| Location: | Texas |
|---|---|
| Posted: | Aug 21, 2025 |
| Due: | Oct 16, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB_No._25-1368 |
| Publication URL: | To access bid details, please log in. |
RFB_No._25-1368
Posted
Allison Sheeler
(254) 761-3153
Allison.Sheeler@Brazos.org
10/16/2025
10:00 AM
K4600
21+ Days for Solicitation Notice
8/21/2025
8/21/2025 4:47 pm
95115-Infrastructure and Infrastructure Improvements;
96891-Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, And Long Term Planning;
RFB and drawings can be downloaded at BidNet Direct: https://www.bidnetdirect.com/texas/brazosriverauthority
The Trinity Well #1 is located on the campus of the Brazos River Authority’s (BRA) East Williamson County Regional Water System (EWCRWS) water treatment plant (EWCWTP) and is expected to add up to 4 million gallons of water per day (MGD) to the EWCWTP. The modifications and improvements to blend this new groundwater source into the existing EWCWTP’s finished water is the Phase 1B Trinity Well Infrastructure Project. The purpose of the Phase 1B project is to cool, disinfect, and blend The Trinity Well #1 water with the existing EWCWTP’s finished water.

With GovernmentContracts, you can:
...Bid Number: 6941 Bid Title: Developer- Led Public-Private Partnership (P3) Brackish Groundwater... a ...
City of Portland
Bid Due: 7/09/2026