Kent Court Water Main Replacement

Location: Georgia
Posted: Jan 21, 2026
Agency: Gwinnett County
Type of Contract: Awards
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: BL106-25
Publication URL: To access bid details, please log in.
  • BL106-25 Award Tabulation

    Kent Court Water Main Replacement

    Award Date : 01/21/2026 03:00 PM EST

  • Attachment Preview

    January 21, 2026
    AWARD NOTICE
    BL106-25
    Kent Court Water Main Replacement
    Pursuant to the bids received on November 21, 2025, for BL106-25, Kent Court Water Main
    Replacement, the bid has been awarded to The Dickerson Group, Inc. in the amount of $1,967,810.38.
    Please note the enclosed bid tabulation.
    We appreciate your bid and interest in Gwinnett County.
    Sincerely,
    Brittany Bryant, CPPB
    Purchasing Manager
    BB/km
    Enclosures
    c:
    Johanna Costley, Department of Water Resources
    Adam Garmon, Department of Water Resources
    Gina Todaro, Department of Water Resources
    Contracts
    BID TABULATION
    BL106-25
    Kent Court Water Main Replacement
    Department of Water Resources
    Anderson Grading and Pipeline, LLC Civil Construction & Utilities, LLC
    (OC)
    (OC)
    ITEM #
    DESCRIPTION
    QTY.
    BASE BID ITEMS
    BB-01 Project Record Drawings
    BB-02 Site Restoration
    BB-03
    BB-04
    BB-05
    BB-06
    Class A Concrete
    Erosion Sedimentation and Pollution Controlls - Temporary Silt Fence
    Type 'NS (Sd1)
    Erosion Sedimentation and Pollution Controlls - Inlet Sediment Trap,
    Paved Areas (Sd2-P)
    Erosion and Sediment Controls Mulch Ds1
    1 LS
    1 LS
    10 CY
    220 LF
    15 EA
    200 TN
    BB-07 Erosion Sedimentation and Pollution Controls - Temp Seeding (Ds2) 1,225 SY
    BB-08 Construction Exit
    1 EA
    BB-09 Asphaltic Concrete 9.5mm Superpave
    1,700 TN
    BB-10 Asphaltic Concrete 19mm Superpave (4" Binder)
    800 TN
    BB-11 Full Depth Reclamation Pavement (FDR)
    12,300 SY
    BB-12 Graded Aggregate Base (GAB) 10"
    4,100 TN
    BB-13 Curb/Combination Curb & Gutter
    1,000 LF
    BB-14 Sidewalk Restoration
    50 SY
    BB-15 Permanent Seeding
    1,225 SY
    BB-16 Sodding
    2,000 SY
    BB-17 Precast Concrete Utility Structures - Adjust Frame & Cover
    13 EA
    BB-18
    BB-19
    BB-20
    BB-21
    BB-22
    Ductile Iron Pipe (Water) - 8-Inch
    Ductile Iron Pipe (Water) - 12-Inch
    Water Utility Distribution Valves - 6-Inch Gate Valves
    Water Utility Distribution Valves - 8-Inch Gate Valves
    Water Utility Distribution Valves -12-Inch Gate Valves
    5,600 LF
    950 LF
    1 EA
    12 EA
    2 EA
    BB-23 Water Service Short Side
    40 EA
    BB-24 Water Service Long Side
    54 EA
    BB-25 Fire Hydrant Assembly
    16 EA
    BB-26 Traffic Control Devices
    1 LS
    BB-27 Asphaltic Concrete Speed Table
    4 EA
    BASE BID ITEMS TOTAL
    EXTRA WORK ITEMS
    EW-01 Traffic Control - Police Officers
    1,150 HR
    EW-02 Variable Message Signs
    90 DAY
    EW-03 Exploratory Excavations
    10 EA
    EW-04 Debris Removal
    60 TN
    EW-05 Additional Pipe Bedding
    225 TN
    EW-06 Tree Replacement
    20 EA
    EW-07 Relocate Existing Water Service Meter
    10 EA
    EW-08 6" x 6" Tapping Sleeve and Valve
