| Location: | California |
|---|---|
| Posted: | Apr 30, 2026 |
| Due: | May 28, 2026 |
| Agency: | City of Pasadena |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-IFB-LM-0000 |
| Publication URL: | To access bid details, please log in. |
Project ID: 2026-IFB-LM-0000
Title: Glenarm Battery Energy Storage System Construction
Addenda: 3
Release Date: 3/16/2026
Due Date: 5/28/2026
Pasadena Water and Power ("PWP"), a department of the City of Pasadena ("City"), is inviting bids for the construction of a 25 Megawatt ("MW") utility-scale lithium iron phosphate Battery Energy Storage System (“BESS”) with a minimum storage capability of four (4) hours to be constructed at PWP's Glenarm Power Plant location. Construction of the BESS Project must adhere to all applicable local, state, and federal regulations and protocols.
This contract covers construction-only services, as the complete design and engineering documents have already been finalized and are included in this bid package. The selected contractor will be responsible for construction, equipment installation, wiring, termination and testing of their scope of work to deliver a fully operational BESS facility compliant within the contract.

With GovernmentContracts, you can:
...Project ID: 26-087-RFP Title: Electrical Engineering Services, Recreation Center Door Holders... Addenda: 0 ...
City of West Sacramento
Bid Due: 11/20/2026
...Basic Information Title RESD-PMDB 2026-11 ELECTRICAL ENGINEERING - RETAINER SERVICES Agency... Division Project ...
State Government of California
Bid Due: 11/13/2026
...Due Date NIGP Codes NIGP 92531 Electrical Engineering NIGP 91340 Construction, Pipeline NIGP ...
San Diego County Water Authority
Bid Due: 12/31/2026
...Professional engineering services - Electrical & electronic engineering - Electrical engineering... services 81101500 ...
State Government of California
Bid Due: 12/04/2026