| Location: | Arkansas |
|---|---|
| Posted: | Sep 18, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9127S25DA007 |
| Publication URL: | To access bid details, please log in. |
The Contractor, operating as an independent contractor and not as an agent of the Government, shall provide all labor, material, and equipment necessary to perform the professional surveying and mapping work during the period of service as stated in Section C, in connection with performance of surveys and the preparation of such maps as may be required for advance planning, design, and construction on various projects. The Contractor shall furnish the required personnel, equipment, instruments, and transportation, as necessary to accomplish the required services and furnish to the Government reports and other data together with supporting material developed during the field data acquisition process. During the prosecution of the work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.

With GovernmentContracts, you can:
...Project: Owners Representative for Design and Construction of City Facilities Ref. #: 245707 ...
City of Little Rock
Bid Due: 8/12/2026
...qualified firms to provide professional design and installation services for a new playground...
Arkansas Democrat-Gazette
Bid Due: 8/06/2026
...be examined and are obtainable from the office of the Design Professional, Architecture ...
Arkansas Democrat-Gazette
Bid Due: 8/11/2026
...set of the Contract documents should be examined and are obtainable from Ecological ...
Arkansas Democrat-Gazette
Bid Due: 7/28/2026