| Location: | Vermont |
|---|---|
| Posted: | Feb 13, 2026 |
| Due: | Mar 6, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Paving Contractor, Road Construction Bid Description: CASTLETON STP PC25 (1) - BEGINNING IN THE TOWN OF CASTLETON ON VT ROUTE 4A (MAIN STREET) NEAR INTERSECTION WITH SAND HILL RD AT STA 145+85 (MM 2.762) AND EXTENDING EASTERLY FOR A DISTANCE OF 5763 FT (1.091 MILES) AND ENDING JUST BEFORE BRIDGE 7 AT STA. 203+48 (MM 3.854) WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES COURSE-MILLING, RESURFACING WITH LEVELING AND WEARING COURSE, PAVEMENT MARKINGS, SIGNAGE, AND OTHER RELATED HIGHWAY ITEMS. FAIR HAVEN STP PC25 (2) - BEGINNING IN THE TOWN OF FAIR HAVEN ON VT ROUTE 4A (PROSPECT ST) 870 FT EAST OF THE RAILROAD CROSSING AT STA. 48+60 (MM 0.920)AND EXTENDING EASTERLY FOR A DISTANCE OF 8033 FT (1.521 MILES) AND ENDING ABOUT 1150 FT EAST OF THE INTERSECTION WITH DUTTON AVE AT STA. 129+55 (MM 2.454) WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES COURSE-MILLING, RESURFACING WITH LEVELING AND WEARING COURSE, PAVEMENT MARKINGS, SIGNAGE, AND OTHER RELATED HIGHWAY ITEMS. ENGINEERS CATEGORY E.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...CONSTRUCTION: WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES FINE-MILLING AND RESURFACING THE...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026
...TOWN OF HIGHGATE. TYPE OF CONSTRUCTION: WORK TO BE PERFORMED UNDER THIS PROJECT ...
State of Vermont - Agency of Transportation
Bid Due: 6/12/2026
...TO BE PERFORMED UNDER THIS PROJECT INCLUDES FINE-MILLING AND RESURFACING THE EXISTING HIGHWAY...
State Government of Vermont
Bid Due: 6/12/2026
..., MILLING AND PAVING WITH A LEVELING COURSE FOLLOWED BY A WEARING COURSE ...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026