| Location: | Vermont |
|---|---|
| Posted: | Feb 13, 2026 |
| Due: | Mar 13, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Construction (Building), Building Rehabilitation, Concrete Bid Description: Basement improvements in small commercial building under Corrective Action Plan (SMS#2022-5139): Demo and remove old metal equipment/tank, repair undermined foundation, replace damaged structural beam and columns, install 15-mil (min.) vapor barrier and sub-membrane depressurization system, and install spray polyurethane foam; optional exterior asphalt swale construction. BABAA and DBRA will apply to this project. RFB documents (including bid specs, drawings, bid form etc.) can be downloaded at the link below or by emailing David Jensen at djensen@stone-env.com. PW to access folder is: 30HenryStreetRFB. https://stoneenvironmentalvt-my.sharepoint.com/:f:/g/personal/djensen_stone-env_com/IgD3NOjbdDujRbbTpbLp9oY0Acq6NoxY9JkVheQfGyxY3Ag?e=lIQlVI
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...: $200,000.00 RFQ Number: Stone Environmental Inc. 535 Stone Cutters Way Third Floor ...
State Government of Vermont
Bid Due: 6/25/2026
.../2026 4:00 PM Intent To Bid Deadline: Est. Dollar Value: $0.00 RFQ Number: ...
State Government of Vermont
Bid Due: 6/10/2026
...the pathways will also be the construction of dry-laid stone retaining walls/seat walls, ...
State Government of Vermont
Bid Due: 6/16/2026
.... Remove and reinstall existing razor ribbon E. Install and regrade crushed stone ...
State Government of Vermont
Bid Due: 6/10/2026