| Location: | California |
|---|---|
| Posted: | Aug 7, 2026 |
| Due: | Sep 2, 2026 |
| Agency: | City of Los Angeles |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 231310 |
| Publication URL: | To access bid details, please log in. |
| Opportunity ID | 231310 |
| Organization | City of Los Angeles |
| Department | Engineering Bureau, Public Works |
| Stage | Open |
| Contact Name | Michael Womack |
| Contact Email | michae.womack@lacity.org |
| Category | Construction |
| Bid Method | Whole Item |
| Type | TOS - Task Order Solicitation |
| Description | ■ Only the following five Contractors can bid on this project as a Prime Contractor:• Calex Engineering• Clarke Contracting• Jilk Heavy Construction, Inc.• Mike Prlich & Sons, Inc.• Mladen Buntich Construction Company▬ ♦ The 17537 Tramonto Drive Bulkhead project site is located in the Castellammare area of the Pacific Palisades in Los Angeles, approximately 0.75 miles northwest of the intersection of Sunset Boulevard and Pacific Coast Highway. At the project site, the existing timber bulkhead on the southwest (downslope) side of Tramonto Drive was damaged in the Palisades Fire. After additional tieback analysis, it was determined that a full bulkhead replace would be required. This project will mitigate the threat to public safety and restore lateral support the roadway by constructing a new bulkhead retaining structure downslope of the existing damaged timber bulkhead on Tramonto Drive. ♦ The new proposed bulkhead will be approximately 320 feet in length and will be constructed with cast-in-drilled-hole (CIDH) piles with steel wide flange beams and colored pre-cast concrete lagging. The project also includes installation of new asphalt concrete paving, 12-inch high concrete curb and gutter, pedestrian handrail and a metal beam guardrail, and regrading and one tree removal to widen the roadway. The existing wall will be substantially abandoned in place, and will require removal of all timber lagging, new drilled weepholes through existing shotcrete, and for the existing piles to be cut approximately 3’-6” below finish surface. Existing tiebacks are to be protected in place.▬▬▬▬▬ ♦ See bid package for full scope & details ♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder ♦ For Bid Results visit http://engineering.lacity.gov/contractors/ |
| Prime NAICS | |
| Prime NAICS | Industry |
| 237310: Highway, Street, and Bridge Construction | Construction |
| 237990: Other Heavy and Civil Engineering Construction | Construction |
| 238110: Poured Concrete Foundation and Structure Contractors | Construction |

With GovernmentContracts, you can:
...Basic Information Title IFB 26-42014-000 Tree Maintenance and Removal Services Agency Department... to ...
State Government of California
Bid Due: 9/21/2026
...are invited for the following work: The University seeks to hire a contractor ...
UCLA Capital Programs
Bid Due: 10/13/2026
...PURPOSE OF WORKS AND REQUIRED SERVICES... ........................................................................5 CITYWIDE TREE INVENTORY AND MAINTENANCE PLAN.....................................................8 ...
City of Coalinga
Bid Due: 9/22/2026
..., elevator tower, service area, and additional rooms. The work involves new office ...
Ventura County
Bid Due: 10/14/2026