REQUEST FOR PROPOSALS FOR SPORT SHOOTING PARK SOUND TESTING

Location: Colorado
Posted: Aug 6, 2026
Due: Sep 9, 2026
Agency: Clear Creek County
Type of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
  • H - Quality Control, Testing, and Inspection Services
  • Q - Medical Services
Publication URL: To access bid details, please log in.
Bid Title: REQUEST FOR PROPOSALS FOR SPORT SHOOTING PARK SOUND TESTING
Category: Special Projects
Status: Open
Description:

Request for Proposal

Clear Creek County Noise/Sound Measurements around the new public “Clear Creek Sport Shooting Park”

Dumont, Colorado

PURPOSE

The Clear Creek Board of County Commissioners is seeking a consultant or team with relevant experience and qualifications in conducting sound testing and measurements of the noise levels around a local public shooting range and provide information and a comparison to a 2019 report in a form understandable to the public.

In November of 2018, the County was awarded a Colorado Parks & Wildlife grant to redesign an existing private gun range site for a new public shooting park.

In 2019, the County contracted a sound study to be completed, in order to establish a testing program and protocol to enable sound/noise testing to be replicated after construction of the new public range.

The new public shooting range is now open and the County seeks to retain a noise/sound testing/measurement consultant to replicate the 2019 “Clear Creek County Shooting Range Ambient Sound Study” sound study program for comparison of baseline sound levels at and near the subject site in a variety of weather conditions, times of day, days of the week, and during special shooting events.

The purpose of this Request-for-Proposal is to identify and select a qualified consultant to conduct testing and characterize noise levels relative to surrounding conditions and the previous report.  It will include numerical standards along with segments measuring the noise levels of the new range.

PROJECT DESCRIPTION

The new shooting range is located at 3204 Stanley Road, Dumont, Colorado and is approximately 5 acres in size.  It is managed and operated by the Clear Creek Metropolitan Recreation Center. Clear Creek runs north of the property adjacent to I-70.  The site is bounded at its rear (south) by additional County and private lands.

This project will utilize the previously 2019 protocol to establish current conditions and compare the sound/noise levels in the area.

SCOPE OF SERVICES

  1. Utilize the testing program and protocol established in the 2019 “Clear Creek County Shooting Range Ambient Sound Study” to replicate sound/noise testing as closely as possible. (Exhibit A)
  2. Sound/noise testing/measurement at the subject site location as well as the six other sites for 10 days;
  3. Sound/noise testing/measurement in various weather conditions—e.g. windy vs. calm conditions;
  4. Sound/noise testing/measurement at different times of day;
  5. Sound/noise testing/measurement during at least one special event at the shooting range and during no shooting activity;
  6. Sound/noise testing/measurement via an announced date/time to invite County staff, Rec District staff, and members of the public for observation;
  7. Sound/noise testing/measurement in decibels with other familiar noise comparisons to provide information about noise levels in a form understandable to the public;
  8. Sound/noise testing/measurement with explanation of how the sound measurement is taken with examples of utilized technology;
  9. Full report with findings and summary of the comparison of the 2019 Study due by November 2, 2026.
  10. Bid package;
  11. Project administration.
  12. Cost Proposal.

SCHEDULE

The tentative Request-for-Proposal schedule is as follows:

SCHEDULED ITEM

DATE

Public Request-for-Proposal for Noise/Sound Measurement Services

August 6, 2026

Deadline for Submission of Questions

August 17, 2026

Deadline for Responses to Submitted Questions

August 20, 2026

Deadline for Submittals (4:00 p.m.)

September 9, 2026

Selection/shortlist

September 10, 2026

Oral Presentations/Interviews (if necessary)

Week of September 14th, 2026

Estimated Notice of Intent Award

September 17, 2026

Estimated Starting Date

ASAP

Completion Deadline

November 2, 2026

Any revisions to the above schedule will be posted on the Clear Creek County website “Bid Postings” link.  It is the responsibility of all submitting firms to review this website for scheduling updates as well as Request-for-Proposal modifications and addendums.

SUBMITTAL REQUIREMENTS:

The Request-for-Proposal response shall include the following information and shall be organized as follows:

Cover Letter

Table of Contents

  1. Firm Overview :  Provide concise details of your Firm which includes information describing size, services, credentials, qualifications and expertise, office location and specific experience in sound/noise measurement/testing.
  2. Relevant Experience :  Provide specific examples of relevant sound measurement (minimum 3) projects of similar scope and complexity the Firm has completed in the last five years.   Include Client references for each Project submitted.
  3. Project Approach :  Provide a detailed narrative and proposed schedule describing your specific approach as well as your ability to meet the needs of this Project.  Outline your understanding of the Project and identify critical issues based on your Firms’ experience.

Appendix:

Provide any other information – unique capabilities, value-added services, etc. – relevant to the County’s evaluation of your Firm.

Response information shall be limited to the information requested as noted above.

Clear Creek County will not be responsible for any cost associated with the preparation of the Firms’ responses to this Request-for-Proposal.

