5720 - Construction Management Services for Canyon Road over Anderson-Cottonwood Irrigation Canal Bridge Widening Project

Location: California
Posted: Aug 7, 2026
Due: Aug 28, 2026
Agency: City of Redding
Type of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Open Date Description Close Date

August 07, 2026
5720 - Construction Management Services for Canyon Road over Anderson-Cottonwood Irrigation Canal Bridge Widening Project
OPEN

August 28, 2026

Attachment Preview

August 7, 2026
REQUEST FOR PROPOSAL
FOR
CONSTRUCTION MANAGEMENT SERVICES FOR
CANYON ROAD OVER
ANDERSON-COTTONWOOD IRRIGATION CANAL BRIDGE WIDENING PROJECT
FOR THE
CITY OF REDDING, CALIFORNIA
(Schedule Number 5720)
In accordance with the provisions of the Municipal Code of the City of Redding, sealed
proposals must be submitted to the City Clerk’s 3rd floor office located at City Hall, 777 Cypress
Avenue, Redding, California 96001 prior to 3:00 p.m. PT, Friday, August 28, 2026, for furnishing
the City of Redding a proposal for providing Construction Management Services for Canyon Road
over Anderson-Cottonwood Irrigation Canal Bridge Widening Project per the attached scope of
work and general conditions.
PROPOSALS RECEIVED AFTER THIS TIME AND DATE MAY NOT BE ACCEPTED
OR CONSIDERED.
The said proposals will be opened at 3:00 p.m. PT, on Friday, August 28, 2026, in the
designated City Hall Conference Room as posted in the main lobby of City Hall, 777 Cypress
Avenue, Redding, California.
The proposer shall provide the original (unbound), four (4) copies and a USB drive with a
PDF copy of the proposal. Electronic submission of proposals will not be allowed. One (1) set of
the Fee Proposal is to be submitted in a separate, sealed envelope. Proposal package may be
obtained
from
the
City’s
website,
https://www.cityofredding.gov/government/departments/purchasing/bid_opportunities.php. The
City will award any resulting contract in a manner consistent with the City Purchasing Ordinance.
The cut-off date and time for receiving questions regarding this bid is 5:00 p.m. PT, on
Monday, August 17, 2026. All inquiries must be made in writing and may be submitted to the
email address shown below.
THE CITY OF REDDING
Purchasing Division
Michelle Kempley, Purchasing Officer
mkempley@cityofredding.gov
NOTE
If a potential bidder/proposer received this solicitation document through
some means other than surface mail from the City of Redding (such as from the City
of Redding Internet web site, or from another prospective bidder/proposer), it is the
responsibility of the potential bidder/proposer to advise the assigned City of Redding
Purchasing contact of its intention to submit a bid/proposal so that any addenda or
other correspondence related to this solicitation will be sent to the potential
bidder/proposer. When contacting the Purchasing Division, the bidder/proposer shall
provide the solicitation number located on the cover page of this document.
Transmittal of this information must be in writing, by U.S. Mail, or e-mail.
Transmittal of this information via telephone is not acceptable.
Please submit bid/proposal as directed in the RFP package. Forward to:
City of Redding
City Clerk
777 Cypress Avenue
Redding, CA 96001
Proposals must be received by the City Clerk’s office prior to 3:00 p.m. PT on the date
indicated below. Mailing envelope is to be clearly marked on the outside with the following
notation:
“Proposal for Schedule No. 5720; opening at
3:00 P.M., on Friday, August 28, 2026”
Note: Signatures must be legible, indicating full first and last name.
The City of Redding
Purchasing Division
REQUEST FOR PROPOSALS
FOR CONSTRUCTION MANAGEMENT SERVICES FOR
CANYON ROAD OVER
ANDERSON-COTTONWOOD IRRIGATION CANAL BRIDGE WIDENING PROJECT
SCHEDULE NO. 5720
I. INTRODUCTION
The City of Redding (City) is soliciting proposals for construction management services
including inspection, materials testing, and resident engineering duties for the Canyon
Road Bridge Over Anderson Cottonwood Irrigation District (ACID) Bridge Replacement
Project (Project). The map included location shows the general location of the project in
the City of Redding. Funding for the Project is a combination of 88.53% Federal Highway
Bridge Program (HBP) and 11.47% City matching funds. The federal project number is
BRLS-5068(037).
The plans, specifications, and estimates for the Project are being prepared by Morrison
Structures Inc., GHD and City staff. The existing Canyon Road Bridge (State Bridge No.
06C-0307) over ACID Canal was originally built in 1970. The 28 foot by 96-foot bridge
is a continuous 3-span reinforced concrete slab with reinforced concrete pier walls and
reinforced concrete diaphragm type abutments all supported on spread footings. The
Caltrans Bridge Inspection Report list the bridge as “Functionally Obsolete”. The bridge
is located approximately 0.2 miles southwest of State Route 273 and carries Canyon Road
which is classified as a local urban collector.
The Project includes widening the bridge to a width of 40 feet, constructing 129 feet of
type 732SW concrete barrier and 117 feet of type 842 concrete barrier railing, relocation
of a 16-inch Ductile Iron Pipe (DIP) water main, replacement of an 8-inch water main and
4-inch gas main, and providing a 2-inch Asphalt Concrete Overlay between the bridge
curbs. The road work includes about 700 feet of variable width widening, cold milling,
and 570 tons of paving, 400 cubic yards of base, over 4,000 square feet of sidewalk and
driveways, 700 feet of curb and gutter, 210 feet of 16-inch DIP, ADA ramps, 126 feet of
metal guard railing, drainage, signs, striping and utility work. The bridge work includes
152 cubic yards of Structure Excavation, 108 cubic yards of Structural Concrete, 24,000
lbs. of Bar Reinforcing Steel and 3,100 square feet of Deck Seal. All quantities are