    1 EA
    EW-09 Additional DIP Fittings
    2,000 LB
    EXTRA WORK ITEMS TOTAL
    OVERALL TOTAL (BASE BID + EXTRA WORK)
    UNIT PRICE
    TOTAL PRICE
    $16,130.00
    $14,286.00
    $823.00
    $3.00
    $16,130.00
    $14,286.00
    $8,230.00
    $660.00
    $161.00
    $2,415.00
    $2.00
    $400.00
    $2.00
    $2,450.00
    $2,493.00
    $2,493.00
    $199.00
    $338,300.00
    $172.00
    $137,600.00
    $28.00
    $344,400.00
    $64.00
    $262,400.00
    $50.00
    $50,000.00
    $148.00
    $7,400.00
    $4.00
    $4,900.00
    $19.00
    $38,000.00
    $710.00
    $9,230.00
    $204.00
    $237.00
    $3,466.00
    $4,293.00
    $7,449.00
    $1,142,400.00
    $225,150.00
    $3,466.00
    $51,516.00
    $14,898.00
    $1,336.00
    $53,440.00
    $1,642.00
    $88,668.00
    $8,986.00
    $143,776.00
    $10,753.00
    $10,753.00
    $4,974.00
    $19,896.00
    $2,993,257.00
    $65.00
    $74,750.00
    $164.00
    $14,760.00
    $2,487.00
    $24,870.00
    $126.00
    $7,560.00
    $55.00
    $12,375.00
    $475.00
    $9,500.00
    $1,336.00
    $13,360.00
    $8,830.00
    $8,830.00
    $17.00
    $34,000.00
    $200,005.00
    $3,193,262.00
    UNIT PRICE
    TOTAL PRICE
    $17,000.00
    $15,000.00
    $400.00
    $3.50
    $17,000.00
    $15,000.00
    $4,000.00
    $770.00
    $115.00
    $1,725.00
    $0.01
    $2.00
    $0.25
    $306.25
    $2,000.00
    $2,000.00
    $160.00
    $272,000.00
    $192.00
    $153,600.00
    $18.50
    $227,550.00
    $60.00
    $246,000.00
    $35.00
    $35,000.00
    $57.50
    $2,875.00
    $0.30
    $367.50
    $12.00
    $24,000.00
    $425.00
    $5,525.00
    $92.00
    $124.00
    $1,730.00
    $3,000.00
    $4,100.00
    $515,200.00
    $117,800.00
    $1,730.00
    $36,000.00
    $8,200.00
    $755.00
    $30,200.00
    $1,700.00
    $91,800.00
    $6,728.00
    $107,648.00
    $7,500.00
    $7,500.00
    $7,000.00
    $28,000.00
    $1,951,798.75
    $65.00
    $74,750.00
    $90.00
    $8,100.00
    $1.00
    $10.00
    $30.00
    $1,800.00
    $1.00
    $225.00
    $275.00
    $5,500.00
    $250.00
    $2,500.00
    $5,252.00
    $5,252.00
    $0.01
    $20.00
    $98,157.00
    $2,049,955.75
    F.S. Scarbrough, LLC
    (OC)
    UNIT PRICE
    TOTAL PRICE
    $5,830.00
    $8,745.00
    $390.46
    $3.50
    $5,830.00
    $8,745.00
    $3,904.60
    $770.00
    $173.73
    $2,605.95
    $1,020.25
    $204,050.00
    $0.47
    $575.75
    $3,203.96
    $3,203.96
    $297.69
    $506,073.00
    $163.60
    $130,880.00
    $54.27
    $667,521.00
    $100.53
    $412,173.00
    $91.76
    $91,760.00
    $279.69
    $13,984.50
    $0.52
    $637.00
    $17.49
    $34,980.00
    $3,277.47
    $42,607.11
    $168.03
    $192.22
    $2,977.12
    $4,274.92
    $6,757.07
    $940,968.00
    $182,609.00
    $2,977.12
    $51,299.04
    $13,514.14
    $2,073.44
    $82,937.60
    $3,971.27
    $214,448.58
    $8,316.54
    $133,064.64
    $29,150.00
    $29,150.00
    $5,461.57
    $21,846.28
    $3,803,115.27
    $65.00
    $74,750.00
    $145.75
    $13,117.50
    $711.88
    $7,118.80
    $192.24
    $11,534.40
    $148.59
    $33,432.75
    $1,077.79
    $21,555.80
    $1,922.38
    $19,223.80
    $12,641.79
    $12,641.79
