6
conditions in the field and shall advise Fukui Architects,
Pc of any discrepancies between, additions to, deletions
from, or alterations to any and all conditions prior to
.O
proceeding with any phase of work. Do not scale
NOTE: REFER TO MECHANICAL L
C drawings.
DRAWINGS FOR MORE INFORMATION.
"2 33.. All work shall be installed in accordance with applicable
/1 codes and regulations.
KITCHEN 8
108 -'0
1 44.. Contractor shall be responsible for the patching,
repairing, and preparations of all existing floor, wall, and
ceiling surfaces as required to receive scheduled finishes.
REMOVE EXISTING ACOUSTIC 55.. All items shown on drawings are finished construction
CEILING TILE IN RECREATION ROOM assemblies. Contractor shall provide and install all
109. TEMPORARILY REMOVE LIGHTS,
material required for finished assemblies.
DEMOLISH 6X6 (36SF) OF GYP. BELOW HVAC VENTS, SMOKE/CARBON
STRUCTURE, PLYWOOD CEILING MONOXIDE DETECTORS AND 66.. All reports, plans, specifications, computer files, field
SUBSTRATE AND FRAMING PER ROOF SUSPENDED CEILING GRID IN AREA data, notices, and other documents and instruments
DEMOLITION PLAN. GC TO TAKE CARE HIGHLIGHTED. KEEP CEILING GRID prepared by the Architect as instruments of service shall
NOT TO ALTER EXISTING STRUCTURE, TEMPORARILY RE- SYSTEM ON SITE AND IN GOOD remain the property of the Architect. The Architect shall
OR OTHER MEP ELEMENTS. PIPE FIRE CONDITION. RE-INSTALLATION OF retain all common law statutory, and other reserved
PLYWOOD REMOVAL IS TO PROVIDE SPRINKLER LINE EXISTING CEILING GRID, LIGHTS,
rights, including the copyright thereto.
SPACE TO REMOVE EXISTING HVAC TO KEEP HEAD VENTS AND SMOKE/CARBON revisions
UNIT IN ATTIC AND INSTALL NEW. ACTIVE IN CUT, CAP AND MONOXOIDE DETECTORS TO BE
BRACE AND SHORE CUT FRAMING AS RECREATION KEEP EXISTING TO COMPLETED AFTER CONSTRUCTION
1 ISSUE FOR CLIENT REVIEW 02.28.2025
NECESSARY FOR NEW FRAMING PER ROOM TO CREATE REMAIN COMPLETION. INSTALLATION OF NEW
PLANS. GC TO VERIFY FINAL NEW OPENING FOR ELECTRICAL AND ACOUSTIC CEILING TILE TO BE
2 ISSUE FOR BID AND PERMIT 09.24.2025
LOCATION OF OPENING WITH OWNER FUTURE RTU FIRE ALARM COMPLETED AFTER CONSTRUCTION
AND ARCHITECT. INSTALLATION. SYSTEMS ACTIVE COMPLETION. 1,250 SF TOTAL.
3 ISSUE FOR ZDR REVISIONS 01.07.2026
4 IFC & IFB 05.19.2026
First Floor Reflected Ceiling Demolition Plan
3
SCALE: 1/8" = 1'-0"
EXISTING ROOF RAFTERS
AND STRUCTURAL BEAMS
AND COLUMNS TO REMAIN.
LENNOX CBH17 AIR HANDLER project title
AND ALL ASSOCIATED DAMAGED
DUCTWORK TO BE REMOVED.
Owner:
HACP
DAYCARE 412 Boulevard of the Alies
101
Pittsburgh,PA,15219
.O OFFICE
L 102
C
Project Location:
Homewood North - Community Center
HVAC Work Replacement
10 Albertice St.
Pittsburgh, PA 15208
OFFICE
WOMEN'S 105
UNISEX UNISEX MEN'S
107
101B 101A 106
RECREATION ROOM drawing title
HALLWAY 109
100
Demolition Plan and RCP Demolition
Plan Legend, First Floor Demolition
NOTE: REFER TO MECHANICAL
DRAWINGS FOR MORE INFORMATION. OFFICE CLO. CLO. Plan, Roof Demolition Plan, First
103
OFFICE
Floor Reflected Ceiling Demolition
104
Plan
EXISTING FURNACE AND
ENCLOSURE TO BE
REMOVED. REMOVE ANY
ABANDONED UTILITIES BACK
.O TO SOURCE AND FINISH
L WALLS AND FLOOR AS
6'X6' OPENING IN PLYWOOD. GC TO NOTE: C
NECESSARY.
DETERMINE FINAL OPENING PLACEMENT TO
REFER TO MECHANICAL DRAWINGS
DISTRUB NO STRUCTURAL ELEMENTS. GC scale
TO CUT INTO CEILING FRAMING BELOW AND FOR MORE INFORMATION. KITCHEN As Noted SShheeeett NNoo..
BRACE AND SHORE ACCORDINGLY TO 108
CREATE NEW ACCESS HATCH. PREFER TO
ROOF PLAN FOR MORE DETAILS. date
NOTE:
WD F 05.19.2026
REMOVE ANY ABANDONED UTILITIES A3
BACK TO SOURCE. no. of.
PLAN 3 10
NORTH
Roof Demolition Plan First Floor Demolition Plan
Project #2441
2 1
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
| FLOOR PLAN LEGEND CEILING LEGEND EXISTING WALL TO REMAIN 0'-0" XXX CEILING HEIGHT AND MATERIAL Fukui Architects Pc XXXXXX ROOM NAME AND NUMBER 000 XXX EXIST. EXISTING CEILING, SEE GENERAL NOTE 4 2 0 5 R o s s S t r e e t EXISTING DOOR Pittsburgh, Pennsylvania 15219 CEILING GRID AND TILE. ph 412.281.6001 fx 412.281.6002 GENERAL FLOOR PLAN NOTES (C) 2 0 2 6 F u k u i A r c h i t e c t s , P c 1. CONTRACTOR TO FIELD VERIFY ANY AND ALL CONDITIONS & DIMENSIONS OF WORK AREAS BEFORE BEGINNING WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT. 2. THE FINISH FLOOR OF THIS PROJECT IS IDENTIFIED AT 0'-0" IN THIS SET OF DRAWINGS. 3. ALIGN NEW WALL CONSTRUCTION WITH EXISTING WALL CONSTRUCTION. FINISH NEW PARTITION SMOOTH TO FORM A SEAMLESS JOINT BETWEEN NEW & EXISTING PARTITIONS. 4. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER GRAPHIC REPRESENTATIONS. NOTIFY ARCHITECT IN WRITING OF ANY INCONSISTENT OR MISSING DIMENSIONS. 5. DIMENSIONS SHOWN INDICATE FINISHED FACE TO DAYCARE FINISHED FACE, UNLESS NOTED OTHERWISE. 101 seal 6. AT WALLS EXISTING TO REMAIN, PATCH AND PAINT .O OFFICE ANY HOLES OR DAMAGE TO APPEAR NEW. L 102 C OFFICE WOMEN'S 105 UNISEX UNISEX MEN'S 107 101B 101A 106 RECREATION ROOM general notes HALLWAY 109 100 11.. Any conflicts in the drawings or between new and existing construction shall be referred to the Architect. 1'-3 3/4" 22.. Contractor shall verify all dimensions and existing OFFICE CLO. CLO. conditions in the field and shall advise Fukui Architects, 6'-0" 103 Pc of any discrepancies between, additions to, deletions OFFICE from, or alterations to any and all conditions prior to 104 proceeding with any phase of work. Do not scale "0 drawings. -'6 33.. All work shall be installed in accordance with applicable codes and regulations. .O 44.. Contractor shall be responsible for the patching, L NOTE: REFER TO MECHANICAL C repairing, and preparations of all existing floor, wall, and ceiling surfaces as required to receive scheduled finishes. DRAWINGS FOR MORE INFORMATION. "2 /1 KITCHEN 8 55.. All items shown on drawings are finished construction NOTE: ALL CONTRACTORS TO TAKE 108 -'0 assemblies. Contractor shall provide and install all 1 material required for finished assemblies. CARE TO NOT AFFECT EXISTING SPRINKLER SYSTEM AND FIRE ALARM 66.. All reports, plans, specifications, computer files, field data, notices, and other documents and instruments SYSTEM. ALL TO REMAIN ACTIVE prepared by the Architect as instruments of service shall DURING CONSTRUCTION. remain the property of the Architect. The Architect shall EXISTING SUSPENDED CEILING NEW TRIMMER AND HEADER JOISTS SHALL BE retain all common law statutory, and other reserved GRID, LIGHTING, AND HVAC DOUBLED TO MATCH EXISTING STRUCTURE DEPTH rights, including the copyright thereto. GRILLE TO BE RE-INSTALLED. PER 2308.4.4. PROVIDE JOIST HANGERS FOR TAIL revisions NEW ACOUSTIC CEILING TILES TO JOISTS AND HEADER JOIST. DOUBLE TRIMMER BE INSTALLED ACROSS ENTIRE JOIST SHALL BE THE ENTIRE LENGTH OF BEARING 1 ISSUE FOR CLIENT REVIEW 02.28.2025 RECREATION ROOM. POINTS. TAIL JOISTS OVER 12 FEET IN LENGTH SHALL BE SUPPORTED AT THE HEADER BY 2 ISSUE FOR BID AND PERMIT 09.24.2025 FRAMING ANCHORS OR ON LEDGER STRIPS NOT LESS THAN 2" X 2". PROVIDE ADDITIONAL DOUBLE 3 ISSUE FOR ZDR REVISIONS 01.07.2026 HEADER JOIST WHERE SPAN IS GREATER THAN 10' FOR TRIM JOISTS. PROVIDE NEW PLYWOOD COVER 4 IFC & IFB 05.19.2026 OVER OPENING ABOVE. First Floor Reflected Ceiling Plan 2 SCALE: 1/8" = 1'-0" project title Owner: HACP DAYCARE 412 Boulevard of the Alies 101 Pittsburgh,PA,15219 .O OFFICE L 102 C Project Location: Homewood North - Community Center HVAC Work Replacement 10 Albertice St. Pittsburgh, PA 15208 OFFICE WOMEN'S 105 UNISEX UNISEX MEN'S 107 101B 101A 106 drawing title RECREATION ROOM HALLWAY 109 100 Floor Plan and RCP Floor Plan Legend, General Floor Plan, First OFFICE CLO. CLO. Floor Reflected Ceiling Plan, Reflected 103 OFFICE Ceiling Plan Legend 104 .O NOTE: REFER TO MECHANICAL L GC TO REPAIR, PATCH, AND C CLEAN ANY ALTERED DRYWALL DRAWINGS FOR MORE INFORMATION. AFTER REMOVAL OF EXISTING scale FURNACE. ANTICIPATED AREA SShheeeett NNoo.. KITCHEN OF REPAIR IS 10SF. As Noted 108 date 05.19.2026 A4 no. of. PLAN 4 10 NORTH General Floor Plan 1 Project #2441 SCALE: 1/8" = 1'-0" | |||
|---|---|---|---|
| scale As Noted | SShheeeett NNoo.. A4 Project #2441 | ||
| date 05.19.2026 | |||
| no. 4 | of. 10 | ||
| .O L C | OFFICE 102 | |||||||||||||||||||||||||||||||||||
| OFFICE 105 HALLWAY 100 CLO. CLO. | OFFICE 105 | |||||||||||||||||||||||||||||||||||
| UNISEX 101B | UNISEX 101A | |||||||||||||||||||||||||||||||||||
| OFFICE 103 | REC | REA | TION | RO | OM | |||||||||||||||||||||||||||||||
| 109 | ||||||||||||||||||||||||||||||||||||
| OFFICE 104 | CLO. CLO. | 1'- | 3 3/4" | |||||||||||||||||||||||||||||||||
| 6'-0" | ||||||||||||||||||||||||||||||||||||
| "0 -'6 | ||||||||||||||||||||||||||||||||||||
| .O L C | ||||||||||||||||||||||||||||||||||||
| K | ITCH 108 | EN | "2 /1 8 -'0 | |||||||||||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||||||||||||||
| EXISTING SUSPENDED CEILING GRID, LIGHTING, AND HVAC GRILLE TO BE RE-INSTALLED. NEW ACOUSTIC CEILING TILES TO BE INSTALLED ACROSS ENTIRE RECREATION ROOM. |
| WOMEN'S 107 | ||
|---|---|---|
| UNISEX UNISEX 101B 101A | |
| .O L C |
|---|
| WOMEN'S 107 | |||
|---|---|---|---|
| .O L C | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
FLOOR PLAN LEGEND CEILING LEGEND
EXISTING WALL TO REMAIN
0'-0" XXX CEILING HEIGHT AND MATERIAL Fukui Architects Pc
XXXXXX
ROOM NAME AND NUMBER
000 XXX EXIST. EXISTING CEILING, SEE GENERAL NOTE 4
2 0 5 R o s s S t r e e t
EXISTING DOOR
Pittsburgh, Pennsylvania 15219
CEILING GRID AND TILE.
ph 412.281.6001 fx 412.281.6002
GENERAL FLOOR PLAN NOTES
(C) 2 0 2 6 F u k u i A r c h i t e c t s , P c
1. CONTRACTOR TO FIELD VERIFY ANY AND ALL
CONDITIONS & DIMENSIONS OF WORK AREAS
BEFORE BEGINNING WORK. REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
2. THE FINISH FLOOR OF THIS PROJECT IS IDENTIFIED
AT 0'-0" IN THIS SET OF DRAWINGS.
