| Location: | Colorado |
|---|---|
| Posted: | Oct 12, 2025 |
| Due: | Nov 10, 2025 |
| Agency: | Regional Transportation District - Denver |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP 125DM004 |
| Publication URL: | To access bid details, please log in. |
Project ID: RFP 125DM004
Title: Storm Sewer Cleaning and Inspection Program Plan
Addenda: 0
Release Date: 10/10/2025
Due Date: 11/10/2025
RTD is seeking professional assistance with the cleaning, inspecting, and documenting of storm sewer infrastructure that drains to local waterways within a metropolitan transit system setting while complying with Colorado Discharge Permit System (CDPS) regulations.
Program scope entails collaboration with RTD to execute and build upon a CDPS compliant storm sewer cleaning and inspection program plan for all agency owned pipes, catch basins, and stormwater conveyance system features that drain to the South Platte River from rail corridors, stations, platforms, and properties under RTD’s municipal separate storm sewer system (MS4) permit. The plan must specify that at least 20% of the permittee’s MS4 system pipes draining to the South Platte River Segment 14 be cleaned each year, rotating so that all pipes are cleaned within a five-year period. This program will include the CDPS compliant cleaning and inspecting of all RTD owned storm drainage infrastructure on an as needed/on-call basis throughout the agency’s eight county service district. The scope will include assisting RTD in compiling program documentation that includes mapping, inspection reports, condition assessments, cleaning records, and relevant regulatory compliance data.
The program goals are as follows:
Locations include:
Period of Performance:
The Regional Transportation District (RTD) will be responsible for the written "Program Standard" as it is named in this statement of work as the Storm Sewer Cleaning and Inspection Program Plan (SSCIPP). The execution of the SSCIPP’s scope of work and program goals will be through the collaborative efforts of the Contractor and RTD detailed in this statement of work. The SSCIPP will be created in an iterative manner Scope of Work, Locations, Compliance Requirements, Specialized Permitting, Safety Necessities, Local Jurisdictions & Contact Information, Anticipated Schedule & Seasonal Restrictions (ice, excessive rain/snow), and Record Keeping (items like permit milestones met, asset management tracking, and inspection documentation).

With GovernmentContracts, you can: