Coastal Waterways Inventory RFP

Location: Mississippi
Posted: Aug 7, 2026
Due: Sep 10, 2026
Agency: Southern Mississippi Planning & Development District (SMPDD)
Type of Government: State & Local
Category:
  • B - Special Studies and Analyses - Not R&D
Publication URL: To access bid details, please log in.
Download
Coastal Waterways Inventory RFP

Attachment Preview

REQUEST FOR PROPOSALS
Coastal Waterways Inventory Project
Request for Proposals Issued: August 7, 2026
Proposal Due: September 10, 2026 at 11:00AM CST
Table of Contents
SECTION 1: INTRODUCTION............................................................................................... 3
SECTION 2: PROJECT OVERVIEW ..................................................................................... 3
Scope of Work........................................................................................................................ 4
Project Schedule .................................................................................................................... 5
SECTION 3: FINAL DELIVERABLES ........................................................................................ 5
SECTION 4: PRICING AND FEES............................................................................................. 6
SECTION 5: RFP SUBMISSION REQUIREMENTS .................................................................. 6
SECTION 6: PROPOSAL EVALUATION AND SELECTION PROCESS.................................... 7
Project Understanding and Technical Approach: 40 Points .................................................... 8
Project Team and Firm Qualifications: 25 Points .................................................................... 8
Relevant Project Experience: 25 Points.................................................................................. 8
Budget: 10 Points ................................................................................................................... 8
SECTION 7: QUESTIONS/REQUESTS FOR CLARIFICATION ................................................ 8
SECTION 8: CONDITIONS AND LIMITATIONS ........................................................................ 8
REQUEST FOR PROPOSALS (RFP)
Coastal Waterways Inventory Project
Issued by: SMPDD
SECTION 1: INTRODUCTION
The Southern Mississippi Planning and Development District, Inc. (SMPDD) is issuing this
Request for Proposals (RFP) to solicit proposals from qualified firms to provide professional
services for a comprehensive coastal waterways inventory and dredging needs assessment for
non-federal waterways along the Mississippi Gulf Coast. For the purposes of this RFP, non-
federal waterways refer to any historically maintained tidally-influenced, coastal channels,
bayous, canals, and other navigation corridors that are not federally maintained. The selected
proposer will evaluate existing channel conditions, identify maintenance dredging needs,
develop a geospatial inventory of coastal waterways, and assist the counties in obtaining
maintenance dredging permits, and authorization for submerged aquatic vegetation (SAV)
mitigation sites.
Mississippi’s coastal waterways provide critical access for commercial fishing, recreational
boating, tourism, and emergency response. Many non-federal channels, bayous, and navigation
corridors experience recurring sedimentation that restricts navigation and requires periodic
maintenance dredging. However, a comprehensive inventory of these waterways, their existing
conditions, maintenance history, and long-term dredging needs has not been developed.
SMPDD is seeking a multidisciplinary consultant team with demonstrated expertise in
hydrographic surveying, geographic information systems (GIS), environmental permitting,
submerged aquatic vegetation (SAV) assessment and management, and project management.
The selected consultant team will evaluate sediment accumulation and shoaling, assess
maintenance dredging requirements, perform SAV assessments, compile data into a GIS-based
waterways inventory, and develop recommendations for future dredging priorities.
Key objectives of this project are to establish a coordinated maintenance dredging program by
assisting Hancock, Harrison, and Jackson Counties in obtaining county-wide, ten-year
maintenance dredging permits, as well as the necessary authorizations for at least three (3)
SAV mitigation sites across the Coast.
The completed inventory, assessment, and permitting documentation will provide local
governments with a long-term planning tool for prioritizing maintenance dredging.
SECTION 2: PROJECT OVERVIEW
The project goal is to assess current navigation conditions in coastal Mississippi waterways to
identify areas where sediment accumulation compromises vessel access and infrastructure
safety, develop a comprehensive coastal waterways inventory that catalogs rivers, bayous,
channels, and harbor access points, including their depths, widths, and dredging history,
evaluate submerged aquatic vegetation (SAV) presence and health to ensure dredging and
sediment management practices support ecological integrity, provide data-driven
recommendations for prioritizing maintenance dredging, sediment placement and SAV
mitigation that balances navigation needs, coastal restoration, and wetland protection, and
enhance coastal resilience by linking navigation infrastructure planning to wetland and estuarine
ecosystem health supporting storm surge mitigation and hurricane protection.
The selected team will collaborate with SMPDD and the coastal communities to create a
comprehensive coastal waterways inventory and dredging needs assessment for Hancock,
Harrison, and Jackson Counties. A prime consultant will lead a multidisciplinary team that may
include, but not be limited to: engineers, surveyors, GIS specialists, environmental scientists,
and permitting specialists. The team should include a minimum of four (4) firms (including the
prime and subcontractors) of substantial contribution, demonstrate local area knowledge and
expertise coupled with regional scale and depth necessary to complete the project in a timely
and effective manner.
The project will compile existing information, perform hydrographic and SAV assessments,
evaluate shoreline shoaling, estimate maintenance dredging needs, and prioritize waterway
dredging based on navigation importance, public safety, economic value, and maintenance
frequency. The project will also develop a long-term permitting strategy. The consultant team
will prepare permit application packages and coordinate with federal and state resource