3. ALIGN NEW WALL CONSTRUCTION WITH EXISTING
WALL CONSTRUCTION. FINISH NEW PARTITION
SMOOTH TO FORM A SEAMLESS JOINT BETWEEN NEW
& EXISTING PARTITIONS.
4. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER
GRAPHIC REPRESENTATIONS. NOTIFY ARCHITECT IN
WRITING OF ANY INCONSISTENT OR MISSING
DIMENSIONS.
5. DIMENSIONS SHOWN INDICATE FINISHED FACE TO DAYCARE
FINISHED FACE, UNLESS NOTED OTHERWISE. 101
seal
6. AT WALLS EXISTING TO REMAIN, PATCH AND PAINT .O OFFICE
ANY HOLES OR DAMAGE TO APPEAR NEW. L 102
C
OFFICE
WOMEN'S 105
UNISEX UNISEX MEN'S
107
101B 101A 106
RECREATION ROOM general notes
HALLWAY 109
100 11.. Any conflicts in the drawings or between new and
existing construction shall be referred to the Architect.
1'-3 3/4"
22.. Contractor shall verify all dimensions and existing
OFFICE CLO. CLO. conditions in the field and shall advise Fukui Architects,
6'-0"
103 Pc of any discrepancies between, additions to, deletions
OFFICE
from, or alterations to any and all conditions prior to
104
proceeding with any phase of work. Do not scale
"0 drawings.
-'6
33.. All work shall be installed in accordance with applicable
codes and regulations.
.O 44.. Contractor shall be responsible for the patching,
L
NOTE: REFER TO MECHANICAL C repairing, and preparations of all existing floor, wall, and
ceiling surfaces as required to receive scheduled finishes.
DRAWINGS FOR MORE INFORMATION. "2
KITCHEN
/1
8 55.. All items shown on drawings are finished construction
NOTE: ALL CONTRACTORS TO TAKE 108 -'0 assemblies. Contractor shall provide and install all
1 material required for finished assemblies.
CARE TO NOT AFFECT EXISTING
SPRINKLER SYSTEM AND FIRE ALARM 66.. All reports, plans, specifications, computer files, field
data, notices, and other documents and instruments
SYSTEM. ALL TO REMAIN ACTIVE
prepared by the Architect as instruments of service shall
DURING CONSTRUCTION.
remain the property of the Architect. The Architect shall
EXISTING SUSPENDED CEILING NEW TRIMMER AND HEADER JOISTS SHALL BE retain all common law statutory, and other reserved
GRID, LIGHTING, AND HVAC DOUBLED TO MATCH EXISTING STRUCTURE DEPTH rights, including the copyright thereto.
GRILLE TO BE RE-INSTALLED. PER 2308.4.4. PROVIDE JOIST HANGERS FOR TAIL revisions
NEW ACOUSTIC CEILING TILES TO JOISTS AND HEADER JOIST. DOUBLE TRIMMER
BE INSTALLED ACROSS ENTIRE JOIST SHALL BE THE ENTIRE LENGTH OF BEARING 1 ISSUE FOR CLIENT REVIEW 02.28.2025
RECREATION ROOM. POINTS. TAIL JOISTS OVER 12 FEET IN LENGTH
SHALL BE SUPPORTED AT THE HEADER BY 2 ISSUE FOR BID AND PERMIT 09.24.2025
FRAMING ANCHORS OR ON LEDGER STRIPS NOT
LESS THAN 2" X 2". PROVIDE ADDITIONAL DOUBLE
3 ISSUE FOR ZDR REVISIONS 01.07.2026
HEADER JOIST WHERE SPAN IS GREATER THAN 10'
FOR TRIM JOISTS. PROVIDE NEW PLYWOOD COVER
4 IFC & IFB 05.19.2026
OVER OPENING ABOVE.
First Floor Reflected Ceiling Plan
2
SCALE: 1/8" = 1'-0"
project title
Owner:
HACP
DAYCARE 412 Boulevard of the Alies
101
Pittsburgh,PA,15219
.O OFFICE
L 102
C
Project Location:
Homewood North - Community Center
HVAC Work Replacement
10 Albertice St.
Pittsburgh, PA 15208
OFFICE
WOMEN'S 105
UNISEX UNISEX MEN'S
107
101B 101A 106
drawing title
RECREATION ROOM
HALLWAY 109
100
Floor Plan and RCP Floor Plan
Legend, General Floor Plan, First
OFFICE CLO. CLO. Floor Reflected Ceiling Plan, Reflected
103
OFFICE Ceiling Plan Legend
104
.O
NOTE: REFER TO MECHANICAL L GC TO REPAIR, PATCH, AND
C CLEAN ANY ALTERED DRYWALL
DRAWINGS FOR MORE INFORMATION.
AFTER REMOVAL OF EXISTING
scale
FURNACE. ANTICIPATED AREA SShheeeett NNoo..
KITCHEN OF REPAIR IS 10SF. As Noted
108
date
05.19.2026
A4
no. of.
PLAN 4 10
NORTH
General Floor Plan
1 Project #2441
SCALE: 1/8" = 1'-0"
| Fukui Architects Pc GENERAL NOTES DELIVERY SCHEDULE, OR BOTH SHALL BE MADE UNDER THIS CLAUSE MATERIAL OR PRODUCT REPRESENTED, ITS PLACE OF ORIGIN, THE NAME REPLACED IN THE SAME CONDITION AS AT THE TIME OF AWARD OFTHIS DETERMINES AND DESIGNATES CAN BE ACCEPTED SEPARATELY. ITEMS, THE QUANTITY AND UNIT COST OF EACH, AND THE AGGREGATE ANDTHE CONTRACT MODIFIED IN WRITING ACCORDINGLY. OF THE PRODUCER, THE CONTRACTOR'S NAME, AND THE IDENTIFICATION CONTRACT. ACCEPTANCE SHAL LBE FINAL AND CONCLUSIVE EXCEPT FOR LATENT COST); TRANSPORTATION AND DELIVERY COSTS ASSOCIATED WITH USE OF THE DOCUMENTS (C)NO REQUEST BY THECONTRACTOR FOR AN EQUITABLE ADJUSTMENT OF THE CONSTRUCTION PROJECT FOR WHICH THE MATERIAL OR (F)NEW WORK WHICH CONNECTS TO EXISTING WORK SHALL DEFECTS, FRAUD,GROSS MISTAKES AMOUNTING TO FRAUD, OR THE MATERIALS; LABOR BREAKDOWNS BY HOURS OR UNIT COSTS (IDENTIFIED 2 0 5 R o s s S t r e e t THE USE OF THESE DOCUMENTS IS RESTRICTED TO THE ORIGINAL SITE TO THE CONTRACT UNDER THIS CLAUSE SHALL BE ALLOWED, UNLESS PRODUCTIS INTENDED TO BE USED. CORRESPOND IN ALL RESPECTS WITH THAT TO WHICH IT CONNECTS PHA'S RIGHT UNDER ANY WARRANTY OR GUARANTEE. WITH SPECIFIC WORK TO BE PERFORMED);CONSTRUCTION EQUIPMENT FOR WHICH THEY WERE PREPARED. RE-USE OR REPRODUCTION OF THE THE CONTRACTOR HAS GIVEN THE WRITTEN NOTICE REQUIRED; (3) CERTIFICATES SHALL BE SUBMITTED IN TRIPLICATE, DESCRIBING EACH AND/OR BE SIMILAR TO EXISTING WORK UNLESS OTHERWISE REQUIRED EXCLUSIVELY NECESSARY FOR THE CHANGE; COSTS OF PREPARATION DOCUMENTS (IN WHOLE OR IN PART), FOR ANY OTHER PURPOSE IS PROVIDED, THAT THE TIME PRESCRIBED IN (A) ABOVE FORGIVING SAMPLE SUBMITTED FOR APPROVAL AND CERTIFYING THAT THE BY THE SPECIFICATIONS. USE AND POSSESSION PRIOR TO COMPLETION AND/ OR REVISION TO SHOP DRAWINGS RESULTING FROM THE CHANGE; Pittsburgh, Pennsylvania 15219 PROHIBITED. TITLE TO THESE REMAINS WITH FUKUI ARCHITECTS P.C. WRITTEN NOTICE MAY BE EXTENDED BY THE CONTRACTING OFFICER. MATERIAL, EQUIPMENT OR ACCESSORY COMPLIES WITH CONTRACT (G)NO STRUCTURAL MEMBERS SHALL BE ALTERED OR IN ANY WAY (A)THE PHA SHALL HAVE THE RIGHT TO TAKE POSSESSION OF OR USE ANY WORKER'S COMPENSATION AND PUBLIC LIABILITY (FAR). VISUAL CONTACT WITH THE DOCUMENTS IS PRIMA FACIE (D)NO REQUEST BY THE CONTRACTOR FOR AN EQUITABLE REQUIREMENTS. THE CERTIFICATES SHALL INCLUDE THE NAME AND WEAKENED WITHOUT THE WRITTEN AUTHORIZATION OF THE COMPLETED OR PARTIALLY COMPLETED PART OF THE WORK. BEFORE INSURANCE;EMPLOYMENT TAXES UNDER FICA AND FUTA; AND, BOND ph 412.281.6001 fx 412.281.6002 EVIDENCE OF THE ACCEPTANCE OF THESE RESTRICTIONS. ADJUSTMENTTO THE CONTRACT FOR DIFFERING SITE CONDITIONS SHALL BRAND OF THE PRODUCT, NAME OFMANUFACTURER, AND THE LOCATION CONTRACTING OFFICER, UNLESS SUCH WORK IS CLEARLY SPECIFIED IN TAKING POSSESSION OF OR USING ANY WORK, THE CONTRACTING COSTS WHEN SIZE OF CHANGE WARRANTS REVISION. (2)INDIRECT BE ALLOWED IF MADE AFTER FINAL PAYMENT UNDER THIS CONTRACT. WHERE PRODUCED. THE PLANS OR SPECIFICATIONS. OFFICER SHALL FURNISH THE CONTRACTOR A LIST OF ITEMS OF WORK COSTS. INDIRECT COSTS MAY INCLUDE OVERHEAD,GENERAL AND DIVISION 1 - GENERAL CONDITIONS (4) APPROVAL OF A SAMPLE SHALL NOT CONSTITUTE A WAIVER OFTHE (H)IF THE REMOVAL OF THE EXISTING WORK EXPOSES DISCOLORED OR REMAINING TO BE PERFORMED OR CORRECTED ON THOSE PORTIONS OF ADMINISTRATIVE EXPENSES, AND FRINGE BENEFITS NOT NORMALLY SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION PHA RIGHT TO DEMAND FULL COMPLIANCE WITH CONTRACT UNFINISHED SURFACES, OR WORK OUT OF ALIGNMENT, SUCH SURFACES THE WORK THAT THE PHA INTENDS TO TAKE POSSESSION OF OR USE. TREATED AS DIRECT COSTS. (3)PROFIT. THE AMOUNT OF PROFIT SHALL APPLICABILITY OF HUD-5370 GENERAL CONDITIONS FOR CONSTRUCTION (A)THE CONTRACTOR SHALL KEEP ON THE WORK SITE A COPY OF THE REQUIREMENTS. MATERIALS, EQUIPMENT AND ACCESSORIES MAY BE SHALL BE REFINISHED, OR THE MATERIAL REPLACED AS NECESSARY TO HOWEVER, FAILURE OF THE CONTRACTING OFFICER TO LIST ANY ITEM OF BE NEGOTIATED AND MAY VARY ACCORDING TO THE NATURE, EXTENT, (C) 2 0 2 6 F u k u i A r c h i t e c t s , P c CONTRACTS- PUBLIC HOUSING PROGRAMS DRAWINGS AND SPECIFICATIONS AND SHALL AT ALL TIMES GIVE THE REJECTED FOR CAUSE EVEN THOUGH SAMPLES HAVE BEEN APPROVED. MAKE THE CONTINUOUS WORK UNIFORM AND HARMONIOUS. THIS, WORK SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR AND COMPLEXITY OF THE WORK REQUIRED BY THE CHANGE. THE THE