approximate.
The current construction cost estimate, not including contingencies or construction
management, is about $2.9 million. There will be 180 working days for construction of the
Project.
This scope of work includes Services Prior to Construction, Services During Construction
and Services After Construction. A Consultant Services Agreement will be executed for
the combined services. It is the intent of the City to hire a consultant who will provide
complete construction management, resident engineering, perform materials testing and
inspect the construction of the project with minimal support from City personnel.
II. REVIEW OF BACKGROUND INFORMATION
The following items are available via the shown links below and can be accessed
through the City of Redding’s Engineering – Public Works Bid Opportunities
webpage.
Engineering – Public Works Bid Opportunities “Bid 5721”
Plans
Project Specifications
Project Categorical Exemptions/Categorical Exclusion
City of Redding Construction Standards Construction Standards (CORCS)
III. GENERAL
The Consultant shall play an active role in the management of the project to maintain the
project schedule and budget and to protect the City against defects and deficiencies on the
part of the Contractor. Services provided during construction will, in general, consist of
project management, construction contract administration, construction inspection, and
materials testing including source inspection as needed. In doing so, the Consultant will
serve as the focal point for coordination between the Contractor, the City, the Design
Consultant, regulatory agencies, and utility companies. These services shall be in
accordance with the City’s Quality Assurance Plan (QAP).
The Consultant’s work plan and expected level of effort should consider the schedule
imposed on the Contractor, including what can be reasonably expected for overtime
inspection.
The Consultant will be responsible for their own office and administrative space including
telephone, restroom and computer facilities. The City will not provide these facilities.
The consultant shall assure the City that it will comply with the Americans with Disabilities
Act (ADA), as well as all applicable regulations and guidelines issued pursuant to the ADA
(42 U.S.C. 12101 et seq.).
The Consultant must comply with Government Code Section 8355 in matters relating to
providing a drug-free workplace.
The Consultant shall reference the attached links and Caltrans Office Bulletin 22-06 for
Certification of Indirect Costs and Financial Management System that replaces the
previous Exhibit 10-K form and provides a replacement for Exhibit 10-A, A&E Consultant
Financial Document Review Request.
Instructions for Requesting A&E Consultant Indirect Cost Rate (ICR) Financial Document
Reviews (FDR) | IOAI
Certification of Indirect Costs and Financial Management System
Financial Document Review Request Form
IV. SCOPE OF SERVICES
Prior to Construction
1. File Review – Review project files and plans including quantity calculations;
memorandums to Resident Engineer; geotechnical reports; hydraulic studies; discovery
plans; etc.
2. Schedule Review – Prepare a tentative schedule that identifies construction stages, utility
relocations, notification timelines for permits and agreements, and all items that will be
submitted by the Contractor for review and approval.
3. Pre-construction Conference – Organize a preconstruction conference with the
Contractor, Subcontractors, City, to discuss the work involved, administrative matters,
labor compliance, safety and accident prevention, answer questions from the contractors,
and address issues that need to be resolved before work commences.
During Construction
4. Construction Meetings – Conduct regularly scheduled construction status meetings to
review project schedule, potential change orders, progress payments, and future material
testing needs; facilitate decision making and discuss issues that have the potential of
adversely affecting the project budget, schedule, or product. Consultant shall prepare
meeting agenda in consultation with City Construction Manager.
5. Coordination – Coordinate all administrative, inspection, and testing activities of the
construction contract.
6. Contract Documents – Interpret the intent of the plans and specifications to protect the
City against defects and deficiencies on the part of the Contractor and maintain the
project budget and schedule.
7. Labor Compliance – Perform labor compliance tasks, including verifying certified
payrolls, subcontractor and apprentice utilization, and labor interviews.
8. Progress Reports – Prepare monthly progress reports and submit to the City. The
reports will address the progress of the work, the project schedule, information/decisions
required to maintain the schedule and complete deliverables, problems encountered that
may affect schedule, budget, work products, anticipated work for the following week and
month, and should contain photographs documenting the progress of the work.
9. Contractor Inquiries – Prepare responses to RFI’s in compliance with the plans,
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...a consultant to provide construction management support and related services as needed and ...

City of Los Angeles

Bid Due: 9/03/2026

...Project ID: E1304-26S Title: Professional Project Management, Construction Management.../29/2026 Due Date: 9/14/2026 Follow ...

City of Manhattan Beach

Bid Due: 9/14/2026

...Project ID: E1304-26S Title: Professional Project Management, Construction Management.../29/2026 Due Date: 8/31/2026 Follow ...

City of Manhattan Beach

Bid Due: 8/31/2026

...Construction Management for the Hill Road over Mill Creek Bridge Replacement Project Department... ...

Mendocino County

Bid Due: 9/15/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.