| Location: | Florida |
|---|---|
| Posted: | Apr 21, 2025 |
| Due: | May 14, 2026 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-12391 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 26101100 | Electric alternating current AC motors |
| 72121509 | Underground Electrical Services |
| 72141115 | Electrical cable laying service |
| 72141122 | Electric power line construction service |
| 72151502 | Electric power system construction service |
| 73152108 | Electrical equipment maintenance and repair service |
Link to Solicitation Announcement Here:
https://vendors.planetbids.com/portal/62171/bo/bo-detail/128715
The Central Florida Tourism Oversight District (CFTOD) seeks a contractor for replacement of our multiple Live front switches with 9 Dead front PME switches, which includes, but is not limited to pads, 15kV 200amps load break elbow connectors and 15kV 600/900 amps T-OPII elbow connectors. In addition to the installation of the PME switches, contractor shall be removing transformers, installing transformer and reconfiguring the circuit by running new cables, splicing into existing cables and directional drilling. This work will take place at multiple locations throughout CFTOD property.
The scope of this project includes providing concrete encased duct bank, directional drilled conduits, direct buried conduits, electric pull boxes, temporary generator support and switch pads. Providing 15kV cable splices and cable terminations as indicated. Installing Owner-furnished PME type pad mounted switches and Owner-furnished 15kV cable. Contractor shall provide generators and MOT as required.
NOTE: This project will be a multi-year project covering multiple locations and will require planning the work and coordinating and requesting multiple outages. These outages will depend on approval from The Walt Disney World Company and/or Reedy Creek Energy Services (RCES).
The above descriptions are intended to give a general definition of the Scope of Work and shall not be construed to be an itemized listing of all elements of work involved. The Contractor shall be responsible for the construction of complete facilities, conforming in all respects to the details and requirements of the specifications, drawings, and other contract documents.
Please direct all questions to:| Description | Date/Time |
| C006826 MFMP Bid Flyer | Apr 22, 2025, 7:15:10 AM |

With GovernmentContracts, you can:
...Drilling of approximately 7,400 LF of 12" DR-11 HDPE and open-cut placement of ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/23/2026
...Drilling of approximately 7,400 LF of 12" DR-11 HDPE and open-cut placement of ...
City of DeLand
Bid Due: 6/23/2026
...were few restrictions on drilling of drainage wells until 1966; since that time, ...
City of Orlando
Bid Due: 6/11/2026
..., monitoring well drilling, sampling, reports, studies, recommendations, design, inspection services...
City of Hollywood
Bid Due: 7/22/2026