HUD-5370, GENERAL CONDITIONS, CURRENT EDITION, SHALL APPLY CONTRACTING OFFICER ACCESS THERETO. ANYTHING MENTIONED IN (5) WHEREVER MATERIALS ARE REQUIRED TO COMPLY WITH HOWEVER, SHALL NOT BE CONSTRUED TO REQUIRE THE REFINISHING OR COMPLYING WITH THE TERMS OF THE CONTRACT. THE PHA'S ALLOWABILITY OF THE DIRECT AND INDIRECT COSTS SHALL BE TO THE PROJECT. A COPY OF THE HUD GENERAL CONDITIONS ARE THE SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR SHOWN RECOGNIZED STANDARDS OR SPECIFICATIONS, SUCH SPECIFICATIONS RECONSTRUCTION OF DISSIMILAR FINISHES PREVIOUSLY EXPOSED, OR POSSESSION OR USE SHALL NOT BE DEEMED AN ACCEPTANCE OF ANY DETERMINED IN ACCORDANCE WITH THE CONTRACT COST PRINCIPLES INCLUDED IN THE FRONT END DOCUMENTS AS PART OF HUD FORMS. ON THE DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS, SHALL SHALL BE ACCEPTED AS ESTABLISHING THE TECHNICAL QUALITIES AND FINISHED SURFACES IN GOOD CONDITION, BUT IN DIFFERENT PLANES OR WORK UNDER THE CONTRACT. AND PROCEDURES FOR COMMERCIAL FIRMS IN PART 31 OF THE FEDERAL HARD COPIES ARE AVAILABLE AT HACP OFFICE. BE OF LIKE EFFECT AS IF SHOWN OR MENTIONED IN BOTH. IN CASE OF TESTING METHODS, BUT SHALL NOT GOVERN THE NUMBER OF TESTS ON DIFFERENT LEVELS WHEN BROUGHT TOGETHER BY THE REMOVAL OF (B)WHILE THE PHA HAS SUCH POSSESSION OR USE, THE CONTRACTOR ACQUISITION REGULATION (48 CFR 1-31),AS IMPLEMENTED BY HUD DIFFERENCE BETWEEN DRAWINGS AND SPECIFICATIONS, THE REQUIRED TO BE MADE NOR MODIFY OTHER CONTRACT REQUIREMENTS. INTERVENING WORK, UNLESS SUCH REFINISHING OR RECONSTRUCTION SHALL BE RELIEVED OF THE RESPONSIBILITY FOR (1) THE LOSS OF OR HANDBOOK 2210.18, IN EFFECT ONTHE DATE OF THIS CONTRACT. THE MULTIPLE CONTRACT SPECIFICATIONS SHALL GOVERN. IN CASE OF DISCREPANCY IN THE THE CONTRACTING OFFICER MAY REQUIRE LABORATORY TEST REPORTS IS SPECIFIED IN THE PLANS OR SPECIFICATIONS. DAMAGE TO THE WORK RESULTING FROM THE PHA'S POSSESSION OR CONTRACTOR SHALL NOT BE ALLOWED A PROFIT ON THE PROFIT 1.COORDINATION FIGURES, IN THE DRAWINGS, OR IN THE SPECIFICATIONS, THE MATTER ON ITEMS SUBMITTED FOR APPROVAL OR MAY APPROVE MATERIALS ON (I)THE CONTRACTOR SHALL GIVE ALL REQUIRED NOTICES TO ANY USE, NOTWITHSTANDING THE TERMS OF THE CLAUSE ENTITLED PERMITS RECEIVED BY ANY SUBCONTRACTOR. EQUITABLE ADJUSTMENTS FOR GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION SHALL BE PROMPTLY SUBMITTED TO THE CONTRACTING OFFICER, WHO THE BASIS OF DATA SUBMITTED IN CERTIFICATES WITH SAMPLES. CHECK ADJOINING OR ADJACENT PROPERTY OWNER OR OTHER PARTY BEFORE AND CODES HEREIN; (2) ALL MAINTENANCE COSTS ON THE AREAS DELETED WORK SHALL INCLUDE A CREDIT FOR PROFIT AND MAY INCLUDE BETWEEN THE GENERAL CONSTRUCTION CONTRACT, PLUMBING SHALL PROMPTLY MAKE A DETERMINATION IN WRITING. ANY TESTS WILL BE MADE ON MATERIALS THE COMMENCEMENT OF ANY WORK. OCCUPIED; AND, (3)FURNISHING HEAT, LIGHT, POWER, AND WATER USED A CREDIT FOR INDIRECT COSTS. ON PROPOSALS COVERING BOTH CONTRACT, MECHANICAL CONTRACT, ELECTRICAL CONTRACT, AND ADJUSTMENTBY THE CONTRACTOR WITHOUT SUCH A DETERMINATION DELIVERED FOR USE ONLY AS FREQUENTLY AS THE CONTRACTING (J)THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE PHA IN THE AREAS OCCUPIED WITHOUT PROPER REMUNERATION INCREASES AND DECREASES IN THE AMOUNT OF THE CONTRACT, THE ADDITIONAL CONTRACTS APPLICABLE IN THE CONSTRUCTION SHALL BE ATITS OWN RISK AND EXPENSE. THE CONTRACTING OFFICER OFFICER DETERMINES NECESSARY TO INSURE COMPLIANCE OF FROM ANY DAMAGES ON ACCOUNT OF SETTLEMENT OR THE LOSS OF THEREFORE. IF PRIOR POSSESSION OR USE BY THE PHA DELAYS THE APPLICATION OF INDIRECT COSTS AND PROFIT SHALL BE ON THE NET- DOCUMENTS. SHALLFURNISH FROM TIME TO TIME SUCH DETAILED DRAWINGS AND MATERIALS WITH THE SPECIFICATIONS. THE CONTRACTOR WILL ASSUME LATERAL SUPPORT OF ADJOINING PROPERTY, ANY DAMAGES FROM PROGRESS OF THE WORK OR CAUSES ADDITIONAL EXPENSE TO THE CHANGE INDIRECT COSTS FOR THE CONTRACTOR OR SUBCONTRACTOR OTHER INFORMATION AS CONSIDERED NECESSARY, UNLESS OTHERWISE ALL COSTS OF RETESTING MATERIALS WHICH FAIL TO MEET CONTRACT CHANGES IN TOPOGRAPHY AFFECTING DRAINAGE, AND FROM ALL LOSS CONTRACTOR, AN EQUITABLE ADJUSTMENT SHALL BE MADE IN THE PERFORMING THE WORK. 2.GENERAL REQUIREMENTS OF CONTRACTS PROVIDED. REQUIREMENTS AND/OR TESTING MATERIAL SOFFERED IN SUBSTITUTION OR EXPENSE AND ALL DAMAGES FOR WHICH THE PHA MAY BECOME CONTRACT PRICE OR THE TIME OF COMPLETION, AND THE CONTRACT (G)THE CONTRACTOR SHALL INCLUDE IN THE PROPOSAL ITS UNLESS THE AGREEMENT CONTAINS A MORE SPECIFIC DESCRIPTION OF (B)WHEREVER IN THE SPECIFICATIONS OR UPON THE DRAWINGS THE FOR THOSE FOUND DEFICIENT. LIABLE IN CONSEQUENCE OF SUCH INJURY OR DAMAGE TO ADJOINING SHALL BE MODIFIED IN WRITING ACCORDINGLY. REQUESTFOR TIME EXTENSION (IF ANY), AND SHALL INCLUDE SUFFICIENT THE WORK OF EACH CONTRACT, REQUIREMENTS INDICATED ON WORDS "DIRECTED", "REQUIRED", "ORDERED", (6) AFTER APPROVAL, SAMPLES WILL BE KEPT IN THE PROJECT OFFICE AND ADJACENT STRUCTURES AND THEIR PREMISES. INFORMATION AND DATES TO DEMONSTRATE WHETHER AND TO WHAT DRAWINGS AND IN SPECIFICATION SECTIONS DETERMINE WHICH "DESIGNATED","PRESCRIBED", OR WORDS OF LIKE IMPORT ARE USED, IT UNTIL COMPLETION OF WORK. THEY MAY BE BUILT INTO THE WORK AFTER (K)THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO VEGETATION, WARRANTY OF TITLE EXTENT THE CHANGE WILL DELAY THE COMPLETION OF THE CONTRACT CONTRACT INCLUDES A SPECIFIC ELEMENT OF PROJECT. SHALL BE UNDERSTOOD THAT THE"DIRECTION", "REQUIREMENT", A SUBSTANTIAL QUANTITY OF THE MATERIALSTHEY REPRESENT HAS STRUCTURES, EQUIPMENT, UTILITIES, OR IMPROVEMENTS,INCLUDING THE CONTRACTOR WARRANTS GOOD TITLE TO ALL MATERIALS,SUPPLIES, IN ITS ENTIRETY. seal "ORDER","DESIGNATION", OR "PRESCRIPTION", OF THE CONTRACTING BEEN BUILT IN AND ACCEPTED. THOSE THAT ARE THE PROPERTY OF A THIRD PARTY,RESULTING FROM AND EQUIPMENT INCORPORATED IN THE WORK AND AGREES TO DELIVER (H)THE CONTRACTING OFFICER SHALL ACT ON PROPOSALS WITHIN 3.SCOPE OF WORK RESPONSIBILITY OFFICER IS INTENDED AND SIMILARLY THE WORDS "APPROVED", (C)REQUIREMENTS CONCERNING LEAD-BASED PAINT. THE CONTRACTOR FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS CONTRACT OR THE PREMISES TOGETHER WITH ALL IMPROVEMENTS THERE ON FREE 30DAYS AFTER THEIR RECEIPT, OR NOTIFY THE CONTRACTOR OF THE A. GENERAL CONSTRUCTION CONTRACT "ACCEPTABLE","SATISFACTORY", OR WORDS OF LIKE IMPORT SHALL MEAN SHALL COMPLY WITH THE REQUIREMENTS CONCERNING LEAD-BASED FAILURE TO EXERCISE REASONABLE CARE IN PERFORMING THE WORK. IF FROM ANY CLAIMS, LIENS OR CHARGES, AND AGREES FURTHER THAT DATE WHEN SUCH ACTION WILL BE TAKEN. WORK OF THE GENERAL CONSTRUCTION CONTRACT "APPROVED BY", OR "ACCEPTABLE TO", OR "SATISFACTORY TO" THE PAINT CONTAINED IN THE LEAD-BASED PAINT POISONING PREVENTION THE CONTRACTOR FAILS OR REFUSES TO REPAIR THE DAMAGE NEITHER IT NOR ANY OTHER PERSON, FIRM OR CORPORATION SHALL (I)FAILURE TO REACH AN AGREEMENT ON ANY PROPOSAL SHALL BE INCLUDES, BUT IS NOT LIMITED TO, THE REMAINING WORK CONTRACTING OFFICER, UNLESS OTHERWISE EXPRESSLY STATED. ACT (42 U.S.C. 4821-4846) AS IMPLEMENTED BY 24 CFR PART 35. PROMPTLY, THE CONTRACTING OFFICER MAY HAVE THE NECESSARY HAVE ANY RIGHT TO A LIEN UPON THE PREMISES OR ANYTHING APPUR ADISPUTE UNDER THE CLAUSE ENTITLED DISPUTES HEREIN.NOTHING IN NOT IDENTIFIED AS WORK UNDER OTHER CONTRACTS. (C)WHERE "AS SHOWN" "AS INDICATED", "AS DETAILED", OR WORDS OF WORK PERFORMED AND CHARGE THE COST TO THE CONTRACTOR. TENANT THERETO. THIS CLAUSE, HOWEVER, SHALL EXCUSE THE CONTRACTOR FROM SIMILAR IMPORT ARE USED, IT SHALL BE UNDERSTOOD THAT THE PERMITS AND CODES PROCEEDING WITH THE CONTRACT AS CHANGED. B. MECHANICAL CONTRACT REFERENCE IS MADE TO THE DRAWINGS ACCOMPANYING THIS (A)THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH TEMPORARY BUILDINGS AND TRANSPORTATION OF MATERIALS WARRANTY OF CONSTRUCTION (J)EXCEPT IN AN EMERGENCY ENDANGERING LIFE OR PROPERTY, WORK OF THE MECHANICAL CONTRACT INCLUDES, BUT IS CONTRACT UNLESS STATED OTHERWISE. THE WORD "PROVIDED" AS ALLAPPLICABLE LAWS, ORDINANCES, CODES, RULES AND REGULATIONS. (A)TEMPORARY BUILDINGS (E.G., STORAGE