agencies to obtain ten-year maintenance dredging permits for each coastal county, and SAV
mitigation site authorization for at least three (3) sites.
Scope of Work
1. Project Management and Coordination: The prime consultant shall provide overall project
management, quality assurance/quality control, schedule management, and administration
of all subcontractors. The prime consultant shall serve as the primary point of contact and
be responsible for coordinating all project activities and deliverables.
2. Dredging Needs Assessment: The team shall conduct field investigations, as necessary,
to evaluate existing channel conditions of non-federal navigation waterways throughout
Hancock, Harrison, and Jackson Counties. The team shall analyze bathymetric survey data,
historic dredging records, existing channel conditions, and other available information to
identify current and future maintenance dredging needs. The assessment shall identify
critical shoaling areas, estimate maintenance dredging requirements, evaluate maintenance
frequency, and prioritize waterways requiring immediate or periodic maintenance based on
navigation importance, public safety, and operational needs. Please discuss in your
proposal any additional investigations required to determine the dredging needs.
3. Coastal Waterways Inventory: The consultant shall develop a comprehensive geospatial
inventory of non-federal waterways throughout Hancock, Harrison, and Jackson Counties.
For each waterway, the inventory must include existing channel depths, sediment
accumulation rates, historic dredging records, existing permits, municipal maintenance data,
estimated dredging needs, and maintenance priority rankings. The inventory shall be
delivered in a fully editable GIS format compatible with ESRI software.
4. SAV Assessment: The consultant shall evaluate the presence, distribution, and condition of
SAV within the project areas to support the acquisition of ten-year maintenance dredging
permits and permits required for SAV mitigation sites. The assessment shall include the data
collection, mapping, and documentation necessary to satisfy applicable permitting
requirements.
5. Final Report: The consultant shall prepare a draft report documenting the results of the field
surveys, dredging needs assessment, and coastal waterways inventory. The draft report
shall include recommendations for maintenance dredging priorities and an implementation
plan for future maintenance activities. The draft report shall be submitted to SMPDD and
participating counties for review and comment. The consultant shall incorporate or otherwise
address comments received and submit a final report reflecting the revisions.
6. Maintenance Dredging Permitting: The consultant shall coordinate with the U.S. Army
Corps of Engineers and other applicable federal and state regulatory agencies and perform
all services, including preparation, submission, and revision of permitting applications and
responses to agency comments or requests for additional information, required to obtain
final permitting determinations for county-wide, ten-year maintenance dredging permits for
eligible waterways within Hancock, Harrison, and Jackson Counties.
7. SAV Mitigation Site Authorization: The consultant shall coordinate with the U.S. Army
Corps of Engineers and other applicable federal and state regulatory agencies and perform
all services required, including preparation, submission, and revision of permitting
applications and responses to agency comments or requests for additional information, to
secure authorization for at least three (3) SAV mitigation sites located across the Coast.
Project Schedule
SMPDD anticipates that the dredging needs assessment, coastal waterways inventory, SAV
assessment and final report will be completed within 12 months of contract execution. SMPDD
anticipates that the maintenance dredging permitting and SAV mitigation site authorization will
be completed within 24 months of contract execution. SMPDD recognizes that the consultants
may structure their process differently; however, SMPDD expects a clear project schedule,
milestone dates, and a plan that ensures all deliverables will be completed within 24 months of
contract execution.
SECTION 3: FINAL DELIVERABLES
Deliverables for the project include:
1. Coastal waterways inventory and dredging recommendations. The final coastal
waterways inventory shall be delivered to SMPDD in GIS file formats compatible with
ESRI software. The final report, maps, engineering analyses, and all supporting work
products shall be provided electronically in PDF format. In addition, access to any
background information, data, field survey data, and other information compiled over the
course of the project must be provided without restriction.
2. Ten-year maintenance dredging permits for Hancock, Harrison, and Jackson
Counties. The consultant shall perform all services required to obtain final permitting
determinations for ten-year maintenance dredging permits for Hancock, Harrison, and
Jackson Counties that include all eligible waterways. The required deliverable shall be a
final written determination from the U.S. Army Corps of Engineers approving or denying
each requested permit. Submitting a permit application alone shall not satisfy the
requirement of this task.
3. Permitted SAV Mitigation Sites: The consultant shall perform all services required to
obtain final permitting determinations for SAV mitigation sites, strategically located
across the coast. A minimum of three (3) approved sites is expected. The required
deliverable shall be a final written determination from the U.S. Army Corps of Engineers
approving or denying each requested permit. Submitting a permit application alone shall
not satisfy the requirement of this task.
Once completed and delivered to SMPDD, the final products and all related work materials,
documents, files, data, and information become the sole and exclusive property of SMPDD,
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Name Type of Bid Bid No. Department Bid Advertising Dates Bid Closing

Jackson State University

Bid Due: 9/23/2026

Procurement Details Smart Number 1731-27-R-PREQ-00004 Advertised Date 08/19/2026 12:00 AM RFx # 3200001531

State Government of Mississippi

Bid Due: 9/28/2026

Solicitation Title Deadline Date Deadline Time Documents Types Bid File - 1294 Campus-wide

University of Mississippi.

Bid Due: 9/17/2026

Follow FY 26 - FY 31 Unaccompanied Housing Wi-Fi Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 9/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.