Project ID: 2026-IFB-LM-0000
Title: Glenarm Battery Energy Storage System Construction
Addenda: 3
Release Date: 3/16/2026
Due Date: 5/28/2026
Pasadena Water and Power ("PWP"), a department of the City of Pasadena ("City"), is inviting bids for the construction of a 25 Megawatt ("MW") utility-scale lithium iron phosphate Battery Energy Storage System (“BESS”) with a minimum storage capability of four (4) hours to be constructed at PWP's Glenarm Power Plant location. Construction of the BESS Project must adhere to all applicable local, state, and federal regulations and protocols.
This contract covers construction-only services, as the complete design and engineering documents have already been finalized and are included in this bid package. The selected contractor will be responsible for construction, equipment installation, wiring, termination and testing of their scope of work to deliver a fully operational BESS facility compliant within the contract.

With GovernmentContracts, you can:
...Project ID: 2026-RFP-0189 Title: Design-Build Services for Solar and Energy Storage Installations... Design-Build ...
City of Pasadena
Bid Due: 10/20/2026
...Basic Information Title RESD-PMDB 2026-09 DSH PATTON STATE HOSPITAL ELECTRICAL INFRASTRUCTURE...-09 DSH PATTON ...
State Government of California
Bid Due: 10/16/2026
...Basic Information Title RFQ/P Progressive Design-Build Project Reference No. DB-2026-01 - Kane... Professional ...
State Government of California
Bid Due: 12/04/2026
...and Maintenance Other Services (except Public Administration) 238210: Electrical Contractors Construction... and Supplies ...
City of Los Angeles
Bid Due: 10/30/2026