SHEDS, SHOPS, OFFICES, (A) IN ADDITION TO ANY OTHER WARRANTIES IN THIS CONTRACT, THE NOCHANGE SHALL BE MADE BY THE CONTRACTOR WITHOUT A PRIOR NOT LIMITED TO, SUPPLYING AND INSTALLING ALL USED HEREIN SHALL BE UNDERSTOOD TO MEAN "PROVIDE COMPLETE IN NOTWITHSTANDING THE REQUIREMENT OF THE CONTRACTOR TO SANITARY FACILITIES) AND UTILITIES MAY BE ERECTED BY THE CONTRACTOR WARRANTS, EXCEPT ASPROVIDED IN PARAGRAPH (J)OF ORDER FROM THE CONTRACTING OFFICER. MECHANICAL EQUIPMENT AND CONNECTIONS TO PLACE" THAT IS "FURNISHED AND INSTALLED". COMPLY WITH THE DRAWINGS AND SPECIFICATIONS IN THE CONTRACT, CONTRACTOR ONLY WITH THE APPROVAL OF THE CONTRACTING THIS CLAUSE, THAT WORK PERFORMED UNDER THIS CONTRACT EQUIPMENT FURNISHED BY MECHANICAL CONTRACT AND (D)"SHOP DRAWINGS" MEANS DRAWINGS, SUBMITTED TO THE PHA BY THE ALL WORK INSTALLED SHALL COMPLY WITH ALL APPLICABLE CODES AND OFFICER AND SHALL BE BUILT WITH LABOR AND MATERIALS FURNISHED CONFORMS TO THE CONTRACT REQUIREMENTS AND IS FREE OF ANY DEMOLITION/ALTERATION NOTES ELECTRICAL CONTRACT. MECHANICAL EQUIPMENT CONTRACTOR, SUBCONTRACTOR, OR ANY LOWER TIER REGULATIONS AS AMENDED BY ANY WAIVERS. BEFORE INSTALLING THE BY THE CONTRACTOR WITHOUT EXPENSE TO THE PHA. THE TEMPORARY DEFECT IN EQUIPMENT, MATERIAL, OR WORKMANSHIP PERFORMED BY INCLUDES, BUT IS NOT LIMITED TO: FURNACES AND SUBCONTRACTOR, SHOWING IN DETAIL (1) THE PROPOSED FABRICATION WORK, THE CONTRACTOR SHALL EXAMINE THE DRAWINGS AND THE BUILDINGS AND UTILITIES SHALL REMAIN THE PROPERTY OF THE THE CONTRACTOR OR ANY SUBCONTRACTOR OR SUPPLIER AT ANY TIER. HAZARDOUS MATERIALS REMOVAL CONDENSERS, KITCHEN AND BATH EXHAUST FANS, AND ASSEMBLY OF STRUCTURAL ELEMENTS AND (2) THE SPECIFICATIONS FOR COMPLIANCE WITH APPLICABLE CODES AND CONTRACTOR AND SHALL BE REMOVED BY THE CONTRACTOR AT ITS THIS WARRANTY SHALL CONTINUE FOR A PERIOD OF_ONE YEAR UNLESS IF NOT ALREADY IDENTIFIED OR REMOVED, ANY MATERIALS DISCOVERED THERMOSTATS AND CONTROLS, ETC. INSTALLATION(I.E., FORM, FIT, AND ATTACHMENT DETAILS) OF MATERIALS REGULATIONS BEARING ON THE WORK AND SHALL IMMEDIATELY REPORT EXPENSE UPON COMPLETION OF THE WORK. WITH THE WRITTEN OTHERWISE INDICATED FROM THE DATE OF FINAL ACCEPTANCE OFTHE IN THE COURSE OF CONSTRUCTION THAT ARE DEEMED AS HAZARDOUS, OF EQUIPMENT. IT INCLUDES DRAWINGS, DIAGRAMS, ANY DISCREPANCY IT MAY DISCOVER TO THE CONTRACTING OFFICER. CONSENT OF THE CONTRACTING OFFICER, THE BUILDINGS AND UTILITIES WORK. IF THE PHA TAKES POSSESSION OF ANY PART OF THE WORK SUCH AS BUT NOT LIMITED TO, ASBESTOS OR LEAD PAINTS, SHALL BE PRE-CONSTRUCTION CONFERENCE AND NOTICE TO PROCEED LAYOUTS,SCHEMATICS, DESCRIPTIVE LITERATURE, ILLUSTRATIONS, WHERE THE REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS MAY BE ABANDONED AND NEED NOT BE REMOVED. BEFORE FINAL ACCEPTANCE, THIS WARRANTY SHALL CONTINUE FOR A REMOVED, ENCAPSULATED OR LEFT IN ITS PRESENT CONDITION AS (A)WITHIN TEN CALENDAR DAYS OF CONTRACT EXECUTION, AND PRIOR SCHEDULES,PERFORMANCE AND TEST DATA, AND SIMILAR MATERIALS FAIL TO COMPLY WITH THE APPLICABLE CODE OR REGULATION, THE (B)THE CONTRACTOR SHALL, AS DIRECTED BY THE CONTRACTING PERIOD OF ONE YEAR UNLESS OTHERWISE INDICATED FROM THE DATE REQUIRED BY FEDERAL, STATE AND LOCAL CODES. CONTRACTOR SHALL TO THE COMMENCEMENT OF WORK, THE CONTRACTOR SHALL ATTEND A FURNISHED BY THE CONTRACTOR TO EXPLAIN IN DETAIL SPECIFIC CONTRACTING OFFICER SHALL MODIFY THE CONTRACT BY CHANGE OFFICER, USE ONLY ESTABLISHED ROADWAYS, OR USE TEMPORARY THAT THE PHA TAKES POSSESSION. UTILIZE THE APPROPRIATE TECHNIQUES, PROCEDURES AND DISPOSAL PRECONSTRUCTION CONFERENCE WITH REPRESENTATIVES OF THE PHA, PORTIONS OF THE WORK REQUIRED BY THE CONTRACT. THE PHA MAY ORDER PURSUANT TO THE CLAUSE ENTITLED CHANGES HEREIN TO ROADWAYS CONSTRUCTED BY THE CONTRACTOR WHEN AND (B)THE CONTRACTOR SHALL REMEDY, AT THE CONTRACTOR'S EXPENSE, METHODS AS PER STANDARD PRACTICE, FEDERAL, STATE AND LOCAL ITS ARCHITECT, AND OTHER INTERESTED PARTIES CONVENED BY THE DUPLICATE, USE, AND DISCLOSE IN ANY MANNER AND FOR ANY PURPOSE CONFORM TO THE CODE OR REGULATION. ASAUTHORIZED BY THE CONTRACTING OFFICER. WHEN MATERIALS ARE ANY FAILURE TO CONFORM, OR ANY DEFECT. IN ADDITION, THE CODES. REMOVAL OF HAZARDOUS MATERIALS NOT PREVIOUSLY PHA. THE CONFERENCE WILL SERVE TO ACQUAINT THE PARTICIPANTS SHOP DRAWINGS DELIVERED UNDER THIS CONTRACT. (B) THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, TRANSPORTED IN PROSECUTING THE WORK, VEHICLES SHALL NOT BE CONTRACTOR SHALL REMEDY, AT THE CONTRACTOR'S EXPENSE, ANY IDENTIFIED SHALL BE AT AN EXTRA COST TO THE CONTRACT, EXCEPT WITH THE GENERAL PLAN OF THE CONSTRUCTION OPERATION AND ALL (E)IF THIS CONTRACT REQUIRES SHOP DRAWINGS, THE CONTRACTOR FEES,AND LICENSES NECESSARY FOR THE PROPER EXECUTION AND LOADED BEYOND THE LOADING CAPACITY RECOMMENDED BY THE DAMAGE TO PHA-OWNED OR CONTROLLED REAL ORPERSONAL THAT HACP SHALL HAVE THE OPPORTUNITY TO HAVE THE MATERIALS general notes OTHER REQUIREMENTS OF THE CONTRACT. THE PHA WILL PROVIDE THE SHALL COORDINATE ALL SUCH DRAWINGS, AND REVIEW THEM FOR COMPLETION OF THE WORK. WHERE THE PHA CAN ARRANGE FORTHE MANUFACTURER OF THE VEHICLE OR PRESCRIBED BY ANY FEDERAL, PROPERTY WHEN THE DAMAGE IS THE RESULT OF- (1) THE REMEDIATED AT ITS OWN EXPENSE. CONTRACTOR WITH THE DATE, TIME, AND PLACE OF THE CONFERENCE. ACCURACY, COMPLETENESS, AND COMPLIANCE WITH OTHER CONTRACT ISSUANCE OF ALL OR PART OF THESE PERMITS, FEES AND LICENSES, STATE, OR LOCAL LAW OR REGULATION. WHEN IT IS NECESSARY TO CONTRACTOR'S FAILURE TO CONFORM TO CONTRACT REQUIRE-MERITS; 11.. Any conflicts in the drawings or between new and (B)THE CONTRACTOR SHALL BEGIN WORK UPON RECEIPT OF A WRITTEN REQUIREMENTS AND SHALL INDICATE ITS APPROVAL THEREON AS WITHOUT COST TO THE CONTRACTOR, THE CONTRACT AMOUNT SHALL BE CROSS CURBS OR SIDEWALKS, THE CONTRACTOR SHALL PROTECT THEM OR (2) ANY DEFECTS OF EQUIPMENT, MATERIAL, WORKMANSHIP OR HAZARDOUS MATERIALS REPORTS ARE AVAILABLE FOR REVIEW BY GC. existing construction shall be referred to the Architect. NOTICE TO PROCEED FROM THE CONTRACTING OFFICER OR DESIGNEE. EVIDENCE OF SUCH COORDINATION AND REVIEW. SHOP DRAWINGS REDUCED ACCORDINGLY. FROM DAMAGE. THE CONTRACTOR SHALL REPAIR OR PAY FOR THE DESIGN FURNISHED BY THE CONTRACTOR. WHERE RECOMMENDED BY THE HACP HAZARDOUS MATERIAL THE CONTRACTOR SHALL NOT BEGIN WORK PRIOR TO RECEIVING SUCH SUBMITTED TO THE CONTRACTING OFFICER WITHOUT EVIDENCE OF THE REPAIR OF ANY DAMAGED CURBS, SIDEWALKS, OR ROADS. (C) THE CONTRACTOR SHALL RESTORE ANY WORK DAMAGED IN CONSULTANT AS STATED ON THE REPORT, REMOVAL OR 22.. Contractor shall verify all dimensions and existing NOTICE. CONTRACTOR'S APPROVAL MAY BE RETURNED FOR RESUBMISSION.THE HEALTH, SAFETY AND ACCIDENT PREVENTION FULFILLING THE TERMS AND CONDITIONS OF THIS CLAUSE. THE ENCAPSULATION SHOULD BE INCLUDED IN THE SCOPE OF THE GENERAL conditions in the field and shall advise Fukui Architects, CONTRACTING OFFICER WILL INDICATE AN APPROVAL OR DISAPPROVAL (A) IN PERFORMING THIS CONTRACT, THE CONTRACTOR SHALL: CLEAN AIR AND WATER CONTRACTOR'S WARRANTY WITH RESPECT TO WORK REPAIRED OR CONTRACT. ABATEMENT SHOULD FOLLOW THE SPECIFICATIONS AND Pc of any discrepancies between, additions to, deletions CONSTRUCTION PROGRESS OF THE SHOP DRAWINGS AND IF NOT APPROVED AS SUBMITTED SHALL (1)ENSURE THAT NO LABORER OR MECHANIC SHALL BE REQUIRED TO THE CONTACTOR SHALL COMPLY WITH THE CLEAN AIR ACT, ASAMENDED, REPLACED WILL RUN FOR (ONE YEAR UNLESS RECOMMENDATIONS STATED IN THE REPORT FOR EACH PROPERTY. (A) THE CONTRACTOR SHALL, WITHIN FIVE DAYS AFTER THE WORK INDICATE THE PHA'S REASONS THEREFORE. ANYWORK DONE BEFORE WORK IN SURROUNDINGS OR UNDER WORKING CONDITIONS WHICH ARE 42 USC 7401 ET SEQ., THE FEDERAL WATER POLLUTION CONTROL WATER OTHERWISEINDICATED)FROM THE DATE OF REPAIR OR REPLACEMENT. from, or alterations to any and all conditions prior to COMMENCES ON THE CONTRACT OR ANOTHER PERIOD OF TIME SUCH APPROVAL SHALL BE AT THE CONTRACTOR'S RISK. APPROVAL BY UNSANITARY, HAZARDOUS, OR DANGEROUS TO HIS/HER HEALTH AND/OR ACT, AS AMENDED, 33 U.S.C. 1251ET SEQ., AND STANDARDS ISSUED (D) THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN IF GC SUSPECTS OR ENCOUNTER ANY HAZARDOUS MATERIALS NOT proceeding with any phase of work. Do not scale DETERMINED BY THE CONTRACTING OFFICER, PREPARE AND SUBMIT TO THE CONTRACTING OFFICER SHALL NOT RELIEVE THECONTRACTOR SAFETY AS DETERMINED UNDER CONSTRUCTION SAFETY AND PURSUANT THERE TO IN THE FACILITIES IN WHICH THIS CONTRACT IS TO WRITING, WITHIN A REASONABLE TIME AFTER THE DISCOVERY OFANY INCLUDED IN THE REPORT, GC SHOULD SUBMIT A RFI TO HACP TO TEST drawings. THE CONTRACTING OFFICER FOR APPROVAL THREE COPIES OF A FROM RESPONSIBILITY FOR ANY ERRORS OR OMISSIONS IN SUCH HEALTHSTANDARDS PROMULGATED BY THE SECRETARY OF LABOR BY BE PERFORMED. FAILURE, DEFECT OR DAMAGE. THE SUSPECTED MATERIAL OR AREAS BEFORE REMOVAL. 