SUBMISSION OF RESPONSE:

Responses shall be submitted in a package clearly identified as follows:

RESPONSE TO REQUEST FOR PROPOSAL:

Clear Creek County Noise/Sound Measurements around the new public Clear Creek Sport Shooting Park

The firm shall submit 3 hard copies and one electronic copy of their response to this Request-for-Proposal.

Firms may not contact any team members, staff or employees of Clear Creek County or other parties involved in this project.  All communications regarding this project should be directed to:  Lisa Leben, Clear Creek County Representative.

Please deliver your responses to:

Lisa Leben, Special Projects Manager

Clear Creek County

[Delivery address only]:   Clear Creek County Courthouse, 405 Argentine Street

[Mailing Address] P.O. Box 2000

Georgetown, CO 80444

For security reasons, you must enable JavaScript to view this E-mail address.

The deadline for submitting a Response is 4:00 p.m. local time on September 9, 2026.

Responses will be time-stamped and logged upon receipt.  Responses received after the deadline will NOT be considered and will be returned unopened.  All timely and properly prepared Responses will be considered for evaluation.

SELECTION


The County will appoint a Selection Committee.  The Selection Committee will analyze the submittals and will evaluate the Firms regarding their qualifications and expertise, including, but not limited to, relevant experience, capability of professional staff, location, project approach and demonstrated performance as well as ability to maintain budget and schedule considerations.

RESERVATIONS:

The County reserves the right to reject any and all Responses and to waive any informality, technical defects or clerical errors in any Reponses as the best interest of the County may require.  Selection procedures will be conducted in conformance with all applicable qualifications-based selection requirements.

ADDITIONAL INFORMATION

Questions & Inquiries:

Applicants may submit written questions to Lisa Leben, Clear Creek County Special Projects Manager via email to For security reasons, you must enable JavaScript to view this E-mail address.

Contract

The County’s Professional Services Agreement will be the contract used by the consultant selected. (Exhibit B).

Addenda

The County reserves the right to issue addenda to the Request-for-Proposal at any time as a result of questions, change in schedule or other matters.

Changes

The County also reserves the right to cancel or reissue the Request-for-Proposal.

Publication Date/Time:
8/6/2026 1:00 AM
Closing Date/Time:
9/9/2026 4:00 PM
Related Documents:

