| Location: | California |
|---|---|
| Posted: | Sep 27, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | West Basin Municipal Water District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP-DS-0147 |
| Publication URL: | To access bid details, please log in. |
Project ID: RFP-DS-0147
Title: Server Room Construction at ECLWRF
Addenda: 0
Release Date: 9/24/2026
Due Date: 10/22/2026
Proposals are being accepted by West Basin Municipal Water District (West Basin), a Municipal Water District, for Server Room Construction at ECLWRF . This project aims to convert existing office space into a dedicated server room to support an ongoing Distributed Control System (DCS) Replacement Project where new server equipment will be procured. The new server room should have dedicated air conditioning, environmental monitoring, fire suppression, and power distribution. This server room should be completed before the end of calendar year 2027 to be ready for the new servers.
Location
Edward C. Little Water Recycling Facility (ECLWRF)
1935 S. Hughes Way
El Segundo
CA 90245
• Existing Space: Between 176 to 260 square feet, currently configured as 2 rooms (98 square foot
Office & 78 square foot I/O Room) with the option to include 84 square foot of hallway if required.
• Proposed Use: Server room housing OT/IT and network infrastructure, including racks, UPS systems,
cooling, and fire protection.
• Project Type: Renovation/conversion within an occupied office building.
• Estimated Construction Start: Winter 2026/27
• Estimated Budget: To be determined
The District is undertaking a major control system replacement project (DCS Replacement Project) with a Progressive Design-Build (PDB) approach. The project is currently in the latter stages of the design phase, with a Guaranteed Maximum Price (GMP) proposal anticipated in October 2026. During the design phase of this project, it was identified that the current server room at ECLWRF is insufficient for the new servers that will be installed. A new space has been identified adjacent to the existing server room. This new space is currently a single-occupancy office being used by the District's contract operator.
This project will prepare the existing space as a new server room ready for the new server racks. The new server racks are forecast to be ready for installation in late 2027/early 2028. The new server room should have dedicated air conditioning and an environmental monitoring system, specialist fire suppression (clean agent preferred), sufficient power distribution (including a dedicated UPS if necessary), and other typical server room features. The current office space is configured as one single-occupancy office (98 square feet), one I/O room (78 square feet), with the option to extend the room into an existing hallway (84 square feet). The current control system design anticipates at least one standard 48U server rack and is approximately 50% mature.

With GovernmentContracts, you can:
...Follow Altium Server and Licenses Active Contract Opportunity Notice ID HQ072727QMH03 Related... of ...
DEPT OF DEFENSE
Bid Due: 11/04/2026
...Follow Supermicro 1U rack-mount server assemblies Active Contract Opportunity Notice ID...
ENERGY, DEPARTMENT OF
Bid Due: 11/02/2026
...offices, a technology room for critical server equipment, a reception area, and two ...