33.. All work shall be installed in accordance with applicable PRACTICABLE SCHEDULE SHOWING THE ORDER IN WHICH THE DRAWINGS, NOR FROM RESPONSIBILITY FOR COMPLYING WITH THE REGULATION; (2)PROTECT THE LIVES, HEALTH, AND SAFETY OF OTHER HTCH(E) IF THE CONTRACTOR FAILS TO REMEDY ANY FAILURE, DEFECT, codes and regulations. CONTRACTOR PROPOSES TO PERFORM THE WORK, AND THE DATES ON REQUIREMENTS OF THIS CONTRACT, EXCEPT WITH RESPECT TO PERSONS; (3)PREVENT DAMAGE TO PROPERTY, MATERIALS, SUPPLIES, ENERGY EFFICIENCY OR DAMAGE WITHIN A REASONABLE TIME AFTER RECEIPT OF NOTICE, THE ABANDONED OR REMOVED EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES STARTING AND COMPLETING VARIATIONS DESCRIBED AND APPROVED IN ACCORDANCE WITH AND EQUIPMENT; AND, (4)AVOID WORK INTERRUPTIONS. THE CONTRACTOR SHALL COMPLY WITH MANDATORY STANDARDS AND PHA SHALL HAVE THE RIGHT TO REPLACE, REPAIR OR OTHERWISE ALL PLUMBING, DUCT WORK, ROOF TOP UNITS, SEWER & WATER LINES TO 44.. Contractor shall be responsible for the patching, THE SEVERAL SALIENT FEATURES OF THE WORK(INCLUDING ACQUIRING (F)BELOW. (B) FOR THESE PURPOSES, THE CONTRACTOR SHALL: (1)COMPLY WITH POLICIES RELATING TO ENERGY EFFICIENCY WHICH ARE CONTAINED IN REMEDY THE FAILURE, DEFECT, OR DAMAGE AT THE CONTRACTOR'S BE REMOVED MUST BE CAPPED AND REMOVED TO THE POINT OF repairing, and preparations of all existing floor, wall, and LABOR, MATERIALS, AND EQUIPMENT). THE SCHEDULE SHALL BE IN THE (F)IF SHOP DRAWINGS SHOW VARIATIONS FROM THE CONTRACT REGULATIONS AND STANDARDS ISSUED BY THE SECRETARY OF LABOR THE ENERGY CONSERVATION PLAN ISSUED IN COMPLIANCE WITH THE EXPENSE. CONNECTION TO BUILDING MAIN UTILITY LOCATION - NO EXCEPTIONS. FORM OF A PROGRESS CHART OF SUITABLE SCALE TO INDICATE REQUIREMENTS, THE CONTRACTOR SHALL DESCRIBE SUCH VARIATIONS AT 29 CFR PART 1926. FAILURE TO COMPLY MAY RESULT IN IMPOSITION ENERGY POLICY AND CONSERVATION ACT (PUB.L. 94-163) FOR THE STATE (F) WITH RESPECT TO ALL WARRANTIES, EXPRESS OR IMPLIED, FROM GENERAL CONTRACTOR TO VERIFY WITH HACP REPRESENTATIVE AND ceiling surfaces as required to receive scheduled finishes. APPROPRIATELY THE PERCENTAGE OF WORK SCHEDULED FOR IN WRITING, SEPARATE FROM THE DRAWINGS, AT THE TIME OF OF SANCTIONS PURSUANT TO THE CONTRACT WORK HOURS AND SAFETY IN WHICH THE WORK UNDER THE CONTRACT IS PERFORMED. SUBCONTRACTORS, MANUFACTURERS, OR SUPPLIERS FOR WORK ARCHITECT PRIOR TO ANY SUCH WORK, INCLUDING ROOF 55.. All items shown on drawings are finished construction COMPLETION BY ANY GIVEN DATE DURING THE PERIOD. IF THE SUBMISSION. IF THE ARCHITECT APPROVES ANY SUCH VARIATION AND STANDARDS ACT(PUBLIC LAW 91-54, 83 STAT. 96), 40 U.S.C. 3701 ETSEQ.; PERFORMED AND MATERIALS FURNISHED UNDER THIS CONTRACT,THE PENETRATIONS. EACH PRIME CONTRACTOR SHALL REMOVE ALL THEIR assemblies. Contractor shall provide and install all CONTRACTOR FAILS TO SUBMIT A SCHEDULE WITHIN THE TIME THE CONTRACTING OFFICER CONCURS, THE CONTRACTING OFFICER AND (2)INCLUDE THE TERMS OF THIS CLAUSE IN EVERY SUBCONTRACT INSPECTION AND ACCEPTANCE OF CONSTRUCTION CONTRACTOR SHALL: RESPECTIVE EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PLUMBING PRESCRIBED, THE CONTRACTING OFFICER MAY WITHHOLD APPROVAL OF SHALL ISSUE AN APPROPRIATE MODIFICATION TO THE CONTRACT, SO THAT SUCH TERMS WILL BE BINDING ON EACH SUBCONTRACTOR. (A)DEFINITIONS. AS USED IN THIS CLAUSE- (1) "ACCEPTANCE" MEANS THE (1) OBTAIN ALL WARRANTIES THAT WOULD BE GIVEN IN FIXTURES, PIPING SYSTEMS, WIRING, ETC., NOT BEING REUSED.... DO NOT material required for finished assemblies. PROGRESS PAYMENTS OR TAKE OTHER REMEDIES UNDER THE EXCEPT THAT,IF THE VARIATION IS MINOR OR DOES NOT INVOLVE A (C) THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ACT OF AN AUTHORIZED REPRESENTATIVE OF THE PHA BY WHICH THE NORMALCOMMERCIAL PRACTICE; (2) REQUIRE ALL WARRANTIES TO BE ABANDON IN PLACE. 66.. All reports, plans, specifications, computer files, field CONTRACT UNTIL THE CONTRACTOR SUBMITS THE REQUIRED SCHEDULE. CHANGE IN PRICE OR IN TIME OF PERFORMANCE, A MODIFICATION NEED EXPOSURE DATA ON ALL ACCIDENTS INCIDENT TO WORK PERFORMED PHA APPROVES AND ASSUMES OWNERSHIP OF THE WORK PERFORMED EXECUTED IN WRITING, FOR THEBENEFIT OF THE PHA; AND, (3) ENFORCE data, notices, and other documents and instruments (B) THE CONTRACTOR SHALL ENTER THE ACTUAL PROGRESS ON THE NOT BE ISSUED.(G)IT SHALL BE THE RESPONSIBILITY OF THE UNDER THIS CONTRACT RESULTING IN DEATH, TRAUMATIC UNDER THIS CONTRACT. ACCEPTANCE MAY BE PARTIAL OR COMPLETE. ALL WARRANTIES FOR THE BENEFIT OF THE PHA. EACH PRIME CONTRACTOR IS RESPONSIBLE TO VERIFY VISUALLY ALL prepared by the Architect as instruments of service shall CHART AS REQUIRED BY THE CONTRACTING OFFICER, AND IMMEDIATELY CONTRACTOR TO MAKE TIMELY REQUESTS OF THE PHA FOR SUCH LARGE INJURY,OCCUPATIONAL DISEASE, OR DAMAGE TO PROPERTY, (2) "INSPECTION" MEANS EXAMINING AND TESTING THE WORK (G) IN THE EVENT THE CONTRACTOR'S WARRANTY UNDER PARAGRAPH CONDITIONS RELATIVE TO SERVICE REQUIREMENTS AND CODE DELIVER THREE COPIES OF THE ANNOTATED SCHEDULE TO THE SCALE AND FULL SIZE DRAWINGS, COLOR SCHEMES, AND OTHER MATERIALS,SUPPLIES, OR EQUIPMENT, AND SHALL REPORT THIS DATA IN PERFORMED UNDER THE CONTRACT (INCLUDING, WHEN APPROPRIATE, (A)OF THIS CLAUSE HAS EXPIRED, THE PHA MAY BRING SUIT ATITS OWN CONFORMANCE FOR THIS SPACE, AND TO COORDINATE ALL WITH HACPS remain the property of the Architect. The Architect shall CONTRACTING OFFICER. IF THE CONTRACTING OFFICER DETERMINES, ADDITIONAL INFORMATION,NOT ALREADY IN HIS POSSESSION, WHICH THE MANNER PRESCRIBED BY 29 CFR PART1904. RAW MATERIALS, EQUIPMENT, COMPONENTS, AND INTERMEDIATE EXPENSE TO ENFORCE A SUBCONTRACTOR'S,MANUFACTURER'S OR REPRESENTATIVE, REPORT ANY DEVIATION FROM INFORMATION ON retain all common law statutory, and other reserved UPON THE BASIS OF INSPECTION CONDUCTED PURSUANT TO THE SHALL BE REQUIRED IN THE PLANNING AND PRODUCTION OF THE WORK. (D) THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR OF ANY ASSEMBLIES) TO DETERMINE WHETHER IT CONFORMS TO CONTRACT SUPPLIER'S WARRANTY. DRAWINGS TO ARCHITECT PRIOR TO COMMENCING WORK. FAILURE TO rights, including the copyright thereto. CLAUSE ENTITLED INSPECTION AND ACCEPTANCE OF CONSTRUCTION, SUCH REQUESTS MAY BE SUBMITTED AS THE NEED ARISES, BUT EACH NONCOMPLIANCE WITH THESE REQUIREMENTS AND OF THE CORRECTIVE REQUIREMENTS. (3) "TESTING" MEANS THAT ELEMENT OF INSPECTION (H)UNLESS A DEFECT IS CAUSED BY THE NEGLIGENCE OF THE DO SO WILL RESULT IN CONTRACTOR BEING HELD RESPONSIBLE FOR ANY revisions HEREIN THAT THE CONTRACTOR IS NOT MEETING THE APPROVED SUCH REQUEST SHALL BE FILED IN AMPLE TIME TO PERMIT APPROPRIATE ACTION REQUIRED. THIS NOTICE, WHEN DELIVERED TOTHE CONTRACTOR THAT DETERMINES THE PROPERTIES OR ELEMENTS, INCLUDING CONTRACTOR OR SUBCONTRACTOR OR SUPPLIER AT ANY TIER, COSTS FOR SUBSEQUENT CHARGES. SCHEDULE, THE CONTRACTOR SHALL TAKE STEPS NECESSARY TO ACTION TO BE TAKEN BY ALL PARTIES INVOLVED SO AS TO AVOID DELAY. OR THE CONTRACTOR'S REPRESENTATIVE AT THE SITE OF THE WORK, FUNCTIONAL OPERATION OF MATERIALS, EQUIPMENT, OR THEIR THECONTRACTOR SHALL NOT BE LIABLE FOR THE REPAIR OF ANY DEFECT 1 ISSUE FOR CLIENT REVIEW 02.28.2025 IMPROVE ITS PROGRESS, INCLUDING THOSE THAT MAY BE REQUIRED BY (H)THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER FOR SHALL BE DEEMED