Finance and Administrative Services Department –
Purchasing Division
RFQ #367-OC5466
Request for Qualifications for
Construction Manager at Risk Services for The Renovation and
Construction of Sheriff's Office Facilities
Orange County, North Carolina
Date of Issue: November 3, 2025
Proposal Opening Date: December 2, 2025
At 2:00 P.M. ET
Direct all inquiries concerning this RFQ to:
Jovana Amaro
Finance Manager - Purchasing
Phone: 919-245-2651
Email: finance-purchasing@orangecountync.gov
Electronic responses ONLY will be accepted for this solicitation.
Page 1 of 16
1. Project Overview:
Orange County is now accepting Statements of Qualifications for Construction Manager-
at-Risk (“CMAR”) Services for two separate but related projects:
1.) The renovation of the Link Center, a 26,000 sq. ft administrative building, that
will become the new Sheriff’s Office. The Link Center is located in downtown
Hillsborough at 200 South Cameron Street. The Link Center was abandoned in
2019 due to significant water intrusion, which resulted in widespread mold growth.
Environmental remediation, including mold abatement and water intrusion mitigation,
must be completed before any renovation. The current project budget adopted in the
FY 25-35 Capital Investment plan is $16,914,576
2.) The construction of a 6,000 sq. ft Sheriff’s Office evidence storage building on
the same site as the existing Detention Center, located at 1200 US Hwy 70 North.
Currently, evidence is stored in the basement of the old Jail. The current project
budget adopted in the FY 25-35 Capital Investment plan is $2,430,000
2. Anticipated Project Schedule:
Project Activities
Schematic Design
Design Development
Construction Documents/Permitting
Construction Bidding
Construction
Completion
Dec 2025
April 2026
November 2026
December 2026
May 2028
3. Project Design Team:
Orange County is in the process of selecting a firm to provide engineering and design
services for both projects. The selected CMAR will coordinate with the selected design
firm for the duration of the pre-design, design, and construction phases of the projects,
which we expect to be bid together as part of a cost savings initiative.
4. Scope of Construction Manager at Risk (CMAR) Services
The scope of services below is meant to provide interested firms with an outline of the
anticipated services required for this project. The detailed scope of services will be
contained in the executed Contract for CMAR Services. The County intends to use the
attached template contract, with modifications, as the form of agreement.
Page 2 of 16
A. Pre-Construction Services
1. Review the current schematic budget and project schedule and identify key
project issues.
2. Develop design development cost estimate and project schedule; Reconcile
from the schematic phase to the design development phase.
3. Develop construction documents cost estimate and schedule; Reconcile from
the Design Development Phase to the Construction Documents Phase.
4. Research different construction materials and report findings.
5. Regularly attend meetings with the County and Design Team before
construction and consult with the County and the Design Team regarding site
use, site improvements, and selection of building materials, systems, and
equipment.
6. Develop a provisional and final schedule indicating methods and sequencing
of procurement, permitting construction, and project closeout. Include time
requirements for sequences and durations; milestones dates for receipt and
approval of design documents; receipt of regulatory approvals and permits;
preparation and processing of shop drawings and samples; delivery schedule
of materials or equipment requiring long-lead-time procurement, project
procurement schedule, and installation and construction completion. This
includes periodic project schedule updates for the Design Team's review and
County approval.
7. Develop and implement procedures for schedule adherence.
8. Perform a “constructability" review of the design documents at each design
phase.
9. Provide detailed construction cost estimates to achieve the Owner's budget (to
be sorted by trade bid packages).
10. Develop value-engineering options as necessary.
B. Bidding Services
1. Subdivide the Work into bid packages encouraging bids from qualified local and
minority contractors.
2. Identify and prequalify contractors for all bid packages in consultation with the
County.
3. Develop requirements to ensure time, cost, and quality control during
construction.
Page 3 of 16
4. Provide a provisional construction schedule (CPM) for issuance with bid
packages.
5. Schedule and conduct pre-bid conferences with the Design Team and County.
6. Advertise and distribute bidding documents.
7. Monitor bidder activity.
8. Publicly open, review, and analyze bids with the County and Design Team.
9. Update Project schedule.
10. Conduct MWBE outreach program to encourage participation by minority
contractors and report on efforts
11. Upon receipt and review of the bids for all bid packages, develop a draft
Guaranteed Maximum Price (GMP) document for the Project that includes:
i. The cost of the Work (the sum of bid amounts of the lowest
responsible bidder for all bid packages)
ii. The Construction Manager's Fee
iii. The Construction Manager's General Conditions
iv. The Construction Manager's Contingency
12. Reconcile schedule and cost with the County against the pre-established
budget and schedule.
13. Develop a Final Guaranteed Maximum Price document for the Project.
C. Construction Services
1. Maintain on-site staff for construction management.
2. Establish and maintain coordinating procedures.
3. Develop and maintain a detailed schedule (CPM) that includes delivery,
approvals, inspection, testing, construction, and occupancy.
4. Conduct and record job meetings.
5. Prepare and submit change order documentation for approval of the Design
Team and Owner.
6. Maintain a system to review and approve shop drawings, samples, and product
data.
7. Maintain records and submit bi-weekly reports and formal monthly reports to
the Design Team and Owner.
8. Maintain quality control and ensure conformity with plans.
Page 4 of 16
9. Develop a system and provide cost control through progress payment review
and verifications according to the approved schedule and contract amounts.
10. Develop and maintain as-built drawings for the duration of the Project.
11. Coordinate post-completion activities, including assembling guarantees,
manuals, closeout documents, training, regulatory approvals, and the Owner's
final acceptance.
12. Coordinate and monitor the resolution of remaining “punch-list" items to the
Owner’s satisfaction.
13. Coordinate Systems Commissioning activities.
14. Work closely with Designer and County staff to meet local, state, and federal
requirements
D. Project Closeout/Warranty
1. Assist the Owner with furniture, furnishings, and equipment deliveries and
installation.
2. Submit record drawings for approval of the Designer and the Owner
3. Assist in the transition to occupancy
4. Receive, record, and address all warranty issues.
5. Resolve all warranty issues to the satisfaction of the Owner
5. Notice to Providers Regarding RFQ Terms and Conditions
The Provider shall be responsible for reading the instructions, Orange County’s
terms and conditions, all relevant exhibits and attachments, and any other
components of this RFQ and complying with all requirements and specifications
herein. Providers are also responsible for obtaining and complying with all
Addenda and other changes that may be issued in connection with this RFQ.
If Providers have questions, issues, or exceptions regarding any term, condition,
or other component within this RFQ, they must submit questions in accordance
with the instructions in Section 5.2 PROPOSAL QUESTIONS. If Orange County
determines that any changes will be made due to the questions asked, then such
decisions will be communicated in the form of an RFQ addendum.
5.1 RFQ Schedule
The table below shows the intended schedule for this RFQ. Orange County will
make every effort to adhere to this schedule. All times listed in this RFQ are
Eastern Standard Time (EST).
Page 5 of 16
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.