    $15.44
    $30,880.00
    $224,254.84
    $4,027,370.11
    Georgia Sewer and Storm, LLC
    (L)
    UNIT PRICE
    TOTAL PRICE
    $15,000.00
    $30,000.00
    $300.00
    $4.50
    $15,000.00
    $30,000.00
    $3,000.00
    $990.00
    $190.00
    $2,850.00
    $95.00
    $19,000.00
    $1.25
    $1,531.25
    $1,500.00
    $1,500.00
    $163.05
    $277,185.00
    $164.56
    $131,648.00
    $61.73
    $759,279.00
    $55.00
    $225,500.00
    $45.00
    $45,000.00
    $75.00
    $3,750.00
    $1.50
    $1,837.50
    $10.00
    $20,000.00
    $3,200.00
    $41,600.00
    $105.00
    $128.00
    $2,150.00
    $2,600.00
    $4,200.00
    $588,000.00
    $121,600.00
    $2,150.00
    $31,200.00
    $8,400.00
    $1,350.00
    $54,000.00
    $1,750.00
    $94,500.00
    $6,550.00
    $104,800.00
    $15,000.00
    $15,000.00
    $7,925.50
    $31,702.00
    $2,631,022.75
    $65.00
    $74,750.00
    $70.00
    $6,300.00
    $2,000.00
    $20,000.00
    $200.00
    $12,000.00
    $40.00
    $9,000.00
    $225.00
    $4,500.00
    $1,550.00
    $15,500.00
    $5,400.00
    $5,400.00
    $25.00
    $50,000.00
    $197,450.00
    $2,828,472.75
    GS Construction, Inc.
    (L)
    UNIT PRICE
    TOTAL PRICE
    $20,000.00
    $25,000.00
    $380.00
    $4.00
    $20,000.00
    $25,000.00
    $3,800.00
    $880.00
    $240.00
    $3,600.00
    $990.00
    $198,000.00
    $1.50
    $1,837.50
    $4,500.00
    $4,500.00
    $200.00
    $340,000.00
    $220.00
    $176,000.00
    $48.00
    $590,400.00
    $62.00
    $254,200.00
    $34.00
    $34,000.00
    $74.00
    $3,700.00
    $1.80
    $2,205.00
    $24.00
    $48,000.00
    $1,040.00
    $13,520.00
    $165.00
    $200.00
    $2,934.00
    $3,463.00
    $5,805.00
    $924,000.00
    $190,000.00
    $2,934.00
    $41,556.00
    $11,610.00
    $1,324.00
    $52,960.00
    $1,492.00
    $80,568.00
    $8,281.00
    $132,496.00
    $52,169.00
    $52,169.00
    $11,000.00
    $44,000.00
    $3,251,935.50
    $65.00
    $74,750.00
    $165.00
    $14,850.00
    $1,000.00
    $10,000.00
    $155.00
    $9,300.00
    $70.00
    $15,750.00
    $1,300.00
    $26,000.00
    $1,050.00
    $10,500.00
    $7,800.00
    $7,800.00
    $4.50
    $9,000.00
    $177,950.00
    $3,429,885.50
    Page 1 of 2
    JDS, Inc.
    (L)
    UNIT PRICE
    TOTAL PRICE
    $2,500.00
    $5,000.00
    $300.00
    $5.00
    $2,500.00
    $5,000.00
    $3,000.00
    $1,100.00
    $200.00
    $3,000.00
    $1.00
    $200.00
    $0.60
    $735.00
    $4,000.00
    $4,000.00
    $160.00
    $272,000.00
    $170.00
    $136,000.00
    $45.00
    $553,500.00
    $30.00
    $123,000.00
    $80.00
    $80,000.00
    $110.00
    $5,500.00
    $2.00
    $2,450.00
    $20.00
    $40,000.00
    $2,500.00
    $32,500.00
    $180.00
    $212.00
    $1,900.00
    $2,500.00
    $4,200.00
    $1,008,000.00
    $201,400.00
    $1,900.00
    $30,000.00
    $8,400.00
    $750.00
    $30,000.00
    $1,900.00
    $102,600.00
    $5,900.00
    $94,400.00
    $39,720.00
    $39,720.00
    $8,500.00
    $34,000.00
    $2,814,905.00
    $65.00
    $74,750.00
    $70.00
    $6,300.00
    $250.00
    $2,500.00
    $1.00
    $60.00
    $1.00
    $225.00
    $1,000.00
    $20,000.00
    $400.00
    $4,000.00
    $3,500.00