SUFFICIENT NOTICE OF THE NON COMPLIANCE AND COMPONENTS, BY THE APPLICATION OF ESTABLISHED SCIENTIFIC OF MATERIAL OR DESIGN FURNISHED BY THE PHA NOR FOR THE REPAIR SELECTIVE DEMOLITION THE CONTRACTING OFFICER, WITHOUT ADDITIONAL COST TO THE PHA. IN APPROVAL FOUR COPIES (UNLESS OTHERWISE INDICATED) OF ALL SHOP CORRECTIVE ACTION REQUIRED. AFTER RECEIVING THE NOTICE, THE PRINCIPLES AND PROCEDURES. OF ANY DAMAGE THAT RESULTS FROM ANY DEFECT IN PHA FURNISHED DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT 2 ISSUE FOR BID AND PERMIT 09.24.2025 THIS CIRCUMSTANCE,THE CONTRACTING OFFICER MAY REQUIRE THE DRAWINGS AS CALLED FOR UNDER THE VARIOUS HEADINGS OF THESE CONTRACTOR SHALL IMMEDIATELY TAKE CORRECTIVE ACTION. IF THE (B) THE CONTRACTOR SHALL MAINTAIN AN ADEQUATE INSPECTION MATERIAL OR DESIGN. REQUIRED BY NEW CONSTRUCTION AND AS INDICATED ON THE CONTRACTOR TO INCREASE THE NUMBER OF SHIFTS, OVERTIME SPECIFICATIONS. THREE SETS (UNLESS OTHERWISE INDICATED) OF ALL CONTRACTOR FAILS OR REFUSES TO TAKE CORRECTIVE ACTION SYSTEM AND PERFORM SUCH INSPECTIONS AS WILL ENSURE THAT THE (I)NOTWITHSTANDING ANY PROVISIONS HEREIN TO THE CONTRARY, THE DRAWINGS. USE METHODS REQUIRED TO COMPLETE THE WORK WITHIN 3 ISSUE FOR ZDR REVISIONS 01.07.2026 OPERATIONS, DAYS OF WORK, AND/OR THE AMOUNT OF CONSTRUCTION SHOP DRAWINGS, WILL BE RETAINED BY THE PHA AND ONE SET WILL BE PROMPTLY, THE CONTRACTING OFFICER MAY ISSUE ANORDER STOPPING WORK PERFORMED UNDER THE CONTRACT CONFORMS TO CONTRACT ESTABLISHMENT OF THE TIME PERIODS IN PARAGRAPHS (A) AND(C) LIMITATIONS OF GOVERNING REGULATIONS. PLANT, AND TO SUBMIT FOR APPROVAL ANY SUPPLEMENTARY SCHEDULE RETURNED TO THE CONTRACTOR. AS REQUIRED BY THE CONTRACTING ALL OR PART OF THE WORK UNTIL SATISFACTORY CORRECTIVE ACTION REQUIREMENTS. ALL WORK IS SUBJECT TO PHA INSPECTION AND TEST AT ABOVE RELATE ONLY TO THE SPECIFIC OBLIGATION OF THE 4 IFC & IFB 05.19.2026 OR SCHEDULES IN CHART FORM AS THE CONTRACTING OFFICER DEEMS OFFICER, THE CONTRACTOR, UPONCOMPLETING THE WORK UNDER THIS HAS BEEN TAKEN. THE CONTRACTOR SHALL NOT BASE ANY CLAIM OR ALL PLACES AND AT ALL REASONABLE TIMES BEFORE ACCEPTANCE TO CONTRACTOR TO CORRECT THE WORK, AND HAVE NO RELATIONSHIPTO CONDUCT SELECTIVE DEMOLITION AND DEBRIS-REMOVAL OPERATIONS NECESSARY TO DEMONSTRATE HOW THE APPROVED RATE OF CONTRACT, SHALL FURNISH A COMPLETE SET OF ALL SHOP DRAWINGS REQUEST FOR EQUITABLE ADJUSTMENT FOR ADDITIONAL TIME OR ENSURE STRICT COMPLIANCE WITH THE TERMS OF THE CONTRACT. THE TIME WITHIN WHICH ITS OBLIGATION TO COMPLY WITH THE TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, PROGRESS WILL BE REGAINED. AS FINALLY APPROVED.THESE DRAWINGS SHALL SHOW ALL CHANGES MONEY ON ANY STOP ORDER ISSUED UNDER THESE CIRCUMSTANCES. (C) PHA INSPECTIONS AND TESTS ARE FOR THE SOLE BENEFIT OF THE CONTRACT MAY BE SOUGHT TO BE ENFORCED, NOR TO THE TIME WITHIN WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES. (C) FAILURE OF THE CONTRACTOR TO COMPLY WITH THE AND REVISION SMADE UP TO THE TIME THE WORK IS COMPLETED AND (E) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS PHA AND DO NOT: (1) RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR WHICH PROCEEDINGS MAY BE COMMENCED TO ESTABLISH THE REQUIREMENTSOF THE CONTRACTING OFFICER UNDER THIS CLAUSE ACCEPTED. SUBCONTRACTORS' COMPLIANCE WITH THE PROVISIONS OF THIS PROVIDING ADEQUATE QUALITY CONTROL MEASURES; (2) RELIEVE THE CONTRACTOR'S LIABILITY WITH RESPECT TO ITS OBLIGATION OTHER PROTECT CONSTRUCTION INDICATED TO REMAIN AGAINST DAMAGE AND SHALL BE GROUNDS FOR A DETERMINATION BY THE CONTRACTING (I)THIS CLAUSE SHALL BE INCLUDED IN ALL SUBCONTRACTS AT ANY TIER. CLAUSE. THE CONTRACTOR SHALL TAKE SUCH ACTION WITH RESPECT TO CONTRACTOR OF RESPONSIBILITY FOR LOSS OR DAMAGE OF THE THAN SPECIFICALLY TO CORRECT THE WORK. SOILING DURING SELECTIVE DEMOLITION. WHEN PERMITTED BY OFFICER THAT THE CONTRACTOR IS NOT PROSECUTING THE WORK WITH IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ANY SUBCONTRACT AS THE PHA, THE SECRETARY OF HOUSING AND MATERIAL BEFORE ACCEPTANCE; (3) CONSTITUTE OR IMPLY (J)THIS WARRANTY SHALL NOT LIMIT THE PHA'S RIGHTS UNDER THE ARCHITECT, ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED SUFFICIENT DILIGENCE TO ENSURE COMPLETION WITHIN THE TIME ALL SHOP DRAWINGS PREPARED BY SUBCONTRACTORS ARE SUBMITTED URBAN DEVELOPMENT, OR THE SECRETARY OF LABOR SHALL DIRECT AS ACCEPTANCE; OR, (4) AFFECT THE CONTINUING RIGHTS OF THE PHA INSPECTION AND ACCEPTANCE OF CONSTRUCTION CLAUSE OF THIS STORAGE LOCATION DURING SELECTIVE DEMOLITION AND CLEANED AND SPECIFIED IN THE CONTRACT. UPON MAKING THIS DETERMINATION, THE TO THE CONTRACTING OFFICER. A MEANS OF ENFORCING SUCH PROVISIONS. AFTER ACCEPTANCE OF THE COMPLETED WORK UNDER PARAGRAPH (J) CONTRACT WITH RESPECT TO LATENT DEFECTS, GROSS MISTAKES OR REINSTALLED IN THEIR ORIGINAL LOCATIONS AFTER SELECTIVE CONTRACTING OFFICER MAY TERMINATE THE CONTRACTOR'S RIGHT TO BELOW. FRAUD. DEMOLITION OPERATIONS ARE COMPLETE. EACH INDIVDUAL PRIME PROCEED WITH THE WORK, OR ANY SEPARABLE PART OF IT, IN AS-BUILT DRAWINGS TEMPORARY HEATING (D) THE PRESENCE OR ABSENCE OF THE PHA INSPECTOR DOES NOT CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIING ANY DAMAGE ACCORDANCE WITH THE DEFAULT CLAUSE OF THIS CONTRACT. (A)"AS-BUILTDRAWINGS," AS USED IN THIS CLAUSE, MEANS DRAWINGS THE MECHANICAL CONTRACTOR SHALL PROVIDE AND PAY FOR RELIEVE THE CONTRACTOR FROM ANY CONTRACT REQUIREMENT, NOR IS PROHIBITION AGAINST LIENS CAUSED BY THEIR OWN ACTIVITIES OR REQUIRED DEMOLITION. SUBMITTED BY THE CONTRACTOR OR SUBCONTRACTOR AT ANY TIER TO TEMPORARY HEATING, COVERING, AND ENCLOSURES NECESSARY TO THE INSPECTOR AUTHORIZED TO CHANGE ANY TERM OR CONDITION OF THE CONTRACTOR IS PROHIBITED FROM PLACING A LIEN ON THE PHA'S SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK SHOW THE CONSTRUCTION OF A PARTICULAR STRUCTURE OR WORK AS PROPERLY PROTECT ALL WORK AND MATERIALS AGAINST DAMAGE BY THE SPECIFICATIONS WITHOUT THE CONTRACTING OFFICER'S WRITTEN PROPERTY. THIS PROHIBITION SHALL APPLY TO ALL SUBCONTRACTORS CLEANLINESS OF JOB SITE, PROTECTION OF PREMISES, AFTER HOURS project title (A) THE CONTRACTOR ACKNOWLEDGES THAT IT HAS TAKEN STEPS ACTUALLY COMPLETED UNDER THE CONTRACT. "AS-BUILT DRAWINGS" DAMPNESS AND COLD, TO DRY OUT THE WORK, AND TO FACILITATE THE AUTHORIZATION. ALL INSTRUCTIONS AND APPROVALS WITH RESPECT TO AT ANY TIER AND ALL MATERIALS SUPPLIERS. WORK REASONABLY NECESSARY TO ASCERTAIN THE NATURE AND LOCATION OF SHALL BE SYNONYMOUS WITH "RECORD DRAWINGS." COMPLETION OF THE WORK. ANY PERMANENT HEATING EQUIPMENT THE WORK SHALL BE GIVEN TO THECONTRACTOR BY THE CONTRACTING THE ENTIRE AREA OF WORK IS TO BE MAINTAINED IN A NEAT AND THE WORK, AND THAT IT HAS INVESTIGATED AND SATISFIED ITSELF AS TO (B)AS REQUIRED BY THE CONTRACTING OFFICER, THE CONTRACTOR USED SHALL BE TURNED OVER TO THE PHA IN THE CONDITION AND AT OFFICER. CHANGES ORDERLY MANNER AT ALL TIMES AND POLICED AT THE END OF EACH Owner: THE GENERAL AND LOCAL CONDITIONS WHICH CAN AFFECT THE WORK SHALL PROVIDE THE CONTRACTING OFFICER ACCURATE THE TIME REQUIRED BY THE SPECIFICATIONS. (E)THE CONTRACTOR SHALL PROMPTLY FURNISH, WITHOUT ADDITIONAL (A)THE CONTRACTING OFFICER MAY, AT ANY TIME, WITHOUT NOTICE TO WORK DAY TO PREVENT ACCUMULATION OF TRASH AND DERBRIS. ALL OR ITS COST, INCLUDING BUT NOT LIMITED TO, (1) CONDITIONS BEARING INFORMATIONTO BE USED IN THE PREPARATION OF PERMANENT AS- CHARGE, ALL FACILITIES, LABOR, AND MATERIAL REASONABLY NEEDED THE SURETIES, BY WRITTEN ORDER DESIGNATED OR INDICATED TO BE A MATERIALS SHALL BE DISPOSED FOLLOWING LOCAL REGULATIONS AND HACP UPON TRANSPORTATION, DISPOSAL, HANDLING, AND STORAGE OF BUILTDRAWINGS. FOR THIS PURPOSE, THE CONTRACTOR SHALL RECORD AVAILABILTIY AND USE OF UTILITY SERVICES FOR PERFORMING SUCH SAFE AND CONVENIENT INSPECTIONS AND CHANGE ORDER, MAKE CHANGES IN THE WORK WITHIN THE GENERAL LEGALLY. ALL MATERIALS SHALL BE STACKED NEATLY IN CENTRAL MATERIALS; (2) THE AVAILABILITY OF LABOR, WATER,ELECTRIC POWER, ON ONE SET OF CONTRACT DRAWINGS ALL CHANGES FROM THE (A) THE PHA SHALL MAKE ALL REASONABLY REQUIRED