| Location: | Texas |
|---|---|
| Posted: | Aug 21, 2025 |
| Due: | Oct 16, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB_No._25-1368 |
| Publication URL: | To access bid details, please log in. |
RFB_No._25-1368
Posted
Allison Sheeler
(254) 761-3153
Allison.Sheeler@Brazos.org
10/16/2025
10:00 AM
K4600
21+ Days for Solicitation Notice
8/21/2025
8/21/2025 4:47 pm
95115-Infrastructure and Infrastructure Improvements;
96891-Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, And Long Term Planning;
RFB and drawings can be downloaded at BidNet Direct: https://www.bidnetdirect.com/texas/brazosriverauthority
The Trinity Well #1 is located on the campus of the Brazos River Authority’s (BRA) East Williamson County Regional Water System (EWCRWS) water treatment plant (EWCWTP) and is expected to add up to 4 million gallons of water per day (MGD) to the EWCWTP. The modifications and improvements to blend this new groundwater source into the existing EWCWTP’s finished water is the Phase 1B Trinity Well Infrastructure Project. The purpose of the Phase 1B project is to cool, disinfect, and blend The Trinity Well #1 water with the existing EWCWTP’s finished water.

With GovernmentContracts, you can:
...Project: Water Treatment Services Ref. #: JKJ-250402 Type: RFP Status: Open Open Date: ...
Dallas Independent School District
Bid Due: 10/15/2026
...Bid Number: 2026-25-40-01 Bid Title: Request for Bids - Water Treatment Chemicals Category: ...
City of Mansfield
Bid Due: 9/30/2026
...Project: Mowing for South Water Treatment Plant Ref. #: ITB 26-19771-YB Type: ITB ...
City of Lubbock
Bid Due: 9/30/2026
...Bid Information Type Invitation to Bid Status Issued Number 27 7D100 (Water Treatment: ...
Education Service Center, Region 2
Bid Due: 11/05/2026