| Location: | Washington |
|---|---|
| Posted: | Apr 5, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | City of Vancouver |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB 26-14 |
| Publication URL: | To access bid details, please log in. |
Project Description: This Contract provides for the improvement of a new PFAS treatment system that ties into existing water treatment system. Equipment will be installed at the existing facility and include pressure vessels with granular activated carbon for PFAS removal, along with support systems such as rinse water tank, restroom and storage building, modifications to existing booster pumps, associated stormwater, site civil, electrical and instrumentation/control improvements and other work, all in accordance with the attached Plan Set, these Contract
Provisions, and the Standard Specifications, hereafter referred to as “Work.”
The Contract Work shall be Physically Complete within 290 Working Days from the Notice to Proceed. All Contract Work must be completed by December 31, 2027.
Engineer's Estimate - $10,217,000

With GovernmentContracts, you can:
...support required air changes per hour (ACH), filtration standards, pressure relationships, and other...
Quinault Indian Nation
Bid Due: 6/18/2026
..., safety measures, and supervision necessary to complete the project. 1. Surface Preparation ...
Quinault Indian Nation
Bid Due: 6/26/2026