Attachment Preview

Clear Creek County Shooting Range
Ambient Sound Study
Wave #2108
Prepared for:
Ms. Lisa Leben
Special Projects Manager
Clear Creek County
PO Box 2000
Georgetown, CO 80444
Prepared by:
Jeff
Digitally signed by Jeff Kwolkoski
DN: cn=Jeff Kwolkoski, o=Wave
Engineering, Inc., ou,
Kwolkoski email=jeffk@WaveEngineering.c
o, c=US
Date: 2019.11.14 17:10:47 -07'00'
Jeffrey P. Kwolkoski, P.E., INCE Bd. Cert.
Wave Engineering, Inc.
November 14, 2019
Clear Creek County Shooting Range Ambient Sound Study
November 14, 2019
Contents
Introduction and Executive Summary........................................................................................................... 1
Sound Level Measurement Procedures........................................................................................................ 2
Test Locations ........................................................................................................................................... 2
Test Equipment ......................................................................................................................................... 3
Weather Conditions ...................................................................................................................................... 6
Daily Sound Test Results and Observations................................................................................................ 10
Test Results ............................................................................................................................................. 10
Comments on Daily Sound Levels at Each Location................................................................................ 12
Location 1............................................................................................................................................ 12
Location 2............................................................................................................................................ 12
Location 3............................................................................................................................................ 12
Location 4............................................................................................................................................ 13
Location 5............................................................................................................................................ 13
Location 6............................................................................................................................................ 13
Shooting Events Sound Levels and Observations ....................................................................................... 13
October 9, 2019 Sheriff’s Department.................................................................................................... 13
October 12, 2019 IDPA Pistol Shooting Competition ............................................................................. 17
Analysis of the Sound of Gunshots at Measurement Locations ................................................................. 18
Findings and Conclusions ............................................................................................................................ 28
i
Clear Creek County Shooting Range Ambient Sound Study
November 14, 2019
List of Figures
Figure 1: Temperature & Relative Humidity, Fri 10/4/19 to Sun 10/6/19* ................................................. 7
Figure 2: Wind Speed (blue) & Wind Direction (red) data, Fri 10/4/19 to Sun 10/6/19* ............................ 7
Figure 3: Temperature & Relative Humidity, Sun 10/6/19 to Sat 10/12/19 ................................................ 8
Figure 4: Wind Speed (blue) & Wind Direction (red) data, Sun 10/6/19 to Sat 10/12/19 ........................... 8
Figure 5: Temperature & Relative Humidity, Sun 10/13/19 to Mon 10/14/19* .......................................... 9
Figure 6: Wind Speed (blue) & Wind Direction (red) data, Sun 10/13/19 to Mon 10/14/19*..................... 9
Figure 7: Common Sound Levels (in dBA) ................................................................................................... 11
Figure 8: 15 minute period with 1second sound levels (Sheriff’s practice) at Location 6......................... 15
Figure 9: 15 minute period with 1second sound levels (Sheriff’s practice) at Location 1......................... 16
Figure 10: 15 minute period with 1second sound levels (during IDPA) at Location 1............................... 17
Figure 11: 15 minute period with 1second sound levels on Oct. 10 at Location 1 ................................... 18
Figure 12: 15 minute period with 1second sound levels on Oct 4 at Location 3 ...................................... 19
Figure 13: 15 minute period with 5second sound levels on Oct. 5 at Location 4 ..................................... 20
Figure 14: 15 minute period with 5second sound levels on Oct. 10 at Location 4 ................................... 21
Figure 15: 15 minute period with 5second sound levels on Oct. 12 at Location 4 ................................... 22
Figure 16: 15 minute period with 5second sound levels on Oct.5 at Location 5 ...................................... 23
Figure 17: 15 minute period with 5second sound levels on Oct. 10 at Location 5 ................................... 24
Figure 18: 15 minute period with 5second sound levels on Oct. 12 at Location 5 ................................... 25
Figure 19: 15 minute period with 1second sound levels on Oct. 5 at Location 6 ..................................... 26
Figure 20: 15 minute period with 1second sound levels on Oct. 10 at Location 6 ................................... 27
Figure 21: 15 minute period with 1second sound levels on Oct. 12 at Location 6 ................................... 28
List of Appendices
Appendix A: Vicinity Map
Appendix B: Daily Sound Data
Appendix C: Weather Data
Appendix D: CCC and Wave Subjective Observations during Shooting Events
Appendix E: Acoustic Terminology
ii
Clear Creek County Shooting Range Ambient Sound Study
November 14, 2019
Introduction and Executive Summary
Wave Engineering (Wave) measured sound levels in the vicinity of the Clear Creek County Sportsmen
Club (CCCSC) shooting range located at 3300 Stanley Road in Clear Creek County, Colorado. Please refer
to Appendix A for an 11"x17" Vicinity Map of area the shows test locations. The CCCSC is a private club
that operates the shooting range on Clear Creek County (CCC) owned land. CCC is considering expanding
the range with a public range component. This study was commissioned by CCC to determine the
existing ambient sound levels in the vicinity of the range. The purpose of the study is provide
information and data to inform the county on the current sound environment in the area. The county
may use this information to help plan the future range and evaluate its potential impact on people in
the area.
Evaluation of a detailed plan for the potential future public shooting range is not included in this study.
This report summarizes Wave’s study of the existing sound levels in the area.
The ambient sound levels in the area include gunshots from the CCCSC range and also traffic on
Interstate 70 (I70) and secondary roads north and south of I70. Wave Engineering continuously
measured sound levels at six locations for a period of 10 days. The testing equipment at one location
malfunctioned, so data for 10 days is only available from five locations. The 10 day time period was
selected to allow measurements during a variety of weather conditions and wind directions, and to
include two planned shooting “events” at CCCSC.
In addition to placing the sound level monitors at six locations, Wave Engineering personnel were on site
for the two following shooting events at CCCSC. On October 9, 2019, the Clear Creek County Sheriff’s
Department shot pistols and rifles for approximately two hours. On October 12, 2019, CCCSC hosted an
International Defensive Pistol Association (IDPA) pistol shooting competition.
The ten days of monitoring provided a great deal of sound level data. The continuous data for each day
have been plotted and the charts are provided in Appendix B. In addition, the report includes “higher
resolution” data at selected times to demonstrate specific points or findings.
The CCCSC shooting range operates during daytime hours. This study shows that the background sound
level during these hours varies from approximately 50 dBA to 68 dBA, with average sound levels often in
the range of 60 to 65 dBA.
Shooting occurred every day during the test period, but the sound of gunshots had no effect on the 15
minute average sound levels at the five locations (not including Location 2). However, gunshots are
audible at times through the area. Whether or not gunshots are audible depends on many factors
including the firearm, ammunition, which shooting lane is being used, the background sound level, and
the wind and atmospheric conditions.
1
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Communications, Network, Engineering, Cybersecurity, and Information Technology Services... Office FA2518 USSF SPOC/SAIO ...

DEPT OF DEFENSE

Bid Due: 12/23/2026

...Follow Communications, Network, Engineering, Cybersecurity, and Information Technology Services... Office FA2518 USSF SPOC/SAIO ...

DEPT OF DEFENSE

Bid Due: 12/23/2026

...Follow Communications, Network, Engineering, Cybersecurity, and Information Technology Services... Office FA2518 USSF SPOC/SAIO ...

DEPT OF DEFENSE

Bid Due: 12/23/2026

...Follow Communications, Network, Engineering, Cybersecurity, and Information Technology Services... Office FA2518 USSF SPOC/SAIO ...

DEPT OF DEFENSE

Bid Due: 12/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.