AMOUNTS OF TESTS AS MAY BE REQUIRED BY THE CONTRACTING OFFICER. THE PHA SCOPE OF THE CONTRACT INCLUDING CHANGES: (1) IN THE LOCATIONS APPROVED BY THE HACP AND/OR THE GENERAL 412 Boulevard of the Alies AND ROADS;(3) UNCERTAINTIES OF WEATHER, RIVER STAGES, TIDES, OR INSTALLATIONS ORIGINALLY INDICATED, AND RECORD FINAL UTILITIES AVAILABLE TO THE CONTRACTOR FROM EXISTING OUTLETS MAY CHARGE TO THECONTRACTOR ANY ADDITIONAL COST OF SPECIFICATIONS (INCLUDING DRAWINGS AND DESIGNS); (2) IN THE CONTRACTOR. IF CONTRACTORS DO NOT MAINTAIN PROPER ORDER OR SIMILAR PHYSICAL CONDITIONS AT THE SITE; (4) THE CONFORMATION AND LOCATIONSOF UNDERGROUND LINES BY DEPTH FROM FINISH GRADE AND AND SUPPLIES, AS SPECIFIED IN THE CONTRACT. UNLESS OTHERWISE INSPECTION OR TEST WHEN WORK IS NOT READY AT THE TIME SPECIFIED METHOD OR MANNER OF PERFORMANCE OF THE WORK; (3) PHA- REQUIRE CONTINUED NOTICE TO COMPLY, HEREWITH, HACP MAY AFTER Pittsburgh,PA,15219 CONDITIONS OF THE GROUND; AND (5) THE CHARACTER OF EQUIPMENT BY ACCURATE HORIZONTAL OFFSET DISTANCES TO PERMANENT PROVIDED IN THE CONTRACT, THE AMOUNT OF EACH UTILITY SERVICE BY THE CONTRACTOR FOR INSPECTION OR TEST, OR WHEN PRIOR FURNISHED FACILITIES, EQUIPMENT, MATERIALS,SERVICES, OR SITE; OR, 24 HOURS WRITTEN NOTICE TO THE INDIVIDUAL OFFENDING AND FACILITIES NEEDED PRELIMINARY TO AND DURING WORK SURFACE IMPROVEMENTS SUCH AS BUILDINGS, CURBS, OR EDGES OF CONSUMED SHALL BE CHARGED TO OR PAID FOR BY THE CONTRACTOR REJECTION MAKES REINSPECTION OR RETEST NECESSARY. THE PHA (4)DIRECTING THE ACCELERATION IN THE PERFORMANCE OF THEWORK. CONTRACTOR, HIRE THE NECESSARY LABOR TO ADEQUATELY CLEAN. PERFORMANCE. THE CONTRACTOR ALSO ACKNOWLEDGES THAT IT HAS WALKS. AT PREVAILING RATES CHARGED TO THE PHA OR,WHERE THE UTILITY IS SHALL PERFORM ALL INSPECTIONS AND TESTS IN A MANNER THAT WILL (B) ANY OTHER WRITTEN ORDER OR ORAL ORDER (WHICH, AS USED IN CHARGES FOR SUCH WORK SHALL BE DEDUCTED FROM PAYMENTS DUE SATISFIED ITSELF AS TO THE CHARACTER, QUALITY, AND QUANTITY OF (C)THIS CLAUSE SHALL BE INCLUDED IN ALL SUBCONTRACTS AT ANY TIER. PRODUCED BY THE PHA, AT REASONABLE RATES DETERMINED BY THE NOT UNNECESSARILY DELAY THE WORK. SPECIAL, FULL SIZE, AND THIS PARAGRAPH (B), INCLUDES DIRECTION, THE CONTRACTOR. CONTRACTOR AND HIS/HER SUBCONTRACTORS Project Location: SURFACE AND SUBSURFACE MATERIALS OR OBSTACLES TO BE IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT CONTRACTING OFFICER. THE CONTRACTOR SHALL CAREFULLY PERFORMANCE TESTS SHALL BE PERFORMED AS DESCRIBED IN THE INSTRUCTION,INTERPRETATION, OR DETERMINATION) FROM THE MUST LEAVE THEIR WORK IN A NEAT AND CLEAN CONDITION READY FOR ENCOUNTERED IN SO FAR AS THIS INFORMATION IS REASONABLY ALL AS-BUILT DRAWINGS PREPARED BY SUBCONTRACTORS ARE CONSERVE ANY UTILITIES FURNISHED WITHOUT CHARGE. CONTRACT. CONTRACTING OFFICER THAT CAUSES A CHANGE SHALL BE TREATED AS WORK TO BE PERFORMED BY OTHERS. THE GENERAL CONTRACTOR Homewood North - Community Center ASCERTAINABLE FROM AN INSPECTION OF THE SITE, INCLUDING ALL SUBMITTED TO THE CONTRACTING OFFICER. (B) THE CONTRACTOR, AT ITS EXPENSE AND IN A MANNER SATISFACTORY (F)THE PHA MAY CONDUCT ROUTINE INSPECTIONS OF THE ACHANGE ORDER UNDER THIS CLAUSE; PROVIDED, THAT THE SHALL PROVIDE DUMPSTERS AS REQUIRED. THE GENERAL CONTRACROT EXPLORATORY WORK DONE BY THE PHA, AS WELL AS FROM THE TO THE CONTRACTING OFFICER, SHALL INSTALL AND MAINTAIN ALL CONSTRUCTION SITE ON A DAILY BASIS. CONTRACTOR GIVES THE CONTRACTING OFFICER WRITTEN NOTICE SHALL PROVIDE PROTECTION OF MATERIAL AND EQUIPMENT, SECURITY HVAC Work Replacement DRAWINGS AND SPECIFICATIONS MADE A PART OFTHIS CONTRACT. ANY MATERIAL AND WORKMANSHIP NECESSARY TEMPORARY CONNECTIONS AND DISTRIBUTION LINES, AND (G)THE CONTRACTOR SHALL, WITHOUT CHARGE, REPLACE OR CORRECT STATING (1) THE DATE, CIRCUMSTANCES AND SOURCE OF THEORDER MEASURES, OF THE WORK AREA FOR THE DURATION OF THE CONTRACT. FAILURE OF THE CONTRACTOR TO TAKE THE ACTIONS DESCRIBED AND (A)ALL EQUIPMENT, MATERIAL, AND ARTICLES FURNISHED UNDER THIS ALL METERS REQUIRED TO MEASURE THE AMOUNT OF EACH UTILITY WORK FOUND BY THE PHA NOT TO CONFORM TO CONTRACT AND (2) THAT THE CONTRACTOR REGARDS THE ORDER AS ACHANGE 10 Albertice St. ACKNOWLEDGED IN THIS PARAGRAPH WILL NOT RELIEVE THE CONTRACT SHALL BE NEW AND OF THE MOST SUITABLE GRADE FORTHE USED FOR THE PURPOSE OF DETERMINING CHARGES. BEFORE FINAL REQUIREMENTS, UNLESS THE PHA DECIDES THAT IT IS IN ITS INTEREST ORDER. PRESERVATION OF EXISTING SPRINKLER SYSTEM CONTRACTOR FROM RESPONSIBILITY FOR ESTIMATING PROPERLY THE PURPOSE INTENDED, UNLESS OTHERWISE SPECIFICALLY PROVIDED IN ACCEPTANCE OF THE WORK BY THE PHA, THE CONTRACTOR SHALL TO ACCEPT THE WORK WITH AN APPROPRIATE ADJUSTMENT IN (C) EXCEPT AS PROVIDED IN THIS CLAUSE, NO ORDER, STATEMENT OR THE EXISTING SPRINKLER SYSTEM IS TO REMAIN IN PLACE THROUGHOUT Pittsburgh, PA 15208 DIFFICULTY AND COST OF SUCCESSFULLY PERFORMING THE WORK, OR THIS CONTRACT. REFERENCES IN THE CONTRACT TO EQUIPMENT, REMOVE ALL THE TEMPORARY CONNECTIONS, DISTRIBUTION LINES, CONTRACT PRICE. THE CONTRACTOR SHALL PROMPTLY SEGREGATE AND CONDUCT OF THE CONTRACTING OFFICER SHALL BE TREATED AS A THE DURATION OF CONSTRUCTION. IN THE EVENT THAT CONTRACTOR FOR PROCEEDING TO SUCCESSFULLY PERFORM THE WORK WITHOUT MATERIAL, ARTICLES, OR PATENTED PROCESSES BY TRADE NAME, MAKE, METERS, AND ASSOCIATED PARAPHERNALIA. REMOVE REJECTED MATERIAL FROM THE PREMISES. CHANGE UNDER THIS CLAUSE OR ENTITLE THE CONTRACTOR TO AN AND/OR SUBCONTRACTORS INFLICT ANY DEGREE OF DAMAGE TO THIS ADDITIONAL EXPENSE TO THE PHA. OR CATALOG NUMBER, SHALL BE REGARDED AS ESTABLISHING A (H)IF THE CONTRACTOR DOES NOT PROMPTLY REPLACE OR CORRECT EQUITABLE ADJUSTMENT. EXISTING SYSTEM, THE CONTRACTOR IS LIABLE FOR THE REPLACEMENT (B) THE PHA ASSUMES NO RESPONSIBILITY FOR ANY CONCLUSIONS OR STANDARD OF QUALITY AND SHALL NOT BE CONSTRUED AS LIMITING PROTECTION OF EXISTING VEGETATION, STRUCTURES,EQUIPMENT, REJECTED WORK, THE PHA MAY (1) BY CONTRACT OR OTHERWISE, (D) IF ANY CHANGE UNDER THIS CLAUSE CAUSES AN INCREASE OR OF THE SYSTEM. THE CONTRACTOR'S RESPONSIBILITY SHALL INCLUDE: INTERPRETATIONS MADE BY THE CONTRACTOR BASED ON THE COMPETITION. THE CONTRACTOR MAY, AT ITS OPTION, USE ANY UTILITIES, AND IMPROVEMENTS REPLACE OR CORRECT THE WORK AND CHARGE THE COST TO THE DECREASE IN THE CONTRACTOR'S COST OF, OR THE TIME REQUIRED FOR 1. PAYMENT AND COORDINATION OF REINSTALLMENT OF INFORMATION MADE AVAILABLE BY THE PHA. NOR DOES THEPHA ASSUME EQUIPMENT, MATERIAL, ARTICLE, ORPROCESS THAT, IN THE JUDGMENT (A) THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL CONTRACTOR, OR (2) TERMINATE FOR DEFAULT THE CONTRACTOR'S THE PERFORMANCE OF ANY PART OF THE WORK UNDER THIS CONTRACT, SPRINKLER SYSTEM. RESPONSIBILITY FOR ANY UNDERSTANDING REACHED OR OF, AND AS APPROVED BY THE CONTRACTING OFFICER, IS EQUAL TO STRUCTURES,EQUIPMENT, AND VEGETATION (SUCH AS TREES, SHRUBS, RIGHT TO PROCEED. WHETHER OR NOT CHANGED BY ANY SUCH ORDER, THE CONTRACTING 2. PAYMENT AND COORDINATION OF A FIRE WATCH REPRESENTATION MADE CONCERNING CONDITIONS WHICH CAN AFFECT THAT NAMED IN THE SPECIFICATIONS, UNLESS OTHERWISE SPECIFICALLY ANDGRASS) ON OR ADJACENT TO THE WORKSITE, WHICH ARE NOT TO BE (I)IF ANY WORK REQUIRING INSPECTION IS COVERED UP WITHOUT OFFICER SHALL MAKE AN EQUITABLE ADJUSTMENTAND MODIFY THE SERVICE UNTIL THE SPRINKLER SYSTEM IS FULLY THE WORK BY ANY OF ITS OFFICERS OR AGENTS BEFORE THE EXECUTION PROVIDED IN THIS CONTRACT. REMOVED UNDER THIS CONTRACT, AND WHICH DO NOT UNREASONABLY APPROVAL OF THE PHA, IT MUST, IF REQUESTED BY THE CONTRACTING CONTRACT IN WRITING. HOWEVER, EXCEPT FOR A ADJUSTMENT BASED REPAIRED AND FUNCTIONAL. OF THIS CONTRACT, UNLESS THAT UNDERSTANDING OR (B)APPROVAL OF EQUIPMENT AND MATERIALS. INTERFERE WITH THE WORK REQUIRED UNDER THIS CONTRACT. OFFICER, BE UNCOVERED AT THE EXPENSE OF THE CONTRACTOR. IFAT ON DEFECTIVE SPECIFICATIONS, NO PROPOSAL FOR ANY CHANGE UNDER 3. IN THE EVENT THAT THE SPRINKLER SYSTEM IS REPRESENTATION IS EXPRESSLY STATED IN THIS CONTRACT. (1) THE CONTRACTOR SHALL OBTAIN THE CONTRACTING OFFICER'S (B)THE CONTRACTOR SHALL ONLY REMOVE TREES WHEN SPECIFICALLY ANY TIME BEFORE FINAL ACCEPTANCE OF THE ENTIRE WORK, THE PHA PARAGRAPH (B) ABOVE SHALL BE ALLOWED FORANY COSTS INCURRED DAMAGED, THE CONTRACTOR WILL BE FINANCIALLY APPROVAL OF THE MACHINERY AND MECHANICAL AND OTHER AUTHORIZED TO DO SO, AND SHALL AVOID DAMAGING VEGETATION THAT CONSIDERS IT NECESSARY OR ADVISABLE, TO EXAMINE WORK ALREADY MORE THAN 20 DAYS (5 DAYS FOR ORAL ORDERS) BEFORE THE LIABLE FOR ANY RESULTANT DAMAGE TO THE drawing title DIFFERING SITE CONDITIONS EQUIPMENT TO BE INCORPORATED INTO THE WORK. WHEN REQUESTING WILL REMAIN IN PLACE. IF ANY LIMBS OR BRANCHES OF TREES ARE COMPLETED BY REMOVING OR TEARING IT OUT, THE CONTRACTOR, CONTRACTOR GIVES WRITTEN NOTICE PROPERTY AND LOSS OF USE. (A)THE CONTRACTOR SHALL PROMPTLY, AND BEFORE THE CONDITIONS APPROVAL, THE CONTRACTOR SHALL FURNISH TO THE CONTRACTING BROKEN DURING PERFORMANCE OF THIS CONTRACT, OR BY THE SHALL ON REQUEST, PROMPTLY FURNISH ALL NECESSARY FACILITIES, AS REQUIRED. IN THE CASE OF DEFECTIVE SPECIFICATIONS FOR WHICH ARE DISTURBED, GIVE A WRITTEN NOTICE TO THE CONTRACTING OFFICER OFFICER THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND CARELESS OPERATION OF EQUIPMENT, OR BY WORKMEN, THE LABOR, AND MATERIAL. IF SUCH WORK IS FOUND TO BE DEFECTIVE OR THE PHA IS RESPONSIBLE, THE EQUITABLE ADJUSTMENTSHALL INCLUDE CONTRACT CLOSEOUT: Specifications 10-08 Outline OF (1) SUBSURFACE OR LATENT PHYSICAL CONDITIONS AT THE SITE OTHER INFORMATION CONCERNING THE PERFORMANCE, CAPACITY, CONTRACTOR SHALL TRIM THOSE LIMBS OR BRANCHES WITH A NONCONFORMING IN ANY MATERIALRESPECT DUE TO THE FAULT OF THE ANY INCREASED COST REASONABLY INCURRED BY THE CONTRACTOR IN Specifications WHICH DIFFER MATERIALLY FROM THOSE INDICATED IN THIS CONTRACT, NATURE, AND RATING OF THE MACHINERY AND MECHANICAL AND OTHER CLEANCUT AND PAINT THE CUT WITH A TREE-PRUNING COMPOUND AS CONTRACTOR OR ITSSUBCONTRACTORS, THE CONTRACTOR SHALL ATTEMPTING TO COMPLY WITH THE DEFECTIVE SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND HACP'S OR (2)UNKNOWN PHYSICAL CONDITIONS AT THE SITE(S), OF AN UNUSUAL EQUIPMENT.WHEN REQUIRED BY THIS CONTRACT OR BY THE DIRECTED BY THE CONTRACTING OFFICER. DEFRAY ALL THE EXPENSES OF THE EXAMINATION AND OF (E) THE CONTRACTOR MUST ASSERT ITS RIGHT TO AN REPRESENTATIVE TO PERFORM A PRELIMINARY FINAL INSPECTION. A NATURE, WHICH DIFFER MATERIALLY FROM THOSE ORDINARILY CONTRACTINGOFFICER, THE CONTRACTOR SHALL ALSO OBTAIN THE (C) THE CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING SATISFACTORY RECONSTRUCTION. IF, HOWEVER, SUCH WORK IS FOUND ADJUSTMENTUNDER THIS CLAUSE WITHIN 30 DAYS AFTER (1) RECEIPT OF PUNCH LIST OUTLINING WORK TO BE CORRECTED, FINISHED, ENCOUNTERED AND GENERALLY RECOGNIZED AS INHERING IN WORK OF CONTRACTING OFFICER'S APPROVAL OF THE MATERIAL ORARTICLES IMPROVEMENTS AND UTILITIES (1) AT OR NEAR THE WORK SITE AND (2) TO MEET THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTING A WRITTEN CHANGE ORDER UNDER PARAGRAPH (A) OF THIS CLAUSE,OR PERFORMED OR COMPLETED SHALL BE SUBMITTED BY EACH PRIME THE CHARACTER PROVIDED FOR IN THE CONTRACT. WHICH THE CONTRACTOR CONTEMPLATES INCORPORATING INTO THE ON ADJACENT PROPERTY OF A THIRD PARTY, THE LOCATIONS OF WHICH OFFICER SHALL MAKE AN EQUITABLE ADJUSTMENT TO COVER THE COST (2) THE FURNISHING OF A WRITTEN NOTICE UNDER PARAGRAPH(B) OF CONTRACTOR. ALL WORK OUTLINED ON THE INITIAL PUNCH LIST SHALL (B)THE CONTRACTING OFFICER SHALL INVESTIGATE THE SITE WORK. WHEN REQUESTING APPROVAL, THE CONTRACTOR SHALL ARE MADE KNOWN TO OR SHOULD BE KNOWN BY THE CONTRACTOR. OF THE EXAMINATION AND RECONSTRUCTION, INCLUDING, IF THIS CLAUSE, BY SUBMITTING A WRITTEN STATEMENT DESCRIBING THE BE COMPLETED BY THE CONTRACTOR PRIOR TO THE FINAL INSPECTION CONDITIONS PROMPTLY AFTER RECEIVING THE NOTICE. WORK SHALL PROVIDE FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES. PRIOR TO DISTURBING THE GROUND AT THE CONSTRUCTION SITE, THE COMPLETION OF THE WORK WAS THERE BY DELAYED, AN EXTENSION OF GENERAL NATURE AND THE AMOUNT OF THE PROPOSAL. IF THE FACTS AND BEFORE THE PROJECT WILL BE ACCEPTED FOR FINAL COMPLETION. NOT PROCEED AT THE AFFECTED SITE, EXCEPT AT THE CONTRACTOR'S MACHINERY, CONTRACTOR SHALL ENSURE THAT ALL UNDERGROUND UTILITY LINES TIME. JUSTIFY IT, THE CONTRACTING OFFICER MAY EXTEND THE PERIOD FOR AFTER ALL REQUIREMENTS PREPARATORY TO THE FINAL INSPECTION RISK, UNTIL THE CONTRACTING OFFICER HAS PROVIDED WRITTEN EQUIPMENT, MATERIAL, AND ARTICLES THAT DO NOT HAVE THE ARE CLEARLY MARKED. (J)THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, IN SUBMISSION. THE PROPOSAL MAY BE INCLUDED IN THE NOTICE HAVE BEEN COMPLETED, THE CONTRACTOR SHALL NOTIFY THE INSTRUCTIONS TO THE CONTRACTOR. IF THE CONDITIONS DO REQUIRED APPROVAL SHALL BE INSTALLED OR USED AT THE RISK OF (D) THE CONTRACTOR SHALL SHORE UP, BRACE, UNDERPIN, SECURE,AND WRITING, AS TO THE DATE WHEN IN ITS OPINION ALL OR A DESIGNATED REQUIRED UNDER PARAGRAPH (B) ABOVE. NO PROPOSAL BY THE ARCHITECT/ENGINEER TO PERFORM A FINAL INSPECTION. IF ALL THE MATERIALLY SO DIFFER AND CAUSE AN INCREASE OR DECREASE IN THE SUBSEQUENT REJECTION. PROTECT AS NECESSARY ALL FOUNDATIONS AND OTHER PARTS OF PORTION OF THE WORK WILL BE SUBSTANTIALLY COMPLETED AND READY CONTRACTOR FOR AN EQUITABLE ADJUSTMENT SHALL BE ALLOWED IF WORK HAS BEEN COMPLETED, INCLUDING PUNCH LIST ITEMS FROM CONTRACTOR'S COST OF, OR THE TIME REQUIRED FOR, PERFORMING (2) WHEN REQUIRED BY THE SPECIFICATIONS OR THE CONTRACTING EXISTING STRUCTURES ADJACENT TO, ADJOINING, AND IN THE VICINITY FOR INSPECTION. IF THE ARCHITECT DETERMINES THAT THE STATE OF ASSERTED AFTER FINAL PAYMENT UNDER THIS CONTRACT. EARLIER INSPECTIONS, AND NO FURTHER CORRECTIONS ARE REQUIRED, ANY PART OF THE WORK UNDER THIS CONTRACT, WHETHER OR NOT OFFICER, THE CONTRACTOR SHALL SUBMIT APPROPRIATELY MARKED OF THE SITE, WHICH MAY BE AFFECTED BY THE EXCAVATIONS OR OTHER PREPAREDNESS IS AS REPRESENTED, THE PHA WILL PROMPTLY (F) THE CONTRACTOR'S WRITTEN PROPOSAL FOR EQUITABLE THE ARCHITECT SHALL RECOMMEND FINAL ACCEPTANCE OF THE CHANGED AS A RESULT OF THE CONDITIONS, THE CONTRACTOR SHALL SAMPLES (AND CERTIFICATES RELATED TO THEM) FOR APPROVAL AT THE OPERATIONS CONNECTED WITH THE CONSTRUCTION OF THE PROJECT. ARRANGE FOR THE INSPECTION. UNLESS OTHERWISE SPECIFIED IN THE ADJUSTMENT SHALL BE SUBMITTED IN THE FORM OF A LUMP PROJECT WHEN ALL THE CLOSEOUT DOCUMENTS ARE RECEIVED, scale FILE A CLAIM IN WRITING TO THE PHA WITHIN TEN DAYS AFTER RECEIPT CONTRACTOR'S (E) ANY EQUIPMENT TEMPORARILY REMOVED AS A RESULT OF WORK CONTRACT, THE PHA SHALL ACCEPT, AS SOON AS PRACTICABLE AFTER SUMPROPOSAL SUPPORTED WITH AN ITEMIZED BREAKDOWN OF ALL INCLUDING BUT NOT LIMITED TO:WARRANTIES, O&M MANUALS, FINAL SShheeeett NNoo.. As Noted OF SUCH INSTRUCTIONS AND, IN ANY EVENT, BEFORE PROCEEDING WITH EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. THE CONTRACTOR UNDER THIS CONTRACT SHALL BE PROTECTED, CLEANED, AND COMPLETION AND INSPECTION, ALL WORK REQUIRED BY THE CONTRACT INCREASES AND DECREASES IN THE CONTRACT IN AT LEAST THE TESTING, CERTIFICATES, PERMITS, PUNCH LIST, SUBMITTALS, RFIS, AS THE WORK. ANEQUITABLE ADJUSTMENT IN THE CONTRACT PRICE, THE SHALL LABEL, OR OTHERWISE PROPERLY MARK ONTHE CONTAINER, THE OR THAT PORTION OF THE WORK THE CONTRACTING OFFICER FOLLOWING DETAILS: (1)DIRECT COSTS. MATERIALS (LIST INDIVIDUAL date 05.19.2026 A5 no. of. | ||||
|---|---|---|---|---|
| scale As Noted | SShheeeett NNoo.. A5 | |||
| date 05.19.2026 | ||||
| no. | of. | |||
| 5 | 10 | Project #2441 | ||

With GovernmentContracts, you can:
Header Information Bid Number: B2627212 Description: OEM Water Bid Opening Date: 10/31/2026 11:59:00
City of Philadelphia
Bid Due: 10/31/2026
Header Information Bid Number: B2626551 Description: 6x4 CNG Truck with 20HD Compactor Body
City of Philadelphia
Bid Due: 10/07/2026
Project: Parking Garage Development & Elevated Pedestrian Walkway Ref. #: Lehigh-Northampton Airport Authority,
PennBid
Bid Due: 10/07/2026
Project: Main Pump House and Dewatering Improvements Ref. #: Lehigh County Authority, PA
PennBid
Bid Due: 10/16/2026