    $3,500.00
    $0.01
    $20.00
    $111,355.00
    $2,926,260.00
    km
    BID TABULATION
    BL106-25
    Kent Court Water Main Replacement
    Department of Water Resources
    Mid-South Builders, Inc.
    (OC)
    ITEM #
    DESCRIPTION
    QTY.
    UNIT PRICE
    TOTAL PRICE
    BASE BID ITEMS
    BB-01 Project Record Drawings
    BB-02 Site Restoration
    BB-03
    BB-04
    BB-05
    BB-06
    Class A Concrete
    Erosion Sedimentation and Pollution Controlls - Temporary Silt Fence
    Type 'NS (Sd1)
    Erosion Sedimentation and Pollution Controlls - Inlet Sediment Trap,
    Paved Areas (Sd2-P)
    Erosion and Sediment Controls Mulch Ds1
    1 LS
    1 LS
    10 CY
    220 LF
    15 EA
    200 TN
    $500.00
    $2,500.00
    $350.00
    $12.00
    $200.00
    $0.01
    $500.00
    $2,500.00
    $3,500.00
    $2,640.00
    $3,000.00
    $2.00
    BB-07 Erosion Sedimentation and Pollution Controls - Temp Seeding (Ds2) 1,225 SY
    $0.01
    $12.25
    BB-08 Construction Exit
    1 EA
    $0.01
    $0.01
    BB-09 Asphaltic Concrete 9.5mm Superpave
    1,700 TN
    $200.00
    $340,000.00
    BB-10 Asphaltic Concrete 19mm Superpave (4" Binder)
    BB-11 Full Depth Reclamation Pavement (FDR)
    800 TN
    12,300 SY
    $175.00
    $45.00
    $140,000.00
    $553,500.00
    BB-12 Graded Aggregate Base (GAB) 10"
    BB-13 Curb/Combination Curb & Gutter
    4,100 TN
    1,000 LF
    $30.00
    $35.00
    $123,000.00
    $35,000.00
    BB-14 Sidewalk Restoration
    50 SY
    $150.00
    $7,500.00
    BB-15 Permanent Seeding
    BB-16 Sodding
    1,225 SY
    2,000 SY
    $0.01
    $12.00
    $12.25
    $24,000.00
    BB-17 Precast Concrete Utility Structures - Adjust Frame & Cover
    BB-18 Ductile Iron Pipe (Water) - 8-Inch
    BB-19 Ductile Iron Pipe (Water) - 12-Inch
    BB-20 Water Utility Distribution Valves - 6-Inch Gate Valves
    BB-21 Water Utility Distribution Valves - 8-Inch Gate Valves
    BB-22 Water Utility Distribution Valves -12-Inch Gate Valves
    13 EA
    5,600 LF
    950 LF
    1 EA
    12 EA
    2 EA
    $700.00
    $310.00
    $328.00
    $2,750.00
    $3,000.00
    $5,000.00
    $9,100.00
    $1,736,000.00
    $311,600.00
    $2,750.00
    $36,000.00
    $10,000.00
    BB-23 Water Service Short Side
    BB-24 Water Service Long Side
    40 EA
    54 EA
    $1,200.00
    $2,000.00
    $48,000.00
    $108,000.00
    BB-25 Fire Hydrant Assembly
    16 EA
    $7,500.00
    $120,000.00
    BB-26 Traffic Control Devices
    BB-27 Asphaltic Concrete Speed Table
    1 LS
    4 EA
    BASE BID ITEMS TOTAL
    $35,483.49
    $35,483.49
    $2,500.00
    $10,000.00
    $3,662,100.00
    EXTRA WORK ITEMS
    EW-01 Traffic Control - Police Officers
    1,150 HR
    $65.00
    $74,750.00
    EW-02 Variable Message Signs
    EW-03 Exploratory Excavations
    90 DAY
    10 EA
    $75.00
    $500.00
    $6,750.00
    $5,000.00
    EW-04 Debris Removal
    EW-05 Additional Pipe Bedding
    60 TN
    225 TN
    $40.00
    $60.00
    $2,400.00
    $13,500.00
    EW-06 Tree Replacement
    20 EA
    $500.00
    $10,000.00
    EW-07 Relocate Existing Water Service Meter
    EW-08 6" x 6" Tapping Sleeve and Valve
    10 EA
    1 EA
    $250.00
    $5,500.00
    $2,500.00
    $5,500.00
    EW-09 Additional DIP Fittings
    2,000 LB
    EXTRA WORK ITEMS TOTAL
    $6.00
    $12,000.00
    $132,400.00
    OVERALL TOTAL (BASE BID + EXTRA WORK)
    $3,794,500.00
    Recommended Vendor:
    The Dickerson Group, Inc.
    Attn: Michael Coats
    871 Old Peachtree Road, NW
    Lawrenceville, GA 30043
    770-513-4558
    Michael.Coats@DickersonGroup.net
    PO Boys Plumbing, Inc.
    (OC)
    UNIT PRICE
    TOTAL PRICE
    $10,000.00
    $150,000.00
    $350.00
    $5.00
    $10,000.00
    $150,000.00
    $3,500.00
    $1,100.00
    $350.00
    $5,250.00
    $250.00
    $50,000.00
    $1.00
    $1,225.00
    $2,250.00
    $2,250.00
    $175.00
    $297,500.00
    $200.00
    $160,000.00
    $25.00
    $307,500.00
    $65.00
    $266,500.00
    $75.00
    $75,000.00
    $150.00
    $7,500.00
    $2.00
    $2,450.00
    $25.00
    $50,000.00
    $3,500.00
    $45,500.00
    $150.00
    $200.00
    $1,945.00
    $2,795.00
    $4,920.00
    $840,000.00
    $190,000.00
    $1,945.00
    $33,540.00
    $9,840.00
    $1,175.00
    $47,000.00
    $2,500.00
    $135,000.00
    $8,950.00
    $143,200.00
    $90,000.00
    $90,000.00
    $11,495.00
    $45,980.00
    $2,971,780.00
    $65.00
    $74,750.00
    $200.00
    $18,000.00
    $350.00
    $3,500.00
    $50.00
    $3,000.00
    $50.00
    $11,250.00
    $2,750.00
    $55,000.00
    $1,000.00
    $10,000.00
    $6,000.00
    $6,000.00
    $5.00
    $10,000.00
    $191,500.00
    $3,163,280.00
    Site Engineering, Inc.
    (OC)
    Summit Construction & Development,
    LLC
    (L)
    UNIT PRICE
    TOTAL PRICE
    UNIT PRICE
    TOTAL PRICE
    The Dickerson Group, Inc.
    (L)
    UNIT PRICE
    TOTAL PRICE
    $15,000.00
    $25,000.00
    $500.00
    $5.00
    $15,000.00
    $25,000.00
    $5,000.00
    $1,100.00
    $200.00
    $3,000.00
    $0.01
    $2.00
    $0.01
    $12.25
    $3,500.00
    $3,500.00
    $315.00
    $535,500.00
    $224.00
    $179,200.00
    $38.00
    $467,400.00
    $65.00
    $266,500.00
    $70.00
    $70,000.00
    $100.00
    $5,000.00
    $5.00
    $6,125.00
    $31.00
    $62,000.00
    $2,500.00
    $32,500.00
    $286.00
    $340.00
    $3,000.00
    $3,800.00
    $7,000.00
    $1,601,600.00
    $323,000.00
    $3,000.00
    $45,600.00
    $14,000.00
    $1,600.00
    $64,000.00
    $2,600.00
    $140,400.00
    $9,000.00
    $144,000.00
    $40,000.00
    $40,000.00
    $17,000.00
    $68,000.00
    $4,120,439.25
    $15,000.00
    $554,501.39
    $650.00
    $2.00
    $15,000.00
    $554,501.39
    $6,500.00
    $440.00
    $180.00
    $2,700.00
    $100.00
    $20,000.00
    $0.40
    $490.00
    $2,572.00
    $2,572.00
    $160.00
    $272,000.00
    $140.00
    $112,000.00
    $23.88
    $293,724.00
    $40.00
    $164,000.00
    $30.00
    $30,000.00
    $60.00
    $3,000.00
    $0.40
    $490.00
    $12.50
    $25,000.00
    $1,250.00
    $16,250.00
    $100.00
    $130.00
    $2,500.00
    $3,500.00
    $5,500.00
    $560,000.00
    $123,500.00
    $2,500.00
    $42,000.00
    $11,000.00
    $650.00
    $26,000.00
    $2,250.00
    $121,500.00
    $8,500.00
    $136,000.00
    $472,950.00
    $472,950.00
    $9,500.00
    $38,000.00
    $3,052,117.39
    $65.00
    $74,750.00
    $200.00
    $18,000.00
    $500.00
    $5,000.00
    $185.00
    $11,100.00
    $45.00
    $10,125.00
    $250.00
    $5,000.00
    $900.00
    $9,000.00
    $7,500.00
    $7,500.00
    $0.01
    $20.00
    $140,495.00
    $4,260,934.25
    $65.00
    $74,750.00
    $65.00
    $5,850.00
    $3,500.00
    $35,000.00
    $20.00
    $1,200.00
    $50.00
    $11,250.00
    $1,250.00
    $25,000.00
    $1,500.00
    $15,000.00
    $8,500.00
    $8,500.00
    $1.00
    $2,000.00
    $178,550.00
    $3,230,667.39
    $30,200.00
    $5,000.00
    $320.00
    $5.00
    $30,200.00
    $5,000.00
    $3,200.00
    $1,100.00
    $125.00
    $1,875.00
    $40.00
    $8,000.00
    $0.60
    $735.00
    $2,500.00
    $2,500.00
    $132.60
    $225,420.00
    $148.87
    $119,096.00
    $18.33
    $225,459.00
    $55.00
    $225,500.00
    $55.00
    $55,000.00
    $155.00
    $7,750.00
    $4.00
    $4,900.00
    $12.25
    $24,500.00
    $1,815.00
    $23,595.00
    $90.00
    $130.00
    $1,740.60
    $2,342.00
    $5,000.00
    $504,000.00
    $123,500.00
    $1,740.60
    $28,104.00
    $10,000.00
    $824.24
    $32,969.60
    $1,320.81
    $71,323.74
    $5,513.59
    $88,217.44
    $7,500.00
    $7,500.00
    $6,000.00
    $24,000.00
    $1,855,185.38
    $65.00
    $74,750.00
    $100.00
    $9,000.00
    $100.00
    $1,000.00
    $100.00
    $6,000.00
    $35.00
    $7,875.00
    $50.00
    $1,000.00
    $100.00
    $1,000.00
    $4,000.00
    $4,000.00
    $4.00
    $8,000.00
    $112,625.00
    $1,967,810.38
    Page 2 of 2
    UWS, Inc.
    (OC)
    UNIT PRICE
    TOTAL PRICE
    $10,000.00
    $75,000.00
    $300.00
    $6.00
    $10,000.00
    $75,000.00
    $3,000.00
    $1,320.00
    $250.00
    $3,750.00
    $0.01
    $2.00
    $0.01
    $12.25
    $0.01
    $0.01
    $213.60
    $363,120.00
    $213.00
    $170,400.00
    $18.00
    $221,400.00
    $35.00
    $143,500.00
    $30.00
    $30,000.00
    $300.00
    $15,000.00
    $0.01
    $12.25
    $15.00
    $30,000.00
    $1,000.00
    $13,000.00
    $85.00
    $140.00
    $2,500.00
    $4,000.00
    $6,000.00
    $476,000.00
    $133,000.00
    $2,500.00
    $48,000.00
    $12,000.00
    $1,000.00
    $40,000.00
    $1,000.00
    $54,000.00
    $10,000.00
    $160,000.00
    $75,000.00
    $75,000.00
    $1,000.00
    $4,000.00
    $2,084,016.51
    $65.00
    $74,750.00
    $150.00
    $13,500.00
    $0.01
    $0.10
    $120.00
    $7,200.00
    $35.00
    $7,875.00
    $0.01
    $0.20
    $1,500.00
    $15,000.00
    $6,000.00
    $6,000.00
    $0.01
    $20.00
    $124,345.30
    $2,208,361.81
    km
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...BL081-26 NOT Cannonwolde Drive Water Main Replacement Buyer Contact : Anna.West@GwinnettCounty.com... CANNONWOLDE DRIVE ...

    Gwinnett County

    Bid Due: 6/16/2026

    ...BL081-26, Cannonwolde Drive Water Main Replacement Gwinnett County Government May 13, 2026 @ ...

    State Government of Georgia

    Bid Due: 6/29/2026

    ...Calhoun Bids and Proposals Bid #2026-00299 - Water main relocation SR 156 over ...

    City of Calhoun

    Bid Due: 6/18/2026

    ...RFB 26-55-02 John Kay High Service Area Water Main Bartow County Government May ...

    State Government of Georgia

    Bid Due: 6/09/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.