| Location: | Connecticut |
|---|---|
| Posted: | Aug 6, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 38345 |
| Publication URL: | To access bid details, please log in. |
Sludge Building - Gas Fired Furnace
Removal and disposal of an existing roof-mounted furnace and the furnishing and installation of a new outdoor, natural gas-fired heating and makeup air unit. The basis of design is the Reznor Model RPBL 500, or an approved equivalent unit meeting or exceeding all performance and installation criteria.
Town of Killingly / WPCF Joe Couture 31 Wauregan Rd Killingly CT, 06239 United States Tel: 8607795392 wpcf@killinglyct.gov

With GovernmentContracts, you can:
...Project ID: 26/27-8 Title: SLUDGE TANK REHABILITATION AT HRWPCF RE-BID Addenda: 0 Release ...
Town of Manchester
Bid Due: 9/24/2026
...of the existing Make-Up Air (MUA) Unit located at the Return Activated Sludge ...
Town of Fairfield
Bid Due: 9/23/2026
...Filtration Plant. The scope consists of removing and disposing of the sand/sludge layer, ...
State Government of Connecticut
Bid Due: 10/07/2026
...Plant. The scope consists of removing and disposing of the sand/sludge layer, remove ...
City of Meriden
Bid Due: 10/07/2026