Project Description: This Contract provides for the installation of storm pipe, storm structures, asphalt restoration and other work, all in accordance with the attached Contract Plans, these Contract Provisions and the Standard Specifications.
Contractor s hall furnish and install approximately 7 0’ L F o f 1 2” storm pipe, 1 20 L F o f 12” perforated storm pipe with infiltration trench, 4 standard precast drywells, and (2) 2-filter
cartridge catch basins connected with 8’ pipe and flexible couplers within the street. Contractor shall fill existing swale to grade, remove a ditch inlet, and abandon 1 pipe and 1 manhole.
Contractor shall also restore roadway pavement on completion of construction.
The Contract Work shall be Physically Complete within 45 Working Days from the Notice to Proceed.
Engineer's Estimate - $450,000

With GovernmentContracts, you can:
...Contract SR 20, US 101 I/S to N of Fairmount Rd HFST Contract ...
State Government of Washington
Bid Due: 10/07/2026
...pipe of varying sizes, 250 square yards of HMA pavement, 123 linear feet ...
City of Spokane
Bid Due: 9/29/2026
...pipe of varying sizes, 250 square yards of HMA pavement, 123 linear feet ...
City of Spokane
Bid Due: 9/29/2026
...pipe of varying sizes, 250 square yards of HMA pavement, 123 linear feet ...
City of Spokane
Bid